120 CDI
Hazardous Material Report Considered CAT 1 safety discrepancies. Must be submitted with 24 hours.
HMR
Tools Signed WUC Trans Action Taken Corrective Action
How do you validate a MAF prior to signing it off?
7 Beginning of shift Checking out tools Beginning of job Mid job End of job Checking tools in End of shift
How many times should you be checking tools?
PQDR or Y Code
If you have a defective part, what do you do?
TD's Serno Match Defects RFI Tag
When screening and receiving parts, what are you looking for?
Never
When will you ever CDI your own work?
NAMP Ch. 10
Where can i find NAMPSOP
Appendix E
Where can i find information on MAF documentation?
11 - O
Which trans code and action taken would you use for corrosion prevention?
11 - Z
Which trans code and action taken would you use for corrosion treatment?
Not involving removal of defective component / repair
11 - C
Non repairable components documented as failed parts. Repair or replacement.
12 - B
Removal of non-defective component
16 - P
Installation of non defective component
17 - Q
Remove and replace of defective repairable components
23 - R
Aircraft Confined Space Program Vibration Analysis Maintenance Department Safety SE Misuse and Abuse Name Compliance Auditing Technical Data Management NAMDRP
7 Programs QA Manages
Acceptance Inspection Deficiency Report. Will be submitted for all newly received, manufacture, or reworked aircraft.
AIDR
QA
As a CDI who do you work for?
Baseline Trouble Report. Will be submitted for baseline deficiencies that prevent the issuance of work orders for inspections, TD's or unscheduled maintenance against aircraft or tracked components.
BTR
Wrong Work Unit Code to CAGE or Part Number Relationship. Items with no WUC. Incorrect removal intervals for a life limited component. TD's received by the activity and not in the baseline. Incorrect inspection intervals for an aircraft or tracked component.
Baseline Deficiencies include
28 Days
When does corrosion and bare metal become a downing discrepancy?
Administrative
During a special or conditional inspection, what type of MAF would you cut?
Malfunction or failure of a component, which if not corrected, could result in death or injury to personnel, or damage to or loss of aircraft, equipment, or facilities. A design flaw that allows incorrect installation of parts resulting in possible system malfunction or failure. In-flight or group loss.
Examples Of HMR
When specific WUC can't be chosen
Generic WUC
Joint Deficiency Reporting System. Website used for submitting all NAMDRP DR's.
JDRA
QA Matrix School Tracker Hi Times Item's in cal PC's (CDI's, CDQ's, QAR's) Program Managers
Name some things you can find in the MMP
Product Quality Deficiency Report. Submitted for deficiencies in new or newly reworked material, products, and software. CAT 1 & CAT 2.
PQDR
Will be submitted for quality deficiencies with the potential to cause death, injury, or severe illness. Must be submitted within 24 hours.
PQDR CAT 1
Will be submitted for quality deficiencies that do not affect safety or impair combat efficiency. Must be submitted within 5 calendar days.
PQDR CAT 2
Non-safety related technical publication deficiencies that cause maintenance delays of less than 8 hours.
TDPR CAT 3
Non-safety related technical publication deficiencies that does not cause maintenance delays.
TDPR CAT 4
Technical Publication Deficiency Report. Submitted to correct deficiencies in technical publications. Include MRC, Checklist, WUC manuals, shop process cards, MIM, IETMs, weapons manual, weapons checklist, reliability cards, IPB, and TB. CAT 1, CAT2, CAT 3, & CAT 4.
TPDR
Will be submitted on safety related technical publication deficiencies that could result in death or injury to personnel, or damage to or loss of aircraft, equipment, or facilities.
TPDR CAT 1
Non-safety related technical publication deficiencies that cause maintenance delays of 8 hours or more.
TPDR CAT 2
Interim Rapid Action Change.
What are IRAC's?
Info left for the next worker if the job can't be completed
What are In-Process inspections?
Naval Aviation Maintenance Program Standard Operating Procedures Chapter 10
What are NAMSOP's? Where can i find them?
Technical Directive
What are TD's?
Screening IP Final
What are the inspection types?
CDI Designation
What does the 4790/12 state?
Establishing requirements for reporting material deficiencies, poor workmanship, and improper procedures in the technical pubs
What is NAMDRP for?
Structural Repair Card AZ's Logbook
What is a SRC? Where does it go?
Mission Essential Subsystem Matrix
What is the MESM
MRC-000-insp.rea.index
What is the MRC QAR Matrix?
MRC's / Pre ops Hazmat, Tools, Hour Requirements, Corrosion Prone Areas, Sequence Control
What is the PMIC? Where can i find it in?
Indicates where QA is annotated in pubs and classifies if a CDI or a CDQ of QA is required. MMP
What is the QA Matrix? Where can i find it?
FOM - Remove something to get somewhere Assist - Assist with help
What is the difference between a FOM and a assist MAF?
Conditional - caused by events such as a lightning strike or a freshwater Special - By hours such as a 25 hour, 50 hour, 100 hour, 182 Day, and a 56 Day
What is the difference between conditional and special inspection?
No Defect / if you didn't touch it
When can i use A 799?