Unit 9: Commissioning
Program Phase
Establishes the foundation for other phases. Determines SOW and the systems that will be commissioned.
Acceptance Phase
Functional performance testing is performed on integrated systems. Requirements established during design intent are completed and documented.
Construction Phase
Progress is monitored to ensure design intent is being followed.
Design Phase
Project documents are completed and reviewed to ensure compliance with design intent.
Commissioning (Cx)
The process of ensuring systems are designed, installed, functionally tested, and capable of being operated and maintained according to the owner's design intent and operational needs.