CAPM Exam Study guide

Pataasin ang iyong marka sa homework at exams ngayon gamit ang Quizwiz!

The five Project Management Process Groups are:

"Initiating, Planning, Executing, Monitoring and Controlling, and Closing"

Analysis of PM responsibilities ..

#1: Responsible for Defining Project Goals #2: The Responsibility of the Project Manager for the Project Management Plan '** (Don't forget that you bear the Ultimate Responsibility for project success. It's your ROLE.) #3: Project Manager Duties During Project Execution #4: Project Manager is Responsible for Controlling the Project #5: The Responsibility of a PM to Continuously Improve

project management processes

*"Initiating, Planning, Executing, Monitoring and Controlling, and Closing" *Those processes that ensure the effective flow of the project throughout its life cycle, including the tools and techniques involved in applying the skills and capabilities described in the Knowledge Areas. *used to plan and execute large projects such as the construction of a new factory or the production of complex products such as airplanes

Process Groups

1. Initiating 2. Planning 3. Executing 4. Monitoring and Controlling 5. Closing

The Benefits of Program Management

A few benefits of program management include: Less conflict among projects Optimal utilization of resources Resource constraints are minimized Better communication and coordination among projects Improved organizational performance

Functional Organization (also pg 365, 372, 681)

A form of organizational structure. Functional organizations are traditional organizations with hierarchical reporting structures. Departmentalization around specialized activities such as production, marketing, and human resources. A hierarchical organization where each employee has one clear superior, and staff are grouped by areas of specialization and managed by a person with expertise in that area.

1.2.3.3 Portfolio management

A portfolio is defined as projects, programs, subsidiary portfolios, and operations managed as a group to achieve strategic objectives.

project

A temporary endeavor undertaken to create a unique product, service, or result.

Understand purpose and activities of a Project Management Office (pg20)

AKA Project Mgt Office (PMO) refers to a department that can support project managers with methodologies, tools, training, etc,. or even ultimately control all of the organization's projects. Ususally the project office serves in a supporting, defining standards, providing best practices, and auditing projects for conformance. "Positive Light" , Ex: IGBU office

interpersonal skills

Ability to motivate, interact, lead and manage people concerning or involving relationships between people

Project management office

An organizational structure that standardizes the project-related governance processes and facilitates the sharing of resources, software, training, templates, methodologies, tools, techniques., Policies, dispute resolutions, communications, and other services.

Change Request

Any requested change to a documented baseline. implemented once the scope, cost, schedule or quality is baselined. Change Requests are formal. If before baseline then not so formal. Processed according to the change control system.

managing

B p688 Managing: the act of assembling and working with teams and organizing and executing tasks to deliver key results. *To perform five basic functions: planning, organizing, staffing, leading, and controlling .* getting the work of an organization done through its people and resources * to handle, direct, govern, or control in action

cultural and social environment

Defines how a project affects people and how those people may affect the project. Cultural and social environments include the economic, educational, ethical, religious, demographic, and ethnic composition of the people affected by the project.

7 project management processes of integration

Develop Charter, Develop Project Management Plan. Direct and manage project Work, Manage Project knowledge, Monitor and control Project Work, Perform integrated Change control, close project or phase.

EEF and OPAs Summary

Enterprise environmental factors (EEF) and organizational process assets (OPA) are the most widely referred to influences in the PMBOK Guide. EEFs provide you with a controlled environment in which your organization lives and you complete your project. OPAs help you by providing all corporate knowledge, policies, and procedures, etc. You have to understand these influences as they are inputs of most processes and you have to manage your project within them.

Project environment factors that impact outcome of project

Enterprise environmental factors are internal and external environmental factors that can influence a project's success, including: Organizational culture. Organizational structure. Internal and external political climate. Existing human resources. Available capital resources. Regulatory environment. Financial and market conditions ** Enterprise environmental factors are an input to 27 of the 47 processes.

7 project management processes

Establish a Project Charter. Develop Preliminary Project Scope Statement. Develop Project Management Integration Plan. Direct and Manage Project Execution. Monitor and Control Project Work. Integrate Change Control. Close Project.

