Match the following: BIM Level 0 BIM Level 1 BIM Level 2 BIM Level 3
BIM Level 0 - CAD BIM Level 1 - 2D/3D BIM Level 2 - BIM BIM Level 3 - BLM
Match the following BIM levels with their respective tools: BIM Level 0 BIM Level 1 BIM Level 2 BIM Level 3
BIM Level 0 - Paper BIM Level 1 - File-based collaboration BIM Level 2 - Files & Libraries BIM Level 3 - Integrated Web Services BIM Hub
What is the full form of BPMN?
Business Process Modeling Notation
What does CDE stand for?
Common data environment
What does CSG stand for?
Constructive Solid Geometry
The format for BIM Level 0 is _____________.
Drawings, lines, arcs, texts, etc.
A 3D model is not the mathematical representation of any three-dimensional object.
False
A typical solid model is defined by points, solids, and surfaces.
False
Digital representations of building components that carry computable graphic and data attributes, as well as parametric rules do not allow for intelligent manipulation.
False
Direct modeling is flexible and has linear parameters.
False
Gateways cannot modify the process path based on a decision.
False
Parametric modeling allows for radical changes at any time.
False
Parametric objects can be defined and managed only at a certain number of relevant levels of a hierarchy.
False
The project team only needs to identify the predecessor of each process in order to define the dependency between each process.
False
To create a detailed process map, the team should non-hierarchically decompose the BIM Use into a set of processes.
False
Which of the following is a standard for BIM level 3?
IFC
The format for BIM Level 3 is _____________.
Integrated, Interoperable data
The format for BIM Level 1 and BIM Level 2 is _____________.
Models, objects
Level 3 BIM is also known as ________.
Open BIM
A BIM model is characterized as a facility life cycle management requirement by NBIMS.
True
Edits are typically indirect in parametric modeling.
True
Models with no support of behavior is not a BIM platform.
True
Parametric modeling has constrained sketching.
True
Parametric modeling represents objects by parameters and rules that automatically determine the geometry and optionally nongeometric properties and features.
True
A BIM information sender, receiver, and processor used within a BIM process in association with BIM _______.
platform
Mapping the BIM process for project execution consists of a _____ level approach.
two
For a B-rep, the inner core is _______.
void