Introduction to Construction Management Module 1 Quiz
The two types of the Construction Management delivery method are:
Agency CM and at-risk CM
Commercial construction includes? Banks, schools, hotels, shopping malls, government buildings, all of the above
All of the above
Responsibility of the quality control officer is to make sure the quality requirements of the contract documents are being met by checking: Dimensions, Tolerances, Testing, All of the above
All of the above
Some of the construction management functions typically performed by a team of construction managers are: Administering the Contract. Managing Construction Operations. Monitoring Performance. Assessing Risks. All of the above
All of the above
The primary materials used in commercial construction include: Steel, concrete, glass, marble, granite, acoustic ceilings, all of the above
All of the above
What sums up the role of a field engineer? Works directly for the superintendent. Responsible for project layout and dimensional accuracy. Responsible for communication with subcontractors. All of the Above
All of the above
What sums up the role of the Quantity Surveyor? Works with the senior estimator. Must have a good understanding of the construction process. Must be able to read plans. All of the above.
All of the above
Which of the following is a field position?
Area superintendent & Project Superintendent
Many construction companies will rotate their new hires through a number of tracks. The entry level position in the superintendent track is:
Field Engineer
All of the following are functions of Construction Management except:
Financing the project
A ______ building is one that seeks to reduce or eliminate negative impacts on the natural and human environmental.
Green
Which of the following is terminology used regarding the onsite work done by the contractor?
Managing construction operations
Who determines what method of delivery is used on a project?
Owner
By whom was the first form of concrete used?
Romans
The parameters defining the overall extent of work to be included in a construction contract are:
Scope of work
Construction work that is not subcontracted and is performed with the general contractor's own forces or labor is:
Self-performed work
The written instructions from an architect or engineer accompanying the project plans pertaining to the quality of materials and workmanship required for the project is:
Specifications
The bid, or contract amount, is what the contractor is willing to do the work for, and it includes:
The cost, plus overhead items, and profit
What is the best description of design/build construction?
The owner contracts with a one entity, which is responsible for the designing and building
A process in which various alternative approaches are evaluated and considered regarding design, product selection, or building system in an effort to provide the most efficient, cost-effective solution is:
Value engineering