Chapter 5,6,8 Mobius questions
Which Statistical Tool of Six Sigma is used to determine the frequency of specific problems? Flow Diagram Pareto Chart Cause and Effect Diagrams Check Sheet
Check Sheet
Benefits derived from implementing an e-procurement system include all of the following EXCEPT: Time Savings Real Time Access Trackability Decentralizing Purchasing
Decentralized Purchasing
The best supplier candidates for Supplier Relationship Management (SRM) include all of the following EXCEPT? Preferred Suppliers Developmental suppliers that need to make improvements Suppliers that provide lesser quantities of a crucial products/services Suppliers that provide high volumes of products or services
Developmental suppliers that need to make improvements
A strong supplier partnership requires that both buyer and supplier adopt a strong tactical perspective
False
Award-winning suppliers serve as role models for other suppliers and may, therefore, be exempt from audits and certification programs
False
LEAN production is an operating philosophy or mindset that attempts to minimize the impact of supply variability and flaws in forecasting through the use of safety stock inventories.
False
The Profit-Leverage Effect states that a decrease in purchasing expenditures will directly decrease profit
False
ISO 14000 is a widely accepted management and quality certification standard
false
Duties, taxes, or customs imposed by the host country for imported or exported goods, are known as Tariffs
true
An effective supplier certification program may increase the time spent on incoming inspections
False
What is the term that is often used for the acquisition of services? Purchasing Contracting Requisitioning Ordering
contracting
A purchase order is legally binding once issued by the buyer
false
Which of the following is NOT one of the primary goals of Purchasing? Ensure the uninterrupted flow of materials and services at the lowest total cost Improve the quality of the finished goods produced Increase the supplier base Optimize customer satisfaction.
Increase supplier base
Benefits of implementing an effective supplier certification program include all of the following EXCEPT?
Increasing the supplier base
The keys to developing successful supply partnerships include all of the following EXCEPT?
Individualized Objectives
Successful supplier relationships involve equal decision-making control between both the buyer and the supplier.
True
Which one of the following is NOT a quality tool of Six Sigma? Flow Diagrams Check Sheets Hysterical Charts Cause & Effect Diagrams
Hysterical charts
LEAN manufacturing emphasizes all of the following EXCEPT? Continuous improvement Large batch sizes Reduction of waste Synchronization of material flows
Large Batch Sizes
What company originated the concept of Six Sigma? Ford Motorola Toyota IBM
Motorola
All of the following are included in the eight wastes EXCEPT? Overproducing Extra-Processing Overspending Waiting
Overspending
Which quality expert is credited with the concept that 'quality is free; defects are costly' W. Edwards Demming Joseph Juran Philip Crosby Shigeo Shingo
Philip Crosby
The process commonly utilized in continuous improvement is known as? Specific, Measurable, Achievable, Relevant, Time-Oriented (S.M.A.R.T.) Plan, Source, Make, Deliver Ready, Aim, Fire Plan, Do, Check, Act
Plan, Do, Check, Act
Which of the following is NOT one of the "Seven Tools of Quality Control" Scatter Diagrams Histograms Small Batch Scheduling Control Charts
Small batch scheduling
An organization's process for evaluating the quality systems of key suppliers in an effort to eliminate incoming inspections can be referred to as? Quality Systems Certification Supply Management Supplier Certification Supplier Inspection
Supplier Certification
Which of the following would be a good reason to outsource (buy) versus make an item? A firm lacks the technology or expertise to produce an item To utilize existing capacity within a company's own firm To have more direct control over the design and production of an end item No competent supplier presently produces the needed item
The firm lacks the technology or expertise to produce an item
The sum of all costs associated with every activity in the supply stream of a product, is referred to as? Total Cost of Acquisition Total Cost of Ownership Purchase Requisition Cost Total Procurement Cost
Total cost of ownership
The primary design objective of a LEAN layout is to reduce wasted movements of workers and/or materials.
True
Which one of the following is among the most important elements of the LEAN manufacturing philosophy? Quality inspections and a standardized product line Fully automated assembly lines and a large supplier base Large inventories and large batch sizes Waste reduction and continuous improvement
Waste reduction and continuous improvement
The purchasing function is one of the most value-enhancing functions in any organization, and therefore, it is not necessary to periodically monitor the purchasing function's performance against a set of standards or industry benchmarks
false
Outsourcing allows a firm to concentrate on core capabilities and reduce staffing levels
true