Envision Practice quizzes

¡Supera tus tareas y exámenes ahora con Quizwiz!

If the issue of minimizing light pollution is deemed to be Not Applicable to a project, how many points are removed from the denominator used to score the project? A) 12 B) 20 C) 0 D) 6

A) 12

The Mobility subcategory falls within which Envision credit category? A) Leadership B) Resource Allocation C) Natural World D) Quality of Life

D) Quality of Life

How might a project earn a Conserving level of achievement for CR1.2 Reduce Greenhouse Gas Emissions? A) reduce operational GHG emissions by 10% B) reduce operational GHG emissions by 25% C) reduce operational GHG emissions by 50% D) reduce operational GHG emissions by 100%

D) reduce operational GHG emissions by 100%

A project has completed a traffic impact study and coordinated with nearby owners on a management plan to maintain public access during construction. What level of achievement would the project reach for QL1.6 Minimize Construction Impacts? A) None B) Improved C) Enhanced D) Superior

B) Improved

In QL1.1 Improve Community Quality of Life, what is the key criteria that distinguishes a Conserving level of achievement from a superior? A) Rehabilitating infrastructure assets B) Identifying and addressing potential adverse impacts to the host and affected communities C) Satisfaction of affected communities demonstrated by broad community endorsement of the project D) Taking into account community needs, goals, and issues

C) Satisfaction of affected communities demonstrated by broad community endorsement of the project

A water distribution line is being rehabilitated. The project team identifies priority areas for repair by conducting a one-time water loss audit that accounts for 60% of the project's water use. What level of achievement might they earn for RA3.4 Monitor Water Systems? *A) Improved B) Enhanced C) Superior D) Conserving

*A) Improved

What paradigm describes how organizations might continuously improve resilience capabilities? *A) avoid, eliminate, minimize, compensate B) plan, do, check, act C) reduce, recycle, reuse D) include, integrate, re-evaluate

*A) avoid, eliminate, minimize, compensate

What documentation BEST supports achievement of RA1.5 Balance Earthwork On Site? *A) cut and fill diagrams with calculations showing 100% of excavated materials remaining on site B) Haul logs and receipts from the contractor hired to complete the excavation C) cut and fill diagrams showing no earthwork is removed from the site and no earthwork is imported D) none of the above

*A) cut and fill diagrams with calculations showing 100% of excavated materials remaining on site

What is the goal of long-term maintenance and monitoring? *A) maintain design performance throughout the design life of the project and prevent "backsliding" B) prevent mechanical failures and to reduce ecological protection and mitigation C) ensure the comfort of the facility occupants D) prevent "backsliding" and enforce "tried and true" approaches that have worked on other projects

*A) maintain design performance throughout the design life of the project and prevent "backsliding"

How would a project team demonstrate that QL1.5 Minimize Light Pollution is Not Applicable? *A) provide plans showing the project has no exterior lighting B) provide the city ordinance that shows requiring lighting that is incompatible with the credit C) Demonstrate that the community is highly vulnerable to crime and, therefore, good lighting is a necessity D) None of the above

*A) provide plans showing the project has no exterior lighting

Which is NOT a core principle of a resilient system? *A) reflective B) resourceful C) robust D) reduced

*A) reflective

A project team is designing a new intelligent transportation signaling station. The owner requested a manual for general operations and maintenance. However, the owner does not have a long-term monitoring and maintenance plan and specific personnel and resources for implementation of the plan have not been identified. Which level of achievement might they pursue for LD2.3 Plan for Long-Term Monitoring and Maintenance? A) Improved *B) Enhanced C) Superior D) None

*B) Enhanced

Owners of a major new commercial infrastructure project have publicly announced through a news release that they will be building the facility utilizing "green" principles. This is the first time the owners have used sustainability principles to locate, design, and construct a project. Specific commitments for sustainable design of the project have been established based on a chartering session with the project team. What level of achievement might be earned for LD1.1 Provide Effective Leadership and Collaboration? A) Improved *B) Enhanced C) Superior D) Conserving

