Project Management CH 8 Completion
_____ diagrams trace complaints about quality problems back to the responsible production operations
cause and effect
Complete the formula: sample size = 0.25 * ( _____ /acceptable error)2
certainty factor
In the DMAIC process, the letter "C" stands for _____.
control
The _____ means taking responsibility for failures or not meeting quality expectations
cost of nonconformance
_____ is a quality planning technique that helps identify which variables have the most influence on the overall outcome of a process
design of experiments
The term _____ means a product can be used as it was intended
fitness for use
_____ correct or prevent further quality problems based on quality control measurements
process adjustments
The purpose of _____ is to ensure that the project will satisfy the needs for which it was undertaken
project quality management
The International Organization for Standardization (ISO) defines _____ as "the totality of characteristics of an entity that bear on its ability to satisfy stated or implied needs."
quality
Performing _____ involves periodically evaluating overall project performance to ensure that the project will satisfy the relevant quality standards
quality assurance
A(n)_____ is a structured review of specific quality management activities that help identify lessons learned that could improve performance on current or future projects
quality audit
_____ are groups of non-supervisors and work leaders in a single company department who volunteer to conduct group studies on how to improve the effectiveness of work in their department
quality circles
Performing _____ involves monitoring specific project results to ensure that they comply with the relevant quality standards while identifying ways to improve overall quality
quality control
_____ is the ability of a product or service to perform as expected under normal conditions
reliability
Genichi Taguchi's _____ methods focus on eliminating defects by substituting scientific inquiry for trial-and-error methods
robust design
In a _____, the closer data points are to a diagonal line, the more closely the two variables are related
scatter diagram
_____ is a measure of quality control equal to 1 fault in 1 million opportunities
six 9's of quality
Watts S. Humphrey defines a(n) _____ as anything that must be changed before delivery of the program
software defect
_____ measures how much variation exists in a distribution of data
standard deviation
_____ involves choosing part of a population of interest for inspection
statistical sampling
_____ are the screens and reports the system generates
system outputs
The _____ represents the number of units handled correctly through the process steps
yield