chapter 33 DOB

Lakukan tugas rumah & ujian kamu dengan baik sekarang menggunakan Quizwiz!

Documents necessary for oxygen storage.

#/size of containers enclosed construction location of risers/outlets location of equipment

These scaffolds shall be made of non-combustible material.

+75' exterior +21' interior Occupancy group 1

Monitoring required during course of excavation when __.

-Buildings are within distance of excavation that is equal to or less than the max depth of excavation. -Historic structures contiguous to or within 90ft from edge of lot.

A training course shall be considered with __ year after year expiration for rigging.

1

Inboard length of outrigger beam shall be min __ times the outboard length.

1 1/2 times

Loads shall not be placed on side of excavation closer than __.

1 1/2 times the depth of excavation

Supported scaffolds on roof within distance of __x the height of scaffold from edge shall be tied back/netting.

1 5x

A training course shall be considered timely if completed with __ year after expiration for rigging.

1 year

Chutes less than 24" dim

1" thick wood 1/8" steel

Chutes less than 24" dim

1" thick wood 1/8" thick steel

Ramps/runways for workers shall be min __ft __inches in clear width.

1' 6"

Medical gases max storage

1,500scf

Erection/dismantling tower crane plans shall include __.

1. Identification of equipment 2. identification of assemblies 3. location of equipment 4. a weight list 5. center of gravity 6. sequence of operation 7. calibration 8. cranes in lot 9. contact info.

Where there is a change in elevation in a walkway for public it can not be steeper than __ with a 5ft level landing at top and bottom of each slope.

1/12 horizontal

The safety zone for demo shall be equal to __ the height of building.

1/2

Compressed gases shall not be placed where it may fall more than __ the height of container.

1/2 height of container

Scaffold rope shall be replaced if loss more than __ of original diameter of wire occurs.

1/3

Platforms shall not deflect more than __ span.

1/60

All workers at major building site shall have min within the past 5 years an OSHA __.

10

Adjoining property owners shall be notified I'm writing no less than __ days prior.

10 days

Notification to adjoining property for soil work must be made written no less than __ days prior to start.

10 days

Notification to adjoining property for soil work must be made written not less than __ days prior to start.

10 days.

Major building

10 or more stories or 125' or footprint of 100,000sqft or designated by commissioner.

All equipment not being used min __ft from all enclosed perimeters.

10'

Bracing required for formwork exceeding __ft.

10'

Foundations for shores more than __ft shall be designed.

10'

Access shall be provided within __ft of temporary fire department connections.

100ft

Fiber rope shall not be used more than __ft or __ stories

100ft 100 stories

Lateral loads no less than __p/f.

100p/f

No deleterious, caustic, or acid materials shall be within __ft of any tree.

10ft

Wedges shall not be used within __ft of perimeter of building.

10ft

Reshores within __ft of building must be secured.

10ft.

Curbs shall be provided for any buggie traffic path closer than__ft to unenclosed area.

10ft. or which a fall of more than 12" is possible.

Platforms 10 ft or less shall not extend over __inches. Unless tied down or guardrails to prevent access.

12 inches

Viewing panels shall be __ inches by __ inches. and shall be blocked with plexiglass.

12" by 12"

Total rise of ramp used by workers carrying materials/wheel barrows shall not exceed __ft without horizontal landings

12'

Compressed gases shall not be exposed to temperature above __ºF.

125 ºF

Fence signs no more than __ft on each perimeter facing public.

12ft

Runways/Ramps for vehicles shall be min __ft wide.

12ft

Standpipe alarm shall be heard during working & non working hours at least __dBa bit not more than __dBA.

15 dBA 110 dBA

Max aggregate indoor acetylene storage not to exceed __scf

15,000scf

Light duty sidewalk sheds for work less than 100ft may be light duty to carry live load of __ pounds per sqft.

150lbs per sqft

Suspended scaffold installer/user. __hours every __ years. __hour refresher.

16 hours every 4 years 8hr refresher

Demo special inspection is in chapter __.

17

Debris netting for scaffold shall be __ gauge __inch.

18 gauge 1/2 inch

Fire hoses for demo explosive operations shall provide continuos flow of __ gallons per minute.

180 gallons per minute Min reach - 35ft Pressure tested 600ppsi

Platforms more than 10ft shall not extend more than __inches unless tied down or guardrails.

18inches

When intermediate supports for guardrails are used they shall not be more than __inches apart.

19"

Space between platforms and uprights on scaffold is no more than __ inch.

1inch

Escape hatch shall be constructed with at least __ fixed vertical ladders.

2

The permit holder shall notify the department no more than __ days following the complete removal of shed.

2 days.

Ramps for people and hand carts shall be min __inch thick and secured.

2"

The space between shed and opening of floor shall be decked with __inch planking.

2"

Adjoining roof protection shall consist of __.

2" flame retardant foam under 2" flame retardant wood plank. extend 20' from building.

Deck of sidewalk shed shall consist of __inch thick plank. The decking shall be brought right to face of structure.

2" thick

Chutes more than 24" dim.

2" thick wood 3/16" steel

Chutes more than 24" dim

2" wood 3/16" steel

A __inch connector down stream of FDNY connection shall be provided for release of air system.

2.5inch

Two point suspended scaffolds shall be min __inches but no more than __inches in width.

20" min 36" in width

When major building is being constructed you must protect adjoining equipment/specs within __ft of unenclosed perimeter.

20'

Crane licenses A__ B__ C__

200 unlimited cherry picker

When floor opening is used for removal of material mesh may be used but must not deflect more than 2" at __lbs.

200lbs

Any building greater than 25ft any window that is within __ft of opening used to pass material shall be covered.

20ft

Sidewalk shed installed to protect area above 100ft shall extend __ft additional on both sides.

20ft

You must protect adjoining windows __ ft away from unenclosed perimeter.

20ft

Vertical loads shall include dead and live loads. Live loads shall be no less than __ pounds per sq ft.

20lbs per sq ft

No section of wall with a height __x its thickness shall stand without bracing.

22x

Chutes constructed of combustible material shall be covered with __.

24 gauge steel

if soil work does not begin you must notify department no more than __hours prior but no later than the scheduled date.

24 hours

If soil work does not begin you must notify department no more than __ hours prior but no later than the scheduled date.

24 hours.

Pre jump safety meeting must take place no more than __ hours prior to jump.

24 hours.

Prior to initial installation and final removal of suspended scaffold the department shall be notified __ to __ hours prior.

24 to 48

The department shall be notified __ to __ hours prior to demo.

24 to 48 hours

You must notify department __ to __ hours prior to soil or foundation work.

24 to 48 hours

You must notify department __ to __hours prior to soil or foundation work.

24 to 48hours

Pre-jump safety meetings must take place no more than __ hrs prior to jump.

24hrs

Viewing panels shall be provided every __ft.

25 linear ft

Openings in any floor shall not be more than __% of the floor

25%

Openings in any floor shall not be more than __% of the floor.

25%

In buildings of non-combustible material, floor slabs up to __ feet may be removed for temp storage of material.

25'

Power buggies shall be provided brakes to stop within __ft on a level surface at full load and max design speed.

25'

When a structure higher than __ft is to undergo full or partial demo a sidewalk shed is required.

25'

Oxygen service pressure __ psig. Bursting pressure __psig.

250psig 1,000psig.

Pressure to be maintained in dry system shall not exceed __psig.

25psig

Power buggie ramps shall be __ft wider than the outside width of any power buggie.

2ft

When material is located on working deck that is above the level of horizontal safety net it may be stored __ft from unenclosed perimeter.

2ft

Platforms used as working areas shall be __inches thick.

2inches

Ramps used for wheelbarrows, handcarts, and hand trucks shall be at least __ft in clear width.

3 ft.

Wire rope clips for suspended scaffolds shall have min __ installed at min __ rope diameters apart.

3 installed at 6 rope diameters apart.

30 hour rigging training shall be refreshed by an 8hr course every __.

3 years.

Platforms for motor vehicles shall be min __inches thick.

3"

Open excavations can be protected by solid encloser at least __ft__inches.

3' 6"

Sidewalk shed parapets shall be at least __' __" high.

3' 6" high

Escape hatch shield shall be not less than __ft __inches.

3'8"

Maximum quantity of acetylene storage on any floor is ___scf.

3,500scf

Maximum quantity of acetylene storage on any floor is __scf.

3,500scf.

All workers involved in erection, jumping, and dismantling are required to have training of __ hours.

30 hours

Contractor sheds within __ft of structures must be made of metal or non combustible materials.

30'

All sidewalk sheds shall be heavy duty to carry a live load at min __ pounds per sqft

300lbs persqft

Rinsing operations shall not be located within __ft of any sewer, drain, or catch basin.

30ft

Concrete safety managers shall have completed a __hour course OSHA within 5 years of application.

30hr

Scaffold work shall cease when winds reach __mph.

30mph

Suspended scaffold installer supervisor. __hours __years __hour refresher.

32 hours 4 years 8 hour

Workers who install a scaffold +40ft shall have __hr training with an 8hr refresher every 4 years.

32hr

When roof being repaired there shall be no less than 1 fire extinguisher rated __.

3A-40B-C

Escape hatch ladders shall extend __ft from above floor where concrete is being placed.

3ft

Power buggy ramps where passing shall occur shall be min __ft wider than twice such buggy width.

3ft

Power buggy ramps where passing shall occur shall be min__ft wider than twice buggy width.

3ft.

Fire Department connections shall be __inch iron hose plugs.

3inch

Motor vehicle ramps shall have flooring no smaller than __inch planking full size.

3inch

Motor vehicle ramps shall have flooring no smaller than __inch planking full size.

3inch.

Air pressure in system for standpipe shall be released in __min. Test to be performed at initial installation.

3min

Wood pole splices shall be __ft in legth.

4 ft

Supported scaffold user training __ hours every __ years.

4 hours 4 years

Power buggie ramps shall with stand __ times max live load.

4 times

Wind drum hoists on suspended scaffold shall have no less than __ wraps at lowest point.

4 wraps

All workers who attach or detach articles from a hook shall possess a course 16hrs with refresher every __.

4 years 8 hrs

2 people are required to use handheld pallet jack when load is greater than __ft __inches.

4' 6"

Sidewalk shed is required when facade is to be altered over __ft.

40'

A watch person is required every __ square ft.

40,000sq ft

When a structure __ft or more in height is to be constructed within half the height of new structure, the sidewalk shed shall be installed when the building reaches the planned height of the shed.

40ft

Stairs must be brought to distance of __ft or __ floors below working deck.

40ft 4 floors

A scaffold supported is not required a permit if it is less than __ft.

40ft.

Scaffold suspended guardrail. heights & rated

42" - 100 21" - 75 Toe - 50

All guardrail heights and rated.

42" - 200lbs 21" - 150lbs Toe - 50lbs ​

If no response is received from adjoining property owner a second written notification shall be made no more than __ days and no less than __.

45 days 30 days

Excavation steps no steeper than __ degrees and no step more than __ ft high.

45 degrees 5ft

Excavation steps no steeper than __ degrees and no step more than __ ft high.

45 degrees 5ft high

Excavation sides may not slope more than __ degrees.

45 degrees.

Compressed gases must be stored upright. It may be inclined up to __.

45ºF if secured.

Openings for receiving materials on chutes shall not exceed __inches in height.

48"

Written notification shall be made to parks at least __hours prior to work.

48hours

Horizontal landings for ramps shall be min __ft in length.

4ft

Suspension wire rope shall be covered at least __ft above the hoist.

4ft

Where work or storage related to construction is occuring adjacent to a sidewalk a solid barrier at least __ft shall be provided

4ft

Existing supported scaffold planks and guardrails may be moved by person with __hour training.

4hr

Each scaffold shall be capable of holding it's own weight and __x its max intended load.

4x

Fuel for equipment shall be in containers no more than __ gallons.

5 gallons

Pre construction survey required when __.

5 to 10 ft within 10ft of adjacent building. Excavation over 10ft anywhere on site.

Concrete safety managers shall have __years of experience in concrete operations.

5 years

Walkways along conveyor belts shall be provided guardrail & toe board along the outside of the walkway when above __ft.

5'

Vaporizer/ manifold shall be tested at __psig.

500psig.

Large footprint construction 100,000sqft shall provide hydrants __.

50ft of main entrance. Every 250ft perimeter. No more than 50ft from exterior wall.

Outrigger scaffolds shall not be loaded beyond __ pounds per sq ft.

50lbs per sqft.

Drawings required for excavations __ft or more in depth and 5ft away from structures.

5ft

Excavations that are __ft or greater shall be supported.

5ft

Guardrail required on ramp greater than __ft.

5ft

Guardrails shall be provided for platforms above __.

5ft

Notification not required when hand excavation work is less than __ft depth and is 2 ft from foundations.

5ft

Sidewalks, walkways, and footbridges shall provide clear path __ft wide min.

5ft

When floor is less than 1,000 sqft material may be stored __ ft from unenclosed perimeter.

5ft

When floor is less than 1,000sqft material may be stored __ft from unenclosed perimeter.

5ft

Drawings required for excavations __ ft or more in depth. And 5 ft away from structures.

5ft.

Material that weighs 750lbs may be stored __ft from unenclosed perimeter.

5ft.

Every __ months the sidewalk shed shall be reinspected and the qualified person performing inspection shall prepare and sign an inspection report.

6 months.

Minimum overhang for supported scaffold is __inches unless cleated.

6"

outrigger beams shall not overhang less than __inches and shall be secured.

6"

Hangups or stirups shall be placed at least __ inches but no more than __inches fr edge of platform.

6" 18"

All open edges of excavation shall have guardrail when greater than __ft in depth.

6'

Viewing top of panels shall be no more than __ft above ground. Bottom of viewing panels shall be no less than __ft.

6' 3'

Project info panel specs

6' wide 4' high calibri font 1" letters white on blue background

Parapet panel for sidewalk shed specs.

6' wide 2' high 1. street address 2. name of contractor 3. for more info visit website DOB shall be at least 3' but no more than 6' from left edge.

Not more than one liquid oxygen container having max capacity of__ cubic feet may be stored indoors.

6.2 cubic ft

Temp lighting efficiency requirements.

60 lumens - 40watt 50 lumens - 15 - 40 watt 40 lumens - less than 15 watt

Compressed gas is a gas at __.

68ºF

All open edges of excavation shall have guardrail when greater than __ft in depth.

6ft

Parapet panel for sidewalk shed specs

6ft wide 2ft high street address name of contractor for more info visit website DOB shall be at least 3 ft but no more than 6ft from left side of sidewalk shed

Suspended scaffold ropes and cables shall support at least __x its max intended loads.

6x

All workers shall be orientated no later than __ days after commencing employment at site.

7 days

Hoists shall be maintained within __ stories or __ft from working deck.

7 stories 75'

Utility companies shall be notified __hours I'm advance.

72 hours

Elevator/hoist required at __ft.

75'

Hoist required when excavation is below __ft.

75'

Standpipe required when __ft below ground.

75'

Standpipe required when building reaches height of __ft.

75'

Vertical members shall be placed __ft from edge of curb cut or vehicular access point.

7ft

Power buggy curbs must be min __ inches high. Equivalent to 2"X8" plank set on edge against uprights braced every 4ft.

7inches

In steel erection there shall be no more than __ floors or 120ft between the working deck and uppermost permanent floor.

8 floors

Hoses and lines shall be hung min __ ft.

8 ft.

Lights on sidewalk shed shall extend no more than __inches.

8"

Sidewalk shed shall have a min clear ceiling height of __ft.

8'

Fences shall be __ft high.

8ft

Pre-shores must be at intervals no more than __ft on center.

8ft

Runways/ramps for motor vehicle use shall have __x__inch curbs parallel and secured to sides of ramp.

8x8inch

Prior to jumping of crane the engineer on record shall provide department __.

A signed sealed report stating: 1. inspected crane install 2. no hazards 3. crane is installed according to plan 4. tech testing records

Prior to jumping of crane the engineer of record shall provide dept __.

A signed sealed report stating: inspected crane install no hazards crane is installed according to plan tech testing records

Projectile tools

ANSI

All power buggy shall be provided controls arranged or shielded to prevent __ __.

Accidental movement.

Protection for __ footings, foundations, party walls, chimneys, skylights, and roofs are required.

Adjoining buildings

An __ shall be signed by installer of liquid oxygen system assuring proper testing.

Affidavit

Air pollution

Air pollution control code

Sidewalks, walkways, and foot bridges shall provide surface capable supporting __.

All live loads. Design live load minimum 150lbs per sqft

Rated load capacities and charts shall be conspicuously posted on __ or __.

All material handling equipment or on the job site.

When primary SSM can not be at the site __.

Alternate SSM shall act as primary. It shall be recorded in log book.

Standpipe connections can be used for purpose other than fire fighting if __.

Approved by FDNY At least 1 standpipe is maintained

Standpipe connections can be used for purposes other than firefighting if __.

Approved by FDNY and at least 1 standpipe is maintained

Fire extinguishers shall be located.

At each stairwell. Each entrance of storage/ construction shed. Flammable/ combustibles are used/stored. Cranes - min 10-B:C rating

Fire extinguishers shall be located

At each stairwell. Each entrance of storage/construction shed. flammable/ combustibles are used/stored. cranes - min 10-B:C rating.

Combustibles not stored in containers shall be removed __.

At end of each work shift.

Material/debris placed in containers or secured overnight shall be removed __.

At the beginning of the next shift.

The site safety log shall be kept __.

At the site.

The SSM shall at a min conduct daily checks to ensure standpipe is __.

Available and in a state of readiness at all times.

Material shall not be stored on platforms during demo unless a reg design prof proves it can hold 1.5x load. The evaluation must __.

Be held by permit holder at job site.

The supervisor overseeing hoisting or lowering of equipment shall __.

Be present at site be able to communicate be in line of site

Temporary walkways within site shall __.

Be protected by sidewalk shed. Enclosed along the side facing site with solid fence. Gap between fence and shed shall have netting 18 gauge 1/2inch. Enclosed in side facing street as well.

Key boxes shall __.

Be provided.

At no time shall a scaffold be loaded __ __.

Beyond capacity.

When using jack, once item has been lifted __ or __ shall be used immediately if jack does not have built in safety devices.

Blocking or cribbing

Structural frames shall be __.

Braced

Trusses shall be __ or __.

Braced or guyed.

Supported scaffolds with 4:1 ratio shall be __.

Braced.

A __ or __ at least 4"X4" at openings level with or below floor

Bumper or curb

Power buggy curbs may be omitted for dumping if __ are provided.

Bumpers.

Upon proper notification to the department any responsibility of the SSM __.

Cease.

Use of portable heating devices under supervisor with a __.

Certificate of fitness.

All control valves shall be __ and __.

Chained and locked.

The SSM shall monitor compliance with safety requirements of __.

Chapter 33

__ valves shall be installed to prevent water from entering the air compressor.

Check valves

If slope of ramp is greater than 1/8' __ shall be provided not more than __inches apart.

Cleats 14inches

Hazardous formwork if not corrected immediately shall be notified to the __.

Commissioner

Daily inspections for the cleaning of debris will be made by a __ person.

Competent

Installation, adjustment, and removal of sidewalk shed shall be performed under supervision of __.

Competent person designated by permit holder.

Suspended scaffolds shall be installed under supervision of licensed rigger or __.

Competent person designated by permit holder.

When a personnel hoist uses manual controls it shall be operated by a __.

Competent qualified operator.

It is the SSM responsibility to inspect personally on regular basis while work is in progress throughout the day __

Compliance with ch 33.

Pressure gauges for standpipe shall be located at __.

Compressor and most remote points of system from compressor.

Requirements of construction or demo of major buildings scope

Comstruct or demo of new building Vertical or horizontal enlargement Full or partial demo of major building Alt or repair of facade over 14 stories or 200 ft where sidewalk shed is required. Anything designated by commissioner.

Work cessation not required for standpipe alarm during __ operations.

Concrete

Site specific formwork drawings required when __.

Concrete for major building shore/form height greater than 14' vertical load exceeds 150lbs power buggies are used multi stage shores are used slab is 10" or more concentrated loads 2000lbs

Two separate scaffolds shall not be __.

Connected by any means.

Adjoining roof protection required when __

Construction occurs 48" above height of building.

Fiber rope shall not be used with __ substance.

Corrosive

Containers holding debris shall be __ at end of work day and when full to near the rim.

Covered

Prior to demo all asbestos shall be removed and certificate shall be filed with __ and __.

DOB & DEP

All floors, roof, and working decks shall be cleaned of debris at least __.

Daily.

Materials shall be protected against __ and __.

Damage and erosions

Adjoining property including person's theron shall be protected from __ and __.

Damage and injury.

Request for variance is required to remove __.

Damaged sprinklers.

Signs shall be posted near liquid oxygen container storage reading __.

Danger - liquid oxygen No smoking, no open flames

The site safety log shall contain the following. __

Date & location of inspection. date & names of people met with to satisfy: -any unsafe acts/dates/locations -companies/reps notified of any unsafe acts -date of notification of unsafe acts -date of correction of unsafe acts -any accident -any violations/stop work orders/dates -dates/locations of horizontal and vertical netting -dates horizontal netting removed -date building reaches 75'

Standpipe alarm system shall be connected to an active __

Dedicated power supply

DEC notification, soil work

Deeper than 500ft Geothermal

DEC notification soil work

Deeper than 500ft Geothermal

Owner or operator of oxygen trailer notify department in writing at least 48 hours prior to __.

Delivery to jobsite.

All existing check valves shall remain in place until __.

Demo work is completed.

Notification to adjoining property for soil foundation work is required when __.

Depth 5-10ft within 10ft of foundation or when any excavation over 10ft is made on site.

Notification to adjoining property for soil foundation work is required when __.

Depth 5-10ft within 10ft of foundation or when any excavation over 10ft is made on site.

Open web steel joists shall be hoisted __.

Directly to their permanent location.

Shall not be used as slings.

Discarded rope

Material/equipment on working deck shall be secured against __.

Dislodgement.

No trees outside the property line shall be __ without written permission from parks.

Disturbed

Provisions shall be made to __ any trapped water in standpipe system.

Drain

No material shall be intentionally __ or __.

Dropped or thrown

Air pressurized alarm system required for __ standpipe system.

Dry

When freezing conditions occur standpipe shall be maintained as a __.

Dry system

Standpipes during demo shall be maintained as a __.

Dry system.

Project info panel shall be posted __.

Each perimeter fronting public more than 150ft each corner panels shall be posted 4' high waterproof durable material

2 things required to install air pressure alarm system

Electrical permit Application to department

2 things required to install air pressure alarm system for standpipe __ __.

Electrical permit application to department

Project info panel shall include __

Elevation drawing work in progress/ zoning use completion date corporate name, address, & # website address or number for project info GC name and # copy of permit primary English/Spanish 311

Potential hazard exists by commissioner opinion __.

Elevations of adjacent properties shall be recorded/monitoring Procedures shall be implemented by reg design prof at intervals of 24hrs or less if movement has occured.

Potential hazard exists by commissioner opinion __.

Elevations of adjacent properties shall be recorded/monitoring procedures shall be implemented by reg design professional at intervals of 24 hours or less if movement has occurred.

Inspections shall be recorded by __.

End of day.

Site safety manager is designated to __.

Ensure compliance with SSP and all safety requirements in chapter 33.

Tie back rope shall be __ in strength to suspension rope.

Equal

Only the operator authorized by the __ shall operate a personnel hoist

Equipment user

Every opening not used for removal of debris during demo shall be covered by 2" wood or __.

Equivalent solid material.

Protection for excavation shall be installed as __.

Excavation advances

Certificate of operation

Expires 1 year from date of issuance. If renewal 60-30 days before expiration you may use crane until approved or denied.

Notify FDNY soil work

Explosives

Notify FDNY, soil work

Explosives

Abandoned sites require a __ and a __ plan.

Fence & safety monitoring plan.

Work abandoned for 3 months

Filling grading drainage

Work abandoned for 3 months.

Filling grading drainage.

Fuel shall be kept in containers that meet the requirements of the __.

Fire Department

All requirements of the __ shall be satisfied during refueling.

Fire department

All requirements of the __ shall be satisfied during refueling.

Fire department.

CSFSM is responsible to ensure construction personell are aquatinted with operation of __.

Fire extinguishers and other fire protection equipment.

Jacks shall be rested on a __ __ foundation adequate to support load.

Firm level

Jacks shall be rested on a __ __ foundation adequate to support load.

Firm level foundation

Pre shift suspended scaffolded inspections shall be performed by __

Foreman. Competent person.

Formwork observation by the __.

Formwork designer

Power buggy brakes shall be able to hold __ load stationary at 25% grade.

Full

Truck brakes shall be maintained to hold with __ load on __ grade on jobsite.

Full Any

Decking of sidewalk shed shall extend the __ width of sidewalk not to exceed __inch along fence of building.

Full length 1 inch

A pre jump/safety meeting log shall be kept by the __.

GC

SSM shall be designated by the __.

GC owner agent CM

Following parties must be present at safety coordination meeting __.

GC or designee Professional engineer of record Licensed master rigger Rigging foreman Crane safety coordinator Crane operator and oiler Site Safety Manager

The following parties must be present during pre jump safety meeting.

GC or designee master rigger crane safety coordinator SSM crane operator oiler jumping crew and back up personell flagmen signal men

A __ shall be provided at lower end of every chute.

Gate

Prior to demo all __ shall be removed.

Glass.

No power buggy shall be used unless it is in __ __ __.

Good operating condition

No power buggy shall be used unless it is __ __ __.

Good operating condition.

Notify DEP excavation

Greater than 100ft within 500ft of water tunnel

Notify DEP excavation

Greater than 100ft within 500ft of water tunnel.

Acetylene is only to be stored on __ floor and total not to exceed 3,500scf.

Ground floor

Obstructions or openings located in public way shall be marked and __.

Guarded.

Walkways/footbridges with slope greater than 1 in 20 with a rise greater than 6" you need __

Guardrails

Walkways/footbridges with slope greater than 1 in 20 with a rise greater than 6" you need __.

Guardrails

Where public may have access to charging skips __ shall be provided.

Guardrails

Hoisting equipment shall be maintained as to eliminate __ to public or property.

Hazard

Prior to demo __ shall be removed.

Hazards

Guys, ties, braces for supported scaffold.

Horizontal member not more than 4x least plan dimension vertically every 20ft 3ft wide scaffolds vertically every 26ft more than 3ft wide scaffolds

Sidewalk shed color

Hunter green

Fences shall be painted __.

Hunter green.

During demo sprinklers shall be capped __ __.

Immediately below the floor being demolished.

Permits shall be posted __ of hoisting equipment.

In the car or on equipment.

Safety coordination meetings are required prior to __.

Initial erection dismantling initial jump down if climber/cranes tower

No person shall make a safety device __.

Inoperative

Ropes used in hoisting equipment shall be __.

Inspected

After repair or adjustment of a sidewalk shed a new __ report shall be given by the qualified person.

Inspection

Following adjustment or repair of scaffold an __ is required.

Inspection

Supported scaffolds require a pre-shift __ & __.

Inspection & checklist.

After installation inspection for suspended scaffold has been completed. An __ is to be signed by person who performed inspection.

Installation inspection report

After installation inspection of a supported scaffold an __ shall be signed by person performing inspection.

Installation inspection report

Where construction will cause a decrease in frost protection for existing foundation __.

It shall be modified to restore required frost protection.

Powder actuated hand tools.

Kept in locked box kept from heat kept away from compressed gases storage area signage "danger ammunition" shall not be used on explosive atmosphere COF create safe zone behind work 1/2 inch steel plate 1 portable fire extinguisher 2# rating no more than 750,000

First responders box contents

Keys Pre fire Plan Log books Approved location If locked, city wide standard key

Vertical members of sidewalk shed shall be plumb with a tolerance of __ with "L" being distance from ground to X brace or bottom of beam.

L/100

Jack manufacturer shall designate the intended supporting point of load and max permissible __ over __ and __ applied.

Length over lever and force applied.

Site Safety Coordinator

Less than 15 stories or 200ft Has footprint less than 100,000sqft.

Cutting and capping of sprinklers shall be performed by __.

Licensed master plumber Licensed fire suppression piping contractor.

No item shall be stored on a __ duty sidewalk shed.

Light duty

Fiber ripe is limited to __ duty scaffold.

Light duty 3/4inch grade 1 manila rope

All stairs shall be __ at all times.

Lighted

To deactivate standpipe alarm the SSM must __.

Log it in site safety log call FDNY stop work if not brought back in 2 hours.

Before raising or lowering skip the operator shall __.

Make sure no one is in danger zone.

Erection, jumping, and dismantling of tower cranes shall be subject to the following requirements

Master rigger, rigging foreman, crane safety coordinator shall be on site. cranes within lot line subject to certificate of on site inspection. safety devices are inspected. load radius chart shall be posted in cabin. all safety devices have been calibrated approval procedure shall be given to rigger DOT permits for street use.

Erection, jumping, and dismantling of tower cranes shall be subjected to the following requirements.

Master rigger, rigging foreman, crane safety coordinator shall be on site. Cranes within lot line subject to certificate of on site inspection. safety devices are inspected. load radius chart shall be posted on cabin. all safety devices have been calibrated. approved procedures shall be given to rigger. DOT permits for street use.

Metal impact plate required on chutes where __.

Material is forced to change direction.

Chutes less than 45 degrees

May be open on upper side.

Containers shall be made of __, __, or __

Metal plastic non-combustible materials

Guardrail required for ramp that abuts __.

Motor vehicle traffic.

Inspection by department is required for __ suspended scaffolds.

Multi point

A water supply for fire protection shall be provided in accordance with __.

NYC Fire Code

No smoking signs shall be posted in accordance with __.

NYC Fire Code

Storage of combustible material

NYC Fire Code.

Explosives and blasting are covered under __.

NYCFC

Continuing concrete work operations after alarm the SSM shall notate in his log the __.

Names & employees & locations for completion of concrete and provide to FDNY who arrive at scene.

Certificate of approval

New certificate required when crane is modified. extensions of boom ratings are increased.

Air compressor for standpipe may use __ or air dryer.

Nitrogen

Site safety plan.

No permit shall be issued until SSP is approved.

__ signs shall be posted in all refueling or fuel storage areas.

No smoking

While mobile scaffolds are being used __.

Nobody on it.

All chute structural supports shall be made of __.

Non combustible material.

Compressed gases in solution.

Non liquid dissolved in solvent

Gates shall slide it shall swing into areas __.

Not accessible to the public.

Exhausts for internal combustion equipment shall __.

Not discharge on combustible material. Be piped outdoors

Any accident as defined by this chapter.

Notify DOB

Damage to adjoining property

Notify DOB

No flag person is present during crane operation.

Notify DOB

Permits have not been issued for sidewalk shed.

Notify DOB

Person operating crane without permit and refuses to desist from crane.

Notify DOB

Required standpipe hose connection is obstructed.

Notify DOB

Required standpipe is not capped.

Notify DOB

Required standpipe is not connected to water source or FD connection.

Notify DOB

Required standpipe is not marked with red light and sign "standpipe connection".

Notify DOB

Required standpipe valves are not in place.

Notify DOB

Sidewalk sheds are not in place.

Notify DOB

Standpipe alarm activates

Notify DOB

Supplier of sidewalk shed has not certified that shed has been erected in accordance with the drawings.

Notify DOB

A crane is being operated by unlicensed operator.

Notify DOB immediately.

A crane is being operated by unlicensed operator.

Notify department

Person operating crane without permit and refuses to desist from crane.

Notify department

The amount of people on corner scaffold shall not exceed __.

Number of motors.

When working in occupied buildings you need an __ plan.

Occupant protection plan

Portable oil fueled heaters may be used during this time without permit.

Oct 15th - May 30th

No smoking signs shall be posted__.

On all gate openings. all entrances each floor, stairway, elevator, hoist way. all entrances to buildings under construction.

Combustable waste shall be removed at least__.

Once a day.

Debris and material during demo shall be removed through __.

Openings in floor. chutes buckets hoists

No person other than the __ __ by the employer shall operate power buggy.

Operator assigned.

Flagmen required when intermittent work is conducted adjacent to areas open to use to person's __.

Other than workers.

Every jack shall be provided with a positive stop to prevent __.

Over travel or indicator *.

CSFSM shall ensure fire protection equipment are readily available and __.

Periodically inspected

Any equipment brought on to site that requires a permit shall be entered on to a separate __.

Permit log

The __ is responsible to maintain weather proofing of adjoining buildings.

Person causing construction.

Drawings for scaffolds shall provide a __ view and __ view.

Plan Elevation

Concrete Safety Manager required when __.

Pouring min 2,000 yards of concrete.

The fire safety manager shall develop/maintain an approved __ plan.

Pre fire plan

Reshores shall not be secured too tight as to __.

Pre load floor below or remove normal deflection.

Underpinning required to __.

Preserve/protect adjacent property .

The department shall be notified __ of the primary site safety manager.

Prior to the commencement of work.

Smoking is __.

Prohibited.

Warning signs, personnel, or barriers shall be provided to __.

Protect the public

Warning signs, personnel, or barriers shall be provided to __.

Protect the public.

Where existing adjoining structure is below level of construction __.

Provisions shall be made to support any increase vertical/lateral load on existing structure.

Prior to demo all steam producing devices shall be __.

Purged of steam and fuel.

All demo operations shall be monitored by a __.

Qualified person.

Installation inspection report required after installation of sidewalk shed prepared by the __.

Qualified persons.

Excavations shall be inspected after __ or __.

Rainstorms or hazard increasing event

Jacks shall be marked by etch or stamp with the __.

Rated capacity

Material handling equipment shall not be loaded in excess of the __.

Rated load specified by manufacturer.

Standpipe must be painted __.

Red.

Slurry to be used.

Reg design professional

Loads that project beyond sides of truck shall be __ or __.

Removed or securely lashed in place.

All runways/ramps shall be constructed, braced, and supported to __.

Resist lateral displacement and all vertical loads, including impact

No work shall resume unless standpipe pressure is __.

Restored.

Every chute shall be__.

Ridgedly supported and braced through out its height.

Industrial rope access required training

SPRAT IRATHA Only hand tools may be carried

The following topics are to be covered during safety coordination and pre jump meetings.

Scope of work. Roles & responsibilities. Rigging to be used. Inspection of all rigging. Review of all equipment. Permit Validity. Qualifications/training of personnel. Relevant weather warnings. Compliance with manufacturer. Softening mechanisms

Watch person must have a __ and a __ from FDNY.

Security guard cert and a fire guard cert.

Material chutes more than 45º

Shall be enclosed on all sides.

Accepted support for excavation.

Sheeting, shoring, bracing.

Accepted support for excavation.

Sheeting, shoring, or bracing.

Suspension ropes shall be __ from heat producing processes.

Sheilded

Where structures have been weakened during demo they shall be __ or __.

Shored or braced.

__ shall be provided at all FDNY connections indicating it is pressurized and where manual air release valve is located.

Signage.

Reshoring schedule shall be __.

Signed and sealed. Kept on site.

Inspections for cleaning of debris shall be noted in the __.

Site Safety Log

The name and contact info of additional site safety personnel shall be recorded in the __.

Site Safety Log

Site Safety Manager shall be informed of formwork discrepancies as it relates to __.

Site Safety.

Fences will remain until__.

Site has been filled and graded. Facade is enclosed.

A record of all inspections shall be maintained in the SSM log or __.

Site safety log.

If an alternate SSM comes to relieve primary SSM this shall be noted in the __.

Site safety log.

Projects that require a SSP the GC shall enact a __ to implement such SSP.

Site safety monitoring program.

Nylong strings shall only be used when __ have been applied to all sharp edges.

Softening

Plans for erection/jumping off tower cranes must be filed by engineer and__.

Special master rigger. 2,000lbs or less in this lifting capacity. 2,000lbs or more

__ or __ shall be erected to prevent materials from rebounding into street.

Splash boards or baffles

FDNY hose connections shall be marked with metal sign reading __ and red light at night.

Sprinkler connection

The SSM shall check weekly to verify no breach exists by visually tracing the __.

Standpipe. includes risers, cross connections, and FDNY connection.

Support devices for suspended scaffold shall be made of __.

Steel Wrought iron

Suspension ropes shall be secured by __ or __.

Steel shackes or thimbles.

Ethylene Oxide

Sterilization room ventilation

Oxygen and acetylene shall be stored in a __.

Storage cabinet.

Where item is to be placed on sidewalk shed above 150lbs per sqft such shed shall be able to carry 300ppsf, the load of item minus 150ppsf

Storage capacities

Protection for storage next to sidewalk shall extend from 4' barrier with mesh to top of sidewalk shed. 1/2inch.

Storage next to sidewalk

Class I and Class II liquids shall be __.

Stored in approved containers.

A telephone shall be provided on site in an approved location to notify Department with __ posted adjacent.

Street address Emergency # FDNY

__ documents shall be approved before demo begins.

Submittal

No power buggy shall be left unattended on any grade __ __ to cause it to coast free of engine/brake resistance.

Sufficiently steep

Any structural member being demolished shall not __.

Support any other load.

SSM not required at site during the following.

Surveying Hoist to transport personnel only Material hoist that is fully enclosed Finished trowelling of concrete Personnel provided for temp utilities Truck deliveries - sidewalk closed - within closed area

While structural members are hoisted a __ shall be used.

Tag line.

Person causing excavation shall support vertical/lateral load of adjoining structure where __.

The level of foundations is at or above the level of the bottom of new excavation.

Concrete operation material may overhang perimeter of __ __.

The material is braced and secured. it is indicated on SSP overhangs no more than 1/3 its length area is broom swept and clear of material perimeter of designated area is protected by vertical netting. horizontal netting not more than 2 stories/30 ft it is relocated next workday ​

The responsibility of affording license to enter adjoining property rests upon ___.

The owner of the adjoining property.

Observed conditions of adjoining property shall be recorded by __ and records shall be made available upon request.

The person causing the work.

If SSM discovers a violation they shall immediately notify __.

The person responsible for creating the violation.

Person causing excavation is required to preserve party walls at __.

Their own expense.

Contractors shall inform personnel __.

They are to follow all safety regulations at all times.

Every person causing a power buggy to be used shall provide __ and __ operators.

Trained and competent

When conveyor belts cross any traveled way __ shall be installed to prevent spillage and __ protection provided.

Trays overhead protection

Drawings for an excavation not required for excavations utilizing __.

Trench box

Truck loads shall be __ to prevent spillage.

Trimmed

While using machinery all loads shall be properly __ to prevent dislodgement during raising, lowering, swinging, or transit.

Trimmed

Temporary standpipe shall serve all floors where permanent stairs are required.

True

Using a torch to install roofing on a combustible roof is __.

Unlawful

During demo all stairs and shafts shall be maintained except at the __.

Upper most floor being demolished.

Adequate __ shall be provided when using flammable solvents.

Ventilation

Outrigger beams shall be placed so suspension ropes hang __.

Vertically.

The SSM shall at a minimum meet on a __ basis with the designated rep of each sub.

Weekly.

__ shall be used when a truck is traversing ramps steeper than 1/10.

Wheel blocks

When possible for public to pass under or next to ramp the space between top rail and toe board shall be enclosed with __.

Wire screen 18 gauge or synthetic netting. openings no more than 1/2inch.

Notify transit soil work

Within 200' of any tunnel

Notify transit, soil work

Within 200ft of any tunnel

Sidewalk sheds shall be constructed out of __ or __.

Wood or steel

Copies of __ and __ shall be kept at site. For hoisting equipment.

Written permit application & Approved construction documents.

Ramps and platforms for power buggy use shall be designed by__.

a qualified person.

Sidewalk shed lights shall be illuminated at __.

all times 1 foot candle 45 lumens per watt

Lift and fork truck brakes shall hold fully loaded vehicle on __ grade on jobsite.

any

No site safety manager at a site shall serve as a SSM at __.

any other site

Reshores shall be located __.

as close as practical to same location on each floor to provide continuous support.

Suspended loads shall be sulecurely __ and properly __ before they are set in motion.

balanced and slung

Scaffold pole supports shall be placed on __ and __.

base plate & mud sill

Supervisor on site for scaffold must be on site but does not need to __.

be on scaffold.

No lift or fork truck shall be loaded __ __.

beyond capacity.

Lifts and fork trucks shall be provided metal plated with etched/stamped __ __ in pounds.

capacity ratings

All house valves shall be provided with __ outlets.

capped

No owner or person shall permit use of crane without certificate of __.

certificate of approval certificate of operation certificate of on site inspection

Structural members shall be __ or __ to prevent swing.

chained or lashed

The SSM shall monitor compliance with safety requirements of __.

chapter 33

Chutes that need to be constructed of non combustible material are __.

chutes exceeding 75' in height occupancy group I buildings

Chutes that need to be constructed of non-combustible and the material are __.

chutes exceeding 75' in height and occupancy group I buildings.

Instead of 10 ft a non combustable partition not less than 18inches over gas may be used to separate gas and __.

combustable waste.

Prior to demo, area shall be cleaned of all __ material.

combustible

Hazardous formwork if not corrected immediately shall be notified to the __.

commissioner

Where much demo is to be utilized other than handheld tools the __ shall approve such work.

commissioner

The supervisor/competent person for install of scaffold shall be able to __ with all individuals.

communicate

Supported scaffold install to be supervised by __.

competent person designated by contractor.

Sidewalk shed shall not be removed until all exterior work is __.

completed.

It is the SSM responsibility to inspect personally on regular basis while work is in progress throughout the day.

compliance with chapter 33

Ropes, chains, and slings shall not be used to suspend __ gases.

compressed

Pressure gauges for standpipe shall be located at __.

compressor and most remote points of system from compressor.

The concrete safety manager shall be present during all __ operations.

concrete

Adjoining roof protection required when __.

construction occurs 48" above height of adjoining roof.

Debris that can not be removed from site by end of shift shall be placed in __.

containers

All handling and movement of material shall be __.

controlled

Sidewalk sheds shall be inspected __.

daily

The decks of the sidewalk shed shall be broom swept and cleaned of material __.

daily.

Safety coordination/pre jump logs shall include the following.

dates & times names & titles summary of what was discussed list of decisions made at meeting. certification of worker training.

All stairs will be kept free of __.

debri/material

Standpipe alarm system shall be connected to an active __.

dedicated power supply

Wind and other loads shall be considered in sidewalk shed __.

design

No storage on heavy duty shed unless it is __.

designed for storage and is clearly designated on drawings.

If SSM can not get cooperation of party creating violation he shall inform the __.

direct supervisor

Shall not be used as slings.

discarded rope

Concrete washout shall not enter any __, or leach into ground.

drain

All excavations shall be __.

drained

Structural steel members shall not be __ or __.

dropped or thrown

No material shall be intentionally __ or __.

dropped or thrown.

Air pressurized alarm system required for __ standpipe system.

dry

If trippers are used for conveyor belt a neutral device shall be installed at __ of the runway.

each end

Containers shall not be placed at __ of building.

edge

Tie back rope shall be __ in strength to suspension rope.

equal

Every excavation site shall be closed with a __.

fence

Material placed next to solid fence shall not be brought to within 1 foot of top of __.

fence or barricade

Fuel shall be kept in containers that meet the requirements of the __.

fire department

Fire safety manager to oversee __ guards.

fire guards.

Containers need not be covered at end of work day when in __ enclosed space.

fully

Non liquidized compressed gas.

gas at 68ºF

Footbridges for public shall __.

have guardrails for entire length. have cleats to prevent slipping. exposed ends shall have leveled fillers.

Comprehensive inspection of suspended scaffold required after __ winds.

high

Any permanent change of primary SSM requires __ notification to the department

immediate

Hoisting equipment accidents shall be notified to department __.

immediately

The owner or person in charge of material handling squirmy shall __ notify the commissioner of any accident.

immediately

Gas caps/plugs shall be in place unless gas is __.

in use

Operators of machines shall make machine __ before leaving machine.

inoperative

Parapet walls used for a support surface shall be __ by BPD.

inspected

Prior to installation all suspended scaffold support devices shall be __.

inspected.

Following adjustment or repair of scaffold an __ is required.

inspection

Upon completion of installation of personnel hoist an __ report verifying it has been installed in accordance with viewings will be provided.

inspection

Upon completion of installation of suspended scaffold an __ shall be performed.

inspection

Supported scaffolds require a pre shift __ & __.

inspection & checklist

Prior to each shift suspended scaffolds shall be inspected. The results shall be kept on a checklist that will be __.

kept on site.

The hoisting or lowering of any article outside of building shall be performed under direct supervision of __.

licensed rigger.

Areas used for gas storage shall be properly __.

lighted l.

While mobile scaffolds are in use casters and wheels shall be __.

locked

Vehicles with __ parts shall not be used.

loose

Pre shift scaffold checklist shall be based on __ requirements.

manufacturers

Trucks shall not be loaded past __ __ __.

manufacturers rated capacity

Walkways around conveyor belts shall be kept free of __.

materials

Sidewalks/walkways shall have __ at all blind corners.

mirrors

Guardrail required for ramp that abuts __.

motor vehicle traffic

Inspection by department is required for __ suspended scaffolds.

multi point

Continuing concrete work operations after alarm the SSM shall notate in his log the __.

names & employees & locations for completion of concrete and provide to FDNY who arrive at scene.

No fork lift shall be used when forks are higher than __.

necessary to clear obstructions.

Manufacturer load ratings shall be reduced to account for wind group, and operating speed when __.

necessary.

Air compressor standpipe may use __ or air dryer.

nitrogen

Sprinklers during demo shall be maintained as a __.

non automatic sprinkler system

Counter weights shall be made of __ material.

non flowable material.

If supervisor is unavailable the SSM shall notify any other supervisory personnel of the permit holder and __.

note all violations in log book.

At least 1 hoist is not in readiness for FDNY. Above 75'

notify DOB

Jumping/erection of tower crane plans must be filed with the certificate of __.

on site inspection.

FSM must conduct inspection minimum __daily.

once

Every excavation shall be provided at least __ safe means of egress.

one

Debri and material during demo shall be removed through __.

openings in floor chutes buckets hoists

No person other than the __ __ by employer shall operate power buggy.

operator assigned

All workers at a major building site shall receive __ & __.

orientation & training.

Alarm must activate for standpipe when it is over __ and under.

over 25psig under supervisory pressure.

C-hook scaffolds do not require __.

permit

No sidewalk shed shall be installed without a __.

permit.

The __ __ __ is responsible to maintain weather proofing of adjoining buildings.

person causing construction

When permission to enter adjoining property has been obtained a __ examination at such property shall be conducted by the person causing the work prior to commencement/reasonable periods during project.

physical

There must be a __ for the erection, jumping, climbing, and dismantling of tower or climber cranes.

plan

All entities shall agree to designate SSM as the __ SSM.

primary

When a sidewalk is to be located under scaffold or chute the shed shall be installed __ to the installation of equipment.

prior

Horizontal tiebacks are to be installed perpendicular. Single tie backs installed at an angle are __.

prohibited.

The use of repaired wire rope is __.

prohibited.

Compressed gas valves shall be

protected

Lifelines shall be independent of scaffold and __ from sharp edges.

protected

All demo operations shall be monitored by a __

qualified person

Form work shall be inspected by a __ person during and after placement of concrete.

qualified person

sprinklers __ paint shall be maintained.

red

During placement of structural member, the load shall not be __ from hoisting rope until it is secured.

released

Site Safety Manager to be present during demo from __ to __.

removal of glass to sidewalk shed removal

Open lights, flames, and sparks shall be kept at a __ distance while refueling.

safe

Container wheels shall be __ at end of each day.

secured by rope, cable, or chocking.

Precautions shall be taken to prevent clogging of __ or __.

sewer or drain.

All adjacent building water proofing is to be completed prior to demo __.

sign off.

Each safety log shall be __

signed

No person shall __ in the immediate vicinity of the refueling area.

smoke

Nylon slings only be used when __ have been applied to all sharp edges.

softening

Formwork shall be inspected prior to the placement of __.

steel

The engine shall be __ during refueling.

stopped

Oxygen and acetylene shall be stored in a __

storage cabinet

Class I and Class II liquids shall be __.

stored in approved containers.

Concrete washout containers shall be __ in size and protected from breach and overflow.

sufficient quantity

If the person causing soil work is not afforded license from adjoining property such duty to preserve and protect property shall rest on __.

the adjoining property owner.

Standpipe risers during demo shall be capped on floor immediately below __.

the demo floor.

If SSM discovers a violation they shall immediately notify__.

the person responsible for creating the violation.

Person causing excavations is required to preserve party walls at __.

their own expense

A __ schedule shall be provided as soon as the GC knows date and time of erection, jumping, or dismantling of tower crane.

time

Drawings for an excavation not required for excavations utilizing __.

trench box

Open fires are __.

unlawful

After an accident no person shall be permitted to __ or __ material handling equipment.

use or remove

Room used for oxygen storage shall be __ and have no combustable material or flammable gas.

ventilated

Indoor storage of compressed gases shall have __.

ventilation

Concrete formwork shall support all __ and __ loads.

vertical lateral

Provisions shall be made to control __ runoff and erosion.

water

The SSM shall at a minimum meet on a __ basis with the designated rep of each sub.

weekly

Manufacturers load ratings shall be reduced to account for wind, ground, and operating speed when __.

when necessary

Sidewalk shed parapet panel color

white background blue font.

Material and equipment shall not be stored on scaffold while __.

work is not performed.

CSFSM responsible for supervisors/issuing hot __.

work permits.


Set pelajaran terkait

Fall Fill-in-the-Blank Sentences

View Set

Chapter 13 Preterm and Postterm Newborns

View Set

Ch 1. LearningCurve: Numbers and Measurements

View Set

Unit 7: U.S. Treasury and Government Agency Securities

View Set

李彦宏(Robin Li) 百度(Baidu CEO)上市那天的故事

View Set

Chapter 1: Law and Legal Reasoning

View Set