*B) Enhanced

A project team notes that the rehabilitation of an outdated water treatment facility will require at least 100 full-time employees for the year-long construction phase. The team has asked the general contractor to commit to hiring at least half of the labor force from the local community. What level of achievement might be earned for LD3.1 Stimulate Economic Prosperity and Development? A) None *B) Improved C) Enhanced D) Superior

*B) Improved

In infrastructure landscaping, the best approach for reducing pesticide, herbicide and fertilizer impacts on the environment is to: A) Use only pesticides, herbicides and fertilizers that have low toxicity, persistence and bioavailability *B) Use native plant species that require no pesticides, herbicides or fertilizers C) Institute strict application management controls to minimize over application D) Institute a combination of strict application management controls along with effective runoff controls

*B) Use native plant species that require no pesticides, herbicides or fertilizers

A consultant is hired due to their strong reputation in sustainable approaches to infrastructure. They regularly report their corporate sustainability achievements via the Global Reporting Initiative. The project owner and other key members of the project team also have clear commitments, a sustainable project portfolio, and corporate sustainability officers. Which level of achievement might they pursue for LD1.1 Provide Effective Leadership and Collaboration? A) superior *B) conserving C) restorative D) innovation

*B) conserving

What documentation is needed for a project to earn an Enhanced level of achievement for QL3.3 Enhance Views and Local Character? A) Guidelines that include an inventory of all natural landscapes or man-made features to be protected *B) documentation that shows design features were approved and preserve local character C) reports identifying important elements of the site's character D) a certified letter from a national registry confirming the area's historical sites

*B) documentation that shows design features were approved and preserve local character

Which of the following statements is UNTRUE about the performance improvement section within Envision credits? A) provides informal guidance and context to aid the evaluation of the credit *B) lists the only requirements to be met when assessing a project C) provides guidance on ways to incrementally improve performance D) demonstrates project performance is cumulative

*B) lists the only requirements to be met when assessing a project

As part of a new transportation project, the city has created a program where bus riders earn coupons for local restaurants for each bus pass purchased. How many points might the project earn for QL2.2 Encourage Sustainable Transportation? A) 5 B) 8 *C) 12 D) 16

*C) 12

For CR1.1 Reduce Net Embodied Carbon, a Superior level of achievement might be earned if a project team can demonstrate what percentage of reduction in total embodied carbon of materials over the life of the project? A) 5% B) 15% *C) 30% D) 50%

*C) 30%

What is the value of commissioning project energy systems? A) achievement of RA2.4 Commission and Monitor Energy Systems B) Collecting data for industry improvement *C) Ensuring systems are functioning as intended D) Rehabilitating older HVAC systems

*C) Ensuring systems are functioning as intended

Projects located on brownfield sites that have been remediated by others will achieve: A) Restorative for NW1.4 B) Restorative for NW2.1 *C) Improved for NW2.1 D) A and C

*C) Improved for NW2.1

How might a project earn a Restorative level of achievement for NW3.3 Maintain Floodplain Functions? A) do not construct within a floodplain and do not impact nearby floodplains B) retain the net vegetated area on the project site within the floodplain *C) Return previously developed impervious surfaces to a natural vegetated state D) intentionally choose the site to avoid floodplain development

*C) Return previously developed impervious surfaces to a natural vegetated state

A project team has consulted a certified soil scientist to help them develop a soil protection plan for a project site. What level of achievement might the project reach for NW3.5 Protect Soil Health? A) Improved B) Enhanced *C) Superior D) Conserving

*C) Superior

For CR1.3 Reduce Air Pollutant Emissions, a Superior level of achievement would require what documentation? A) A list of strategies implemented to reduce air pollutant emissions during operations B) design documents that illustrate the processes in place to identify and address changes in air pollutant emissions *C) Technical report showing removal of all previously existing air pollutant sources D) a study showing that air pollution controls are within the 95th percentile

*C) Technical report showing removal of all previously existing air pollutant sources

A contractor implements construction safety measures above and beyond what is typically required by local regulations. Under which of the following credit sub-categories could points be achieved for this effort? A) economy B) collaboration *C) wellbeing D) community