1.2.3.2 Program management

Focuses on interdependencies between projects and between projects and the program level to determine the optimal approach for managing them.

Types of Organizational Structures

Functional Matrix Projectized A project operates with people, process and technology of an organization. Projects have an impact on the culture, policies, procedures and other aspects of an organization. The organizational structure has a major influence on the execution of the project. The organizational structure decides the resources, communication methods and other aspects of project management. Different types of organizational structures include: Organizational Structure: Functional Organization

Define a typical project lifecycle

I: A project life cycle is the sequence of phases that a project goes through from its initiation to its closure. The number and sequence of the cycle are determined by the management and various other factors like needs of the organization involved in the project, the nature of the project, and its area of application.

Organizational Structure: Projectized Organization

In a projectized environment, the entire company is organized by projects, and the project manager is in control of the projects. Individuals or employees are assigned to projects and report into a project manager. Ones the project is over, they need to be assigned to another project. Communication primarily occurs within the same project.

Difference between leadership and management

Leadership: Attempting to motivate/influence people Mgmt: Directing people toward organizational goals Management maintains the status quo and keeps things as they are. Leadership changes the status quo and moves people in a new direction. Page 43, 61 Leadership: influence relationship, done by leaders and collaborators, episodic affair, does not need a position to operate. Management: authority relationship, managers or subordinates, done continuously, requires positon

Organizational Process Assets (OPA)

Organizational process assets can be divided into two categories. The first is for processes, policies and procedures for conducting work, which include the following: Policies Procedures Standard templates General guidelines The project management team cannot update or modify these elements usually, as they have been provided by the organization. However, a project manager can provide feedback or suggestions, and higher management can make a decision to update or modify. The second category comprises the corporate knowledge base for storing and retrieving information. For example: Risk register Lessons learned Stakeholder register Past project files Historical information These organizational process assets influence the project's success, and they keep growing as the organization becomes larger. Let us say that you are in the identify risks process. You decide to start identifying risks by using a checklist. You are not going to create this checklist from scratch; you will you look at any similar past project records to find a risk checklist and customize it as per your project requirements. This will save you a lot of time. There is a very famous saying in project management, "Why reinvent the wheel?" which means if you have something available to you, why would you try to remake it? You are free to update or modify elements from this category. Organizational process assets are used extensively in project management. It is the responsibility of the project management team to look for any relevant documents in historical records before starting to build something from scratch. The Difference between Organizational Process Assets and Enterprise Environmental Factors There are many differences between organizational process assets and enterprise environmental factors. Organizational process assets help organizations to improve their processes, help project management teams to learn, and share best practices by using a collective knowledge base. On the other hand, enterprise environmental factors may or may not help your organization. These are the conditions in which your organization has to work and do not fall under the control of the project management team. For example, if the government increases taxes, it will affect your profits negatively; however, if they decrease taxes, your profits will increase. Moreover, enterprise environmental factors are not easy to change; you have to live with them. Organizational process assets can be customized according to their suitability and they make the project management team's life much more comfortable. It is important to note that organizational process assets always support the project team, while enterprise environmental factors can help or hinder.

Purpose and activities of PMO:

PMOs take on various tasks in an organization, but here are the six most important functions of a PMO: Ensure PM standards and quality across the organization. ... Strategic project management. ... Operative assistance. ... Coordination of projects and resources. ... Increasing effectiveness and efficiency. ... Project coaching and training. A PMO makes sure company procedures, practices and operations go right — on time, on budget and all in the same way. "PMOs are there to ensure project and program success, and that's critical because organizations deliver value through projects and programs,

Work Authorization System (WAS)

Part of the overall project management information system (PMIS). Used to ensure that work gets done at the right time and in the right sequence. Might be an email or formal request from a PM to a functional manager used to get an assigned resource released to complete scheduled work.

Project Roles in order...

PjM project manager PjC Project Coordinator PjE project expediter SM Senior manager FM Functional Manager St Stakeholder Sp sponsor PO Prgm M program manager

1.2.3.6 Organizational project management (OPM) and strategies

Portfolio: aligns portfolios with strategies by selecting the right programs and projects. Programs: harmonize its components and controls interdependencies in order to realize specific benefits. Projects: enables the achievement of goals and objectives.

