Maintenance (AR 750-1 and DA PAM 750-1)
Who is required to perform a PMCS?
Every operator who is assigned a piece of equipment
What are the 4 levels of maintenance?
1. Unit 2. Direct support (DS) 3. General support (GS) 4. Depot
How many days does a basic PLL sustain a unit?
15 days
What is a TM?
A technical manual, outlines the specific scope of repairs on equipment
What regulation covers the army materials maintenance policy?
AR 750-1
When is a PMCS required to be performed?
Before, during, and after the operation of a piece of equipment and also at weekly and monthly intervals
What DA PAM is the leaders unit maintenence handbook?
DA PAM 750-1
What DA PAM is the guide for motor pool operations?
DA PAM 750-35
What DA PAM covers the army maintenance management system (TAMMS)?
DA PAM 750-8
What forms are contained in the equipment record folder when the vehicle is dispatched?
DA form 2404 DA form 2408-14 SF 91 DD Form 518 DA form 5987
What does the acronym MAIT stand for?
Maintenance assistance and instruction team
What does PLL mean?
Prescribed load list
What does PMCS stand for?
Preventive maintenance checks and service
What is a DD Form 314?
Preventive maintenance schedule and record
What is a class 3 leak?
Seepage of fluid great enough to forms drops and drip during inspection
What is a class 2 leak?
Seepage of fluid great enough to from drops, but not great enough to cause the drops to fall during inspection
What is a class 1 leak?
Seepage of fluid not great enough to form drops
What does TAMMS stand for?
The army maintenance management system
What type of manual is used to perform operator level PMCS?
The operators manual (10 series)
What is the DA form 2407 used for?
The request support maintenance on a piece of equipment