*C) wellbeing

What documentation supports a Superior level of achievement for QL2.1 Improve Community Mobility and Access? A) Reports demonstrating the use of complete streets policies B) Meeting minutes with quotes from city officials attesting to the need for new inter-city connections C) Design components showing road expansion in anticipation of increased traffic volumes *D) Both A and B

*D) Both A and B

Assuming all appropriate documentation is provided, what is the highest level of achievement a project team may pursue for RA2.4 Commission and Monitor Energy Systems if they have hired an independent third-party commissioning agent? A) Improved B) Enhanced C) Superior *D) Conserving

*D) Conserving

What is NOT a reason of concern for light pollution? A) Disrupts sleeping patterns of vulnerable populations (children and the elderly) B) It is a waste of energy when exterior light is directed upward C) Disrupts circadian rhythms of office workers *D) It decreases community's vulnerability to crime due to increased security

*D) It decreases community's vulnerability to crime due to increased security

Documentation of a social impact assessment would NOT meet the requirements for which credit? A) QL1.1 B) QL1.2 C) QL3.1 *D) QL2.3

*D) QL2.3

What documentation would support a Conserving level of achievement for NW3.3 Maintain Floodplain Functions? A) calculations showing the percentage of vegetated areas after development B) site maps indicating the location of structures within floodplains before development C) documentation that the project was intentionally sited to avoid floodplains *D) all of the above

*D) all of the above

What award level would a project earn if 36% of the applicable points were achieved? A) verified B) gold C) platinum *D) silver

*D) silver

For QL3.4 Enhance Public Space and Amenities, which of the following is NOT appropriate documentation for demonstrating the project enhances public space? A) Promotional material showing biking, children playing, and statements that the new project "Will be great!" B) Minutes from community meetings identifying public needs and documents showing these items included in the scope of work C) Drawing of the proposed site plan with callouts for improvement features D) Photographs of the existing site and drawings identifying new areas of public space created

A) Promotional material showing biking, children playing, and statements that the new project "Will be great!"

For LD2.1 which statement best describes what a Sustainability Management Plan is? A) a set of policies, goals and objectives that allows projects to implement programs, review performance against a plan, and take corrective actions B) setting roles and responsibilities for documenting achievement in envision and receiving credit through the rating system C) a training course for high-level corporate management to understand what sustainability is D) a framework for managing how you message sustainability to the public to ensure they are impressed with your work

A) a set of policies, goals and objectives that allows projects to implement programs, review performance against a plan, and take corrective actions

A project owner brought an interdisciplinary project team together early for chartering sessions, followed by charrettes throughout the design phase to consider how a collaborative approach could improve the sustainability performance of the project. What level of achievement would these actions contribute toward in LD1.2 Foster Collaboration and Teamwork? A) Conserving B) Enhanced C) Superior D) Improved

C) Superior

Which of the following will NOT support achievement for LD3.1 Stimulate Economic Prosperity and Development? A) Community assessments confirming project benefits to local business B) Evidence of increased property values as a result of the project C) The number and type of new jobs created during operations D) The completion date coincides with a majority community event

D) The completion date coincides with a majority community event

Below are the four assessment criteria for LD1.3 Provide for Stakeholder Involvement. Which criterion is found in the superior level that is not required for improved or enhanced? A) establishing stakeholder participation and communication programs B) the scope and extent of identifying key stakeholders and concerns C) the extent of understanding stakeholder needs D) the extent of incorporating stakeholder input into project decisions

D) the extent of incorporating stakeholder input into project decisions


Conjuntos de estudio relacionados

HRM Chap 12 Creating a Healthy Work Environment

View Set

Database Management Quiz Lesson 3

View Set

CMS1 Assignment 2: Equal Employment Opportunity

View Set

All the f****n questions you missed on the practice exams

View Set

Wk 6: Ch. 4 Ethics and Social Responsibility

View Set

Residential Market Analysis and Highest and Best Use

View Set

Biology, Study Guide 8, DNA and RNA

View Set

Bioscience Week 1 The Healthy Body

View Set