LS status codes

Ace your homework & exams now with Quizwiz!

PF

DELAYED SHIPMENT; ITEM UNDERGOING FIRST ARTICLE TESTING WITH THE VENDOR

DT

FREE ISSUES DENIED

BB

ITEM BACK ORDERED AGAINST A DUE IN TO STOCK

N4

ITEM BEING MANUFACTURED BY A LOCAL NAVY SOURCE

BA

ITEM BEING PROCESSES FOR RELEASE AND SHIPMENT

BV

ITEM PROCURED AND ON CONTRACT FOR DIRECT SHIPMENT TO COSIGNEE

BJ

Quantity changed

D3

REJECTED. ACTIVITY DID NOT RESPOND TO SOURCE OF SUPPLY REQUEST FOR ADDITIONAL INFORMATION

CA

REJECTED. INITIAL PROVISION OF THIS STATUS WILL BE BY NARRATIVE MESSAGE

CJ

REJECTED. ITEM CODED )OR BEING CODED) "OBSOLETE" OR "INACTIVATED"

RB

REJECTED. ITEM IS FLEET CONTROLLED.

CM

REJECTED. ITEM IS NOT OR IS NO LONGER FREE ISSUE.

RD

REJECTED. NOT SUPPORTED AT YOUR ACTICITY. RECORDS REFLECT PREVIOUS INSTALLATION OF KIT.

N9

REJECTED. QUANTITY REQUISITIONED EXCEEDS THE MAXIMUM ISSUE QUANTITY IMPOSED BY THE PUBLICATION

CP

REJECTED. SOURCE OF SUPPLY IS LOCAL MANUFACTURE, FABRICATION, OR LOCAL PROCUREMENT.

CG

REJECTED. UNABLE TO IDENTIFY REQUESTED ITEM

CX

REJECTED. UNABLE TO IDENTIFY THE BILL TO AND/OR SHIP TO ADDRESS AS DESIGNATED BY THE SIGNAL CODE OR THE SIGNAL CODE IS INVALID.

CD

REJECTED. UNABLE TO PROCESS BECAUSEOF ERRORS IN THE QUANTITY, DATE, AND/OR SERIAL NUMBER FIELDS OR INCONSISTENCY IN DATA CONTENT.

PC

REJECTED. UNABLE TO PROCESS REQUISITION BECAUSE THE PURCHASE/CREDIT CARD EXCEEDED ITS LIMIT

CK

REJECTED. UNABLE TO PROCURE. NO SUBSTITUTE/INTERCHANGEABLE ITEM IS AVAILABLE

C8

REJECTED. VENDOR WILL NOT ACCEPT ORDER FOR QUANTITY LESS THAN THE QUANTITY INDICATED IN CC 76-80

BD

REQUISITION IS DELAYED DUE TO NEED TO VERIFY REQUIREMENTS RELATIVE TO AUTHORIZED APPLICATION, ITEM IDENTIFICATION, OR TECHNICAL DATA

NN

REQUSITION PARTIALLY FILLED. QUANTITY INDICATED HAS BEEN CANCELED. IF STILL REQUIRED, SUBMIT NEW REQUISITION.

NK

REQUSITION PARTIALLY FILLED. QUANTITY INDICATED HAS BEEN REFERRED TO ACTIVITY INDICATED IN RP 67-69

BK

Requisition data elements have been modified as requested

BZ

Requisition is being processed for direct delivery procurement

DG

SHIPMENT CONFIRMED. THE QUANTITY IN THE DIC AS3 TRANSACTION WAS THE QUANTITY SHIPPED

NB

SUSPENDED. PUBLICATION/FORM BEING REVISED/REPRINTED

B3

THE REQUIRED AVAILABIILITY DATE (RAD) CONTAINED IN THE ORIGIONAL REQUISITION IS UNREALISTIC. THE DATE IN RP 70-73 IS THE DATE WHEN THE MATERIAL WILL BE AVAILABLE

B7

UNIT PRICE CHANGE

BM

YOUR DOCUMENT FORWARDED TO ACTICITY INDICATED IN CC 67-69

N1

APPLICABLE TO 7R COG. ADVICE CODE 5D REQUISTIONS. FUNDS ARE CURRENTLY NOT AVAILABLE. REQUISITION HAS BEEN BACKORDERED WITH FINANCIAL STATUS INITIATED.

BQ

CANCELED-RESULTS FROM RECEIPT OF CANCELLATION REQUEST FROM REQUISITIONER. BILLING FOR MATERIAL OR CONTRACT TERMINATION CHARGES WILL BE MADE.

DE

CANCELED. ALTHOUGH SHIPMENT STATUS (DIC AS3) WAS SENT, NO SHIPMENT WAS MADE.

B4

CANCELED. SAME AS BQ BUT DO NOT DEOBLIGATE FUNDS

BR

CANCELLED. REQUISITIONING ACTIVITY AUTHORIZED CANCELLATION IN RESPONSE TO MATERIAL OBLIGATION VALIDATION (MOV) REQUEST FURNISHED BY PROCESSING POINT

BS

CANCELLED. REQUISITIONING ACTIVITY FAILED TO RESPOND TO MOV REQUEST

N3

MODIFIER DOCUMENT RECEIVED UPGRADING PRIORITY RO 01-08 AND MATERIAL NOT AVAILABLE TO FILL REQUIREMENT

BF

NO RECORD OF YOUR DOCUMENT

BG

ONE OR MORE LISTED FIELDS HAVE BEEN CHANGED


Related study sets

Spanish 1 Unit 2/ 8.2 Grammar: Friends & Family

View Set

Introduction to Careers in Finance D9126 : 3. PRINCIPLES OF CORPORATE FINANCE

View Set

Industrialization/Industrial Revolution(*)

View Set

Chapter 22: Transoceanic Encounters and Global Connections Guided Reading

View Set

Management Exam 3 Quizlets Combined

View Set

Supply and Demand Homework Ch (04)

View Set

Aging and the Elderly- Sociology Ch.13

View Set