EX 2
Students arrive at the student affairs office at an average of one every 15 minutes and their requests
1.33
Assumer a fixed cost for a process of 15,000. The variable cost to produce each unit of product is $10
$1,000
Assume the service rate for a q in a truck loading
0.5
You have just determined actual number of workstations that will be used on assebly
0.833
Using CPM what is the lattest finish time for the least activity in the project
12 days
Average does a student spend waiting in line
20 minutes
Using the assembly line balancing procedure 4,6, 7, 2,6, 5 cycle time is 10 minutes
3
Students arrive at the student affairs office at an average of one every 15 minutes
66.67
Using the assembly line balancing procedure, which of the following is required cycle time of the production time
9.6
A project starts out as which of the following
A statement of work
Simple project listing
ABDE
Which of the following basic types of process structures is one which equipment or work processes are arranged according to the progressive steps
Assembly line
Using the CPM which activities haveslack
C
The long term relationship between the inventory, throughout, and flow time of a production system
Little's Law
In the service system design matrix, face-to-face total customization service encounter is expectd so
Low production efficiency
Which of the following is not a suggestion for managing quoums
Periodically close the service channel to temporarily disperse the line
Which of the following is not a basic type of process structure
Product-Process
You have been placed in charge of a large project. SHortened communication lines are required
Pure Project
When balancing an assembly line, which of the following is not a way to reduce the longest track time below
Speed up the assembly line transfer mechanism
Which of following are not examples of poka-yokes described in the text
Tear-out cards in magazines
For an activity in a cpm analysis the early finish time in 20 and the late finish time is 20
The activity is on the critical path
In a Gantt chart the horizontal axis is usually which of the following
Time
A service blueprint is not which of the following
a service encounter that conforms to specifications
Buying a ticket for a college football game
multi channel single phase
Getting an autograph from a famous person might involve standing in which type of queing the structure
single channel, single phase