Project Management CH 8 Completion

¡Supera tus tareas y exámenes ahora con Quizwiz!

_____ diagrams trace complaints about quality problems back to the responsible production operations

cause and effect

Complete the formula: sample size = 0.25 * ( _____ /acceptable error)2

certainty factor

In the DMAIC process, the letter "C" stands for _____.

control

The _____ means taking responsibility for failures or not meeting quality expectations

cost of nonconformance

_____ is a quality planning technique that helps identify which variables have the most influence on the overall outcome of a process

design of experiments

The term _____ means a product can be used as it was intended

fitness for use

_____ correct or prevent further quality problems based on quality control measurements

process adjustments

The purpose of _____ is to ensure that the project will satisfy the needs for which it was undertaken

project quality management

The International Organization for Standardization (ISO) defines _____ as "the totality of characteristics of an entity that bear on its ability to satisfy stated or implied needs."

quality

Performing _____ involves periodically evaluating overall project performance to ensure that the project will satisfy the relevant quality standards

quality assurance

A(n)_____ is a structured review of specific quality management activities that help identify lessons learned that could improve performance on current or future projects

quality audit

_____ are groups of non-supervisors and work leaders in a single company department who volunteer to conduct group studies on how to improve the effectiveness of work in their department

quality circles

Performing _____ involves monitoring specific project results to ensure that they comply with the relevant quality standards while identifying ways to improve overall quality

quality control

_____ is the ability of a product or service to perform as expected under normal conditions

reliability

Genichi Taguchi's _____ methods focus on eliminating defects by substituting scientific inquiry for trial-and-error methods

robust design

In a _____, the closer data points are to a diagonal line, the more closely the two variables are related

scatter diagram

_____ is a measure of quality control equal to 1 fault in 1 million opportunities

six 9's of quality

Watts S. Humphrey defines a(n) _____ as anything that must be changed before delivery of the program

software defect

_____ measures how much variation exists in a distribution of data

standard deviation

_____ involves choosing part of a population of interest for inspection

statistical sampling

_____ are the screens and reports the system generates

system outputs

The _____ represents the number of units handled correctly through the process steps

yield


Conjuntos de estudio relacionados

Division and Classification, ENC1101 Chapter 8, ENC1101 Chapter 13, ENC1101

View Set

3415 Wasting and Stunting Lecture

View Set