What is NOT a step in developing a group technology layout?

Disposing of left-over machinery and outsourcing ungrouped processes

If there is a task in an assembly line which takes 30, but the cycle time of the assembly line has to be 20 seconds, then which of the following is the most appropriate thing to do? (A) Split the task (B) Use parallel work stations (C) Redesign (D) A and B only (E) A, B and C

(E) A, B and C

Six tasks are needed to process a certain product. The following table provides the information about the tasks. What is the shortest cycle time that will permit using exact two workstations (need to assign these six tasks into two workstations)? Task, Task Time (in minutes), Predecessors A 5 None B 4 None C 3 A,B D 4 B E 2 C F 4 D,E

11 min

Which of the following terms was introduced to refer to the physical surroundings where a service takes place: Landscape Distribution cell Line of sight Equipment cell None of the above

None of the above

When balancing an assembly line, which is NOT a way to reduce the longest task time below the required workstation cycle time?

Speed up the assembly line transfer mechanism

If the sum of the task times required to produce a product is 45 minutes and the cycle time for the same product is 10 minutes, the theoretical minimum number of the workstations is 5 using the assembly-line balancing procedure.

True

Which of the basic types of production layout formats is one which similar equipment or functions are grouped together?

Workcenter layout

Using the assembly-line balancing procedure, which of the following is the required cycle time if the production time in minutes per day is 1440 and the required output per day in units is 2000?

0.72

Using the assembly-line balancing procedure, which is the theoretical minimum number of workstations if the task times for the six tasks the make up the jobs are 4, 6, 7, 2, 6, and 5 minutes, and the cycle time is 10 minutes?

3

A job shop makes many different products in batches, each batch or job requiring the same set or sequence of processing steps.

False

In balancing an assembly line, workstation cycle time has to be less than the time between successive units coming off the end of the line.

False

The percentage of the idle time in an assembly line is called cycle time.

False

You have just determined the actual number of workstations that will be used on an assembly line to be 8 using the assembly-line balancing procedure. The cycle time of the line is 10 minutes and the sum of all the tasks required on the line is 60 minutes. Which is the correct value for the resulting line's efficiency?

0.750

You have just determined the actual number of workstations that will be used on an assembly line to be 6 using the assembly-line balancing procedure. The cycle time of the line is 5 minutes and the sum of all the tasks required on the line is 25 minutes. Which is the correct value of the resulting line's efficiency?

0.833

In the design of the retail service layouts, the term "ambient conditions" could refer to:

Temperature


Related study sets

Assessment and Management of Patients With Endocrine Disorders (PrepU)

View Set

Karch Pharmacology Ch. 6 - Challenges to Effective Drug Therapy

View Set

Real Estate Course 1 Exam Prep Part 2

View Set

brain pop newtons laws of motion

View Set

Chapter 36 - EMT (Transport Operations)

View Set

Missed Question Biology - U World

View Set

Rosh Review Boost Exam: Pediatrics

View Set