A server needs to be added to a failover cluster, and a virtual switch needs to be created using Hyper-V Manager. The other server in the cluster has a preconfigured virtual switch named: PLCluster. What must be the name of the virtual switch that needs to be created?

PLCluster

After an incident has occurred resulting in data loss which of the following specifies the amount of acceptable data a company can lose?

Recovery Point Objective (RPO)

A__________ site contains all the relevant network equipment and data but needs to be configured in the event of a disaster.

Warm

Which of the following needs to be done to ensure a backup can be scheduled? [Choose all that apply]

1. Install the Windows Server Backup feature 2. Identify and configure storage solution for the backup

When configuring a server for a failover cluster, what needs to be validated before adding the server to the cluster? [Choose all that apply]

1. The hard drives are all similarly configured 2. The server has a network interface card configured the same as the other server in the cluster 3. The server has the same roles installed as other servers in the cluster


Conjuntos de estudio relacionados

Taylor's Scientific Management Theory

View Set

Chapter 14 Quiz - Business Communications

View Set

Business Management Unit Game Activity 2

View Set

BJU Chemistry 3rd Edition Chapter 5

View Set

5.0 Project Planning & Design (COPY)

View Set

The Natural Anticoagulants and the Fibrinolytic System

View Set

Chapter 14: Care of the Patient with a Neurologic Disorder

View Set

COMBO "GRADE 8 - HISTORY - THE CRUSADES & CAUSES OF CRUSADES

View Set