Executing

Processes that EXECUTE the Plans and produce work

Planning

Processes that create the PLANS that will govern the work

Deliverable

Product service or result created by a project! Any unique and verifiable product, result, or capability to perform a service that is required to be produced to complete a process, phase, or project.

3.0 Role of a Project manager?

Project managers play the lead role in planning, executing, monitoring, controlling and closing projects. They are accountable for the entire project scope, project team, resources, and the success or failure of the project. A project manager is a person who has the overall responsibility for the successful initiation, planning, design, execution, monitoring, controlling and closure of a project. ... The project manager should make sure they control risk and minimize uncertainty.

1.2.3.5 Operations and project management

Projects can intersect with operations when: developing a new product, improving process, at the end of the product life, and at each close out phase.

1.2.3.1 Overview

Projects may be managed in three separate scenarios: as a stand-alone project (outside of a portfolio or program), within a program, or within a portfolio. Program and project management focus on doing programs and projects the right way; and portfolios management focuses on doing the right programs and projects.

Project Management

The application of knowledge, skills, tools, and techniques to project activities to meet project requirements a systemized, phased approach to defining, organizing, planning, monitoring, and controlling projects

Project environment

The location and culture of the environment where the project work will reside. The project environment includes the social, economic, and environmental variables the project must work with or around. The project environment includes not only the physical space where the team will work, but also the project culture as well. Does the team meet and operate on a face-to-face basis or in a virtual environment?

Project portfolio management

The management and selection of projects that support an organization's vision and mission. It is the balance of project priority, risk, reward, and return on investment. This is a senior management process.

physical environment

The physical structure and surroundings that affect a project's work.

triple constraint theory

The triple constraint theory, also called the Iron Triangle in project management, defines the three elements (and their variations) as follows: Scope, time, budget.(cost). quality and risk are also factors that are linked to the triple constraint. Bp712: the intersection of scope, time and cost on a project. the Triple constraint emphasizes that one of these cannot change without affecting at least one of the other two.

The Difference Between Portfolio Management and Program Management

There are a few differences between portfolio management and program management, including: Program management manages similar projects while portfolio management manages dissimilar projects or programs. The scope of program management is broader than the project scope, and a portfolio has an organization-wide scope, which changes with the strategic objectives of the organization.

General management skills

These include the application of accounting, procurement, sales and marketing, contracting, manufacturing, logistics, strategic planning, human resource management, standards and regulations, and information technology.

Application Area

an area of expertise, industry, or function where a project is centered. or A category of projects that have common components, often categorized as technology projects, customer projects, or industry projects (IE: Architech, IT, Healthcare,

PMMS Project Manager's Management Skills

b p24 and gloss: skills significantly effect the projects. Experience in Leading, communicating, negotiating, problem-solving, influencing,

Distinguish between organizational systems

book p710 system: The rules, processes, procedures, people, and other elements that support an outcome or process. Several systems are defined in project management, including the project management information system, the change control system and the work authorization system.

PMIS Project management information system

bp699: The system used to support management of the project.. It serves as a repository for information and a tool to help with communication and tracking. The PMIS supports the project from beginning to end. p336 - is a software system that helps the project mgr with routine tasks or tedious calculations. helps store and organize information, experiment with alternatives and rapidly optimize resource usage and calculate schedules.

Change Control Board (CCB)

*A formally chartered group responsible for reviewing, evaluating, approving, delaying, or rejecting changes to the project, and for recording and communicating such decisions. * A formal group of people responsible for approving or rejecting changes on a project

Work Authorization System

*A subsystem of the overall project management system. It is a collection of formal documented procedures that defines how project work will be authorized (committed) to ensure that the work is done by the identified organization, at the right time, and in the proper sequence. It includes the steps, documents, tracking system, and defined approval levels needed to issue work authorizations. * A formal process to ensure work is done in the right sequence and at the right time. *Part of the overall project management information system (PMIS), the work authorization system is used to ensure that work gets performed at the right time and in the right sequence. It may be an informal email sent by the project manager to a functional manager, or a formal system to get an assigned resource released to complete scheduled work.

