BIM Tools and Parametric Modeling-True/False + Vocabulary

Lakukan tugas rumah & ujian kamu dengan baik sekarang menggunakan Quizwiz!

Match the following: BIM Level 0 BIM Level 1 BIM Level 2 BIM Level 3

BIM Level 0 - CAD BIM Level 1 - 2D/3D BIM Level 2 - BIM BIM Level 3 - BLM

Match the following BIM levels with their respective tools: BIM Level 0 BIM Level 1 BIM Level 2 BIM Level 3

BIM Level 0 - Paper BIM Level 1 - File-based collaboration BIM Level 2 - Files & Libraries BIM Level 3 - Integrated Web Services BIM Hub

What is the full form of BPMN?

Business Process Modeling Notation

What does CDE stand for?

Common data environment

What does CSG stand for?

Constructive Solid Geometry

The format for BIM Level 0 is _____________.

Drawings, lines, arcs, texts, etc.

A 3D model is not the mathematical representation of any three-dimensional object.

False

A typical solid model is defined by points, solids, and surfaces.

False

Digital representations of building components that carry computable graphic and data attributes, as well as parametric rules do not allow for intelligent manipulation.

False

Direct modeling is flexible and has linear parameters.

False

Gateways cannot modify the process path based on a decision.

False

Parametric modeling allows for radical changes at any time.

False

Parametric objects can be defined and managed only at a certain number of relevant levels of a hierarchy.

False

The project team only needs to identify the predecessor of each process in order to define the dependency between each process.

False

To create a detailed process map, the team should non-hierarchically decompose the BIM Use into a set of processes.

False

Which of the following is a standard for BIM level 3?

IFC

The format for BIM Level 3 is _____________.

Integrated, Interoperable data

The format for BIM Level 1 and BIM Level 2 is _____________.

Models, objects

Level 3 BIM is also known as ________.

Open BIM

A BIM model is characterized as a facility life cycle management requirement by NBIMS.

True

Edits are typically indirect in parametric modeling.

True

Models with no support of behavior is not a BIM platform.

True

Parametric modeling has constrained sketching.

True

Parametric modeling represents objects by parameters and rules that automatically determine the geometry and optionally nongeometric properties and features.

True

A BIM information sender, receiver, and processor used within a BIM process in association with BIM _______.

platform

Mapping the BIM process for project execution consists of a _____ level approach.

two

For a B-rep, the inner core is _______.

void


Set pelajaran terkait

The Point: Chapter 27 Female Genitalia

View Set

Real Estate State Law Practice Exam 4, PRACTICE TEST 1, State Test Prep., Real Estate State Law Practice test 6, National Test, Exam 1, Nevada Real Estate, Real Estate

View Set

Vitamins & Minerals - Functions & Benefits

View Set

Purposive Communication and Four Model of communication

View Set

Abeka Kings of Israel 9th Grade Final Review

View Set

Assessment: Ch 25 - Assessing Neurologic System

View Set