BUA 100 Ch. 7 Quiz
On a PERT chart, an arrow from "Activity D" to "Activity E" indicates that _______.
Activity D must be completed before Activity E can start
The term operations (or production) refers to all of the activities involved in producing _______.
Both goods and services
In a PERT chart, the _______ path is the most time-consuming set of tasks in a project.
Critical
A company that manufactures locomotives is likely to use which layout in its manufacturing process?
Fixed position layout
Several years ago, Burger King's jingle was, "Hold the pickles, hold the lettuce, special orders won't upset us, all we ask is that you let us serve it your way." This would suggest that Burger King sought to gain competitive advantage based upon which of the following?
Flexibility
Production creates _______ utility.
Form
A seamstress combines lace, satin, tulle, and pearl trim to create a one-of-a-kind bridal gown for a customer. Which form of utility is the seamstress providing to the customer?
Form utility
Alexa is a project manager at an engineering firm. In her office she posts a bar graph for each of her projects that shows which activities are needed to complete the project and how long each activity is expected to take. She regularly consults this timeline to determine if the project is on schedule. What scheduling tool does Alexa use?
Gantt chart
Which of the following is an example of a low-contact system?
Having your lawn cut by the neighbor's son
Which of the following is a set of international standards for quality management and quality assurance?
ISO 9000
Which of the following is intended to minimize inventory costs, reduce storage requirements, and create a fast and efficient response to customer orders by bringing together all needed materials to produce a product at the precise time they are needed in the production stage?
JIT
The arrangement of machinery, equipment, and supplies to effectively produce goods and services is the focus of which aspect of operations planning?
Layout planning
When deciding where to build a new factory, senior managers of Absco Products considered factors such as transportation, the availability of a trained labor force, tax incentives, and the government regulations in the area. This process BEST describes which aspect of operations planning?
Location planning
If a company's business strategy is to gain competitive advantage through price, which of the following operational capabilities should they choose?
Low cost
At a garment manufacturer, all cutting machines are grouped together in one area, whereas sewing machines are grouped together in another area, and pressing machines are arranged in still another area. What type of layout does this suggest?
Process layout
At a bakery, baked goods boxes travel past individual work stations on a conveyor, and workers at each station perform a small task, such as placing baked goods in the box, placing the cover on the box, affixing stickers to the box, or shrink-wrapping the box in plastic. This BEST describes a_______ layout.
Product
Which type of layout is MOST appropriate for a company that wants to mass-produce high volume, make-to-stock products?
Product layout
The majority of private sector employment in the U.S. economy is in the _______ sector.
Services
Which materials management function likely would be responsible for identifying, evaluating, and choosing potential vendors of materials and services and negotiating terms of service?
Supplier selection
When a local Walmart is open 7 days a week, 24 hours a day, which form of utility is it providing to customers?
Time utility
Which of the following would be considered a high-contact service?
You get a manicure and pedicure before an important event.
You go to a hair salon for a haircut and end up buying a tube of styling gel as you're checking out. The haircut is a(n) _______, whereas the styling gel would be considered a(n) _______.
intangible service; tangible product
Although the most popular time for getting kids' hair cut is after school or on the weekend, a hair stylist cannot produce haircuts ahead of time and store them for those high-demand time periods. This is an example of the service's _______.
unstorability
Hamilton Construction is contracted by the county to build a bridge over a set of railroad tracks. Which of the following would BEST describe this operations process?
Make-to-order operations
Traditionally, raw materials and component parts were delivered to producers well in advance of the manufacturing process and stored until needed. With _______, these raw materials and component parts are now delivered to the producer exactly when they are needed.
just-in-time (JIT) production