oper 3100 - chapter 8

Ace your homework & exams now with Quizwiz!

When balancing an assembly line, which of the following is not a way to reduce the longest task time below the required workstation cycle time?

speed up the assembly line transfer mechanism

If there is a task in an assembly line which takes 30, but the cycle time of the assembly line has to be 20 seconds, then which of the following is the most appropriate thing to do?

A,B, and C

In the design of retail service layouts, the term "ambient conditions" could refer to which of the following?

Temperature

Which of the following is NOT a step in developing a group technology layout?

disposing of left over machinery and outsourcing ungrouped processes

A job shop makes many different products in batches, each batch or job requiring the same set or sequence of processing steps.

false

In balancing an assembly line, workstation cycle time has to be less than the time between successive units coming off the end of the line.

false

The percentage of idle time in an assembly line is called cycle time.

false

Which of the following terms was introduced to refer to the physical surroundings where a service takes place:

none of the above !!!!!!! equipment cell distribution cell landscape line of sight

If the sum of the task times required to produce a product is 45 minutes and the cycle time for the same product is 10 minutes, the theoretical minimum number of workstations is 5 using the assembly-line balancing procedure.

true

Which of the following basic types of production layout formats is one which similar equipment or functions are grouped together?

workcenter layout

Using the assembly-line balancing procedure, which of the following is the required cycle time if the production time in minutes per day is 1440 and the required output per day in units is 2000?

.72

You have just determined the actual number of workstations that will be used on an assembly line to be 8 using the assembly-line balancing procedure. The cycle time of the line is 10 minutes and the sum of all the tasks required on the line is 60 minutes. Which of the following is the correct value for the resulting line's efficiency?

.75

You have just determined the actual number of workstations that will be used on an assembly line to be 6 using the assembly-line balancing procedure. The cycle time of the line is 5 minutes and the sum of all that tasks required on the line is 25 minutes. Which of the following is the correct value for the resulting line's efficiency?

.8333

Using the assembly-line balancing procedure, which of the following is the theoretical minimum number of workstations if the task times for the six tasks that make up the job are 4, 6, 7, 2, 6, and 5 minutes, and the cycle time is 10 minutes?

3


Related study sets

Lección 2 Estructura 2.4 Numbers 31 and higher

View Set

CSET Subtest 1: Reading, Language, and Literature

View Set

Chapter 40: Fluid, Electrolyte, and Acid-Base Balance

View Set

OB GYN CTL 2nd/3rd Trimester Pathology P2

View Set

SAT 2 Cell Division- Mitosis and Meiosis

View Set