project management information system

*An integrated tool used to gather, integrate and disseminate the outputs of the project management processes - PMBOK® Guide 5th Ed., p. 92 *An information system consisting of the tools and techniques used to gather, integrate, and disseminate the outputs of project management processes. It is used to support all aspects of the project from initiating through closing, and can include both manual and automated systems. *provides access to tools, such as scheduling tool, a work authorization system, a configuration management system, an information collection and distribution system, or interfaces to other online automated systems

change management

*Process of making sure changes are made smoothly and efficiently and do not negatively affect systems reliability, security, confidentiality, integrity, and availability. *a set of techniques that aid in evolution, composition, and policy management of the design and implementation of a system *A methodology for making modifications to a system and keeping track of those changes.

Project Integration Management

*Processes that coordinate all project management knowledge areas throughout a project's life, including developing the project charter, developing the preliminary project scope statement, developing the project management plan, directing and managing the project, monitoring and controlling the project, providing integrated change control, and closing the project *Project Integration Management includes the processes and activities needed to identify, define, combine, unify, and coordinate the various processes and project management activities within the Project Management Process Groups. *-------- -------- -------- includes the processes and activities to identify, define, combine, unify, and coordinate the various processes and project management activities within the Project Management Process Groups.

Program Management

*The application of knowledge, skills, tools, and techniques to a program to meet the program requirements and to obtain benefits and control not available by managing projects individually.(same in video) *The process of managing multiple interdependent projects to improve the performance of an organization. *The centralized coordinated management of a program to achieve the program's strategic objectives and benefits.

change control

*The process of performing an impact analysis and obtaining approval before modifications to the project scope are made *A process whereby modifications to documents, deliverables, or baselines associated with the project are identified, documented, approved, or rejected *Maintaining full control over requests, implementation, traceability, and proper documentation of changes.

Integration Management

*processes and activities to identify, define, combine, unify, and coordinate the various processes and project management activities *includes processes/activities needed to identify, define, and coordinate various processes and project management activities. Book p63: system working together, represents the whole forest. 7 processes focus on the larger, macro things. These 7 are the HEART of managing the Entire Project In integration management the PROJECT is Started, PM assembles the Project PLAN, Executes the plan, and verifies the results of the work, and then the project is closed, knowledge is captured, all at same time PM must prioritize different objectives competing for time, resources and keep team focused on completing the work. 7 Integrated Management processes, how they fit together and Impact each other.

5 Roles of a Project Manager

1. Ultimate Responsibility Bearer 2. The Primary Role of Project Manager is Integrator 3. Project Manager Role of a Facilitator 4. Proactive Communication is a Duty of a PM 5. Proactive Problem Solver The Role of a Project Manager Develops with the Project Roughly your role develops in three stages during one project. Until you fulfill your duties at the first level, you can't efficiently move to the second one. The same applies to the third level. 1. Administrator Role Define the project boundaries Create a project management plan Staff the positions on the project Define processes and policies Create the workflow Define roles and responsibilities Organize the project team Ensure the project is progressing Control the project 1. Facilitator Role Resolve conflicts Ensure Interactions Coordinate the work Educate the team Stay out of the way 3. Leadership Role Set goals Empower responsibility Develop team Motivate Influence stakeholders Make tough decisions Ensure collaboration Design meaning for the work

Functional Manager

681: FM is a manager of a department or functional group within an organization. FMs are vital to most companies since they have a deep expertise within a given area and perform the human resource management duties for the employees of their departments. PrjMgrs experience most of their conflicts with Functional managers. p19: FM is the departmental mgr in most orgs, like mgr of engineering, director of marketing, or IT mgr. FM usually "owns" the resources that are loaned to project and has HR responsibility.FM may be asked to approve the overall project plan. FM can be rich source of expertise and info available to PM. Also FM most likely person with whom PM experiences conflict. 372: In a matrix org, team members report to both the PM and the FM, can sometimes cause confusion and can lead to conflict on a project and withing the Org. 369: Func Mgr has resource responsibilities in a Matrix Org. In Matrix Org structure PM and FM secure resources.

Subproject

A smaller portion of the overall project created when a project is subdivided into more manageable components or pieces.. Often is contract work and helps keep the overall project moving.

What is the relationship between project program and portfolio management?

A program is a group of projects that are similar or related to one another, and which are often managed and coordinated as a group instead of independently. A portfolio is a group of different programs and/or projects within the same organization, which may be related or unrelated to one another.

Program

A program is a group of related or similar projects managed in a coordinated way to get the benefits and control not available from managing them individually. This means that in a program, you will have multiple projects, which are either similar or related to each other, and you manage them at a higher level. For example, assume you have two projects: the first is to construct a school building and the second project is to construct an office building. Since these two projects are similar, you will keep them under a program. The person responsible for managing the program is the program manager. The success criteria for a program is the degree to which it satisfies its objective. P14: note every Project will belong to a program but all programs are made up of Projects.

Project

A project is the lowest level in the hierarchy of project, program, and portfolio. According to the PMBOK Guide, (p13) "A project is a temporary (finite) endeavor undertaken to create a unique product, service or result." So, you can say that the nature of a project is temporary (P13- "time limited, definite beginning and end, also means the project does not include Operations, since Operations may go on perpetually and projects are "Finite", + project is "unique" - NOT been attempted before by this organization"!); once the project achieves its objective, it no longer exists, and the objective of the project is to create a unique product, or develop a system to provide you with a service or the result. For example, assume you have been given a project to set up a call center for a company. You complete the project, set up the call center, and hand it over to your client. Now your client can provide a support service to their customers. Please note that once you hand over the product to the client, your project will be completed and closed. You will disband your team; members will be separated, since the nature of the project is temporary. It is not necessary for your team members to be located in the same place; sometimes your project team may include members located outside your geographic location. In this case, you will call your team a virtual team. As a project manager, you will be responsible for managing projects, and the success criteria being timely completion, under budget, and conformance to the requirements.

OPA ASSETS

An asset is defined as a useful or valuable entity or property owned by a person or company, which has value and is available to meet debts, commitment, or legacies. Basically, assets are something that you can own, keep, and make use of at any point in time. Examples of assets are numerous; you can have a car, which helps you move around, a house to live in, a computer to work on... the list is endless. In the same way, organizations also have assets that help them achieve their goals. Here these assets are called organizational process assets. These OPAs are inputs of almost all processes of the PMBOK Guide. The project management team may modify these OPAs according to their requirements. Once the project has ended, these organizational process assets can be stored in a central repository so that they can be used whenever required for any future projects.

Document the Project Tailoring Process

As part of the project you need to document the tailoring process approach in the project management plan. As the processes are tailored you also need to document how each process was tailored and why it was added, removed, or revised. This serves two functions. One is to document all of the adjustments made as part of the tailoring process to have a good record of the project for close out purposes. The second is to show which tailored processes worked well, and which ones may need further adjustment for future projects. By documenting the tailored processes, process tailoring guidelines and project tailoring checklists can be developed (or improved upon if already existing) to improve the process of tailoring for future projects within the organization.

Summary of Project, Portfolio, Program and Organizational Management

As you move from project management towards portfolio management, the scope and objectives will become larger and larger. In project management, you perform micro-management, and in portfolio management, high-level macro-management is required. Program management and portfolio management facilitate better communication and coordination among projects and programs, resulting in enormous benefits to economies of scale and fewer risks.

Assess the Project Tailoring Needs

Assessing the project tailoring needs can be completed by asking questions in regards to each of the project management knowledge areas to determine which processes are required for project success and which may need to be adjusted. Below is a small list of example questions a project manager may want to ask when tailoring their project. Each project is unique, so you should develop a list of questions to best fit your project. Project Integration Management:• Is this a phased project and if so, how many phases will this project have?• What is the size / complexity of the project and how will it impact the project management plan? Project Scope Management:• Will we use Agile or Waterfall?• Are the project requirements clearly or loosely defined? Project Time Management:• How is time spent on the project logged by everyone?• Does the project