[Video Lecture] In Dr. Miller's explanation of Product Families, he mentions that a sandwich shop like Quiznos or Subway probably has how many different Product Families?

3 - 5

[Video Lecture] A process cell has four workstations. Products must be processed by each workstation sequentially: Raw Material -- 1 -- 2 -- 3 -- 4 -- Finished Product. The first station completes one product every 5 minutes.-The second station completes one product every 2 minutes.- The third station completes one product every 3 minutes.- The fourth station completes one product every 4 minutes.

5 minutes

[Video Lecture] A manufacturing operation is open 11 hours each day. There are two 10 minute breaks and a 0.5 hour lunch planned where the manufacturing operation stops. What is the available time in minutes?

610 minutes per day

[Video Lecture] The takt time has been calculated to be 9 minutes per product. Management would like the Capacity Utilization to be 85%. What is the design takt?

7.65 minutes

[Video Lecture] The takt time has been calculated to be 6 minutes per product. The work cell is capable of producing at a pace of 4.8 minutes per product. The cell Capacity Utilization is:

80.00 %

[Video Lecture] The available time per day is 600 minutes. The organization would like to be capable of producing 4000 products each day. What is the takt time in seconds?

9 seconds per product

[Lean Six Sigma Memory Jogger] The combination of equipment, material, and people in close proximity to maximize flexibility, create flow, and minimize non-value-added activities is called:

Cellular Layout

[Video Lecture] The process layout that typically fosters poor communication between work groups is:

Functional Layout

[Lean Toolbox] The origin of the word "Takt" is:

German

Within the simulation you just saw, the person performing the simulation gives you one "secret" for why one piece flow is faster. One of the reasons is:

In batch production we pick up and set down items many times. in One Piece Flow, we never put the item down until it is done.

[Lean Six Sigma Memory Jogger] The three elements of Standard Work are: How long the operation should take (cycle time), the quantity of work in process that must be maintained (WIP), and the:

Order in which the operation should be completed.

[Lean Toolbox] The time to complete a container of parts (the takt time multiplied by the container quantity) is called:

Pitch

[Lean Toolbox] To establish activity timing, the Lean Toolbox recommends videoing

Several operators, during several shifts, multiple times

[Video Lecture] If the machine cycle time is greater than the design takt time, one way to get around this problem is:

add a second machine to the work cell

[Lean Toolbox] "Fake Flow" is created when:

batches are continued to be produced within a U-shaped cell

[Lean Toolbox] A "cardboard kaizen" is used to:

create a full scale mock-up of a production area so workers can act as if they are actually running the cell

[Video Lecture] The worker with 26 years of experience in the opening video has now been given the permission to:

fail and make mistakes

[Lean Thinking in the Office Article] The reason that many service organizations have had difficulty in applying lean principles is because they:

fail to implement flow and pull

[Lean Six Sigma Memory Jogger] Takt time attempts to align:

manufacturing rate to demand rate

[Lean Toolbox] To increase the production volume of a cell, one can add operators. When two or more operators "chase" one another around the cell, doing all the tasks at all the workstations, this is known as a:

rabbit chase

[Lean Toolbox] Counterintuitively, working to Takt Time may require:

slowing down

[Video Lecture] When Tom Root of Zingerman's asks the Deli Manager what she dreads about the weekend, the Deli Manager replies:

the pile of sandwiches

[Lean Toolbox] Eli Goldratt's TOC utilizes three performance measures for operations:

throughput, inventory, operating expense

[Video Lecture] The worker who drives a "trolley" or cart on a regular route around a manufacturing facility, picking up parts from a variety of work cells and delivering them to a shared resource and back again, we call a:

waterspider


Related study sets

The seven components of the speech communication process

View Set

Ch5 Health Insurance Policy Provisions, Riders and Exclusions

View Set

9. Privacy, Security, and Ethics

View Set

Insurance Law (Title 3 - Insurable Interest)

View Set

tax c239 ch 19 advanced tax questions 26-40

View Set

4 - PAP: Liability, Med Pay, and UM Coverage

View Set

series 66 Final exam incorrect answers

View Set

Stopping Distances and Reaction Time - Driver's Ed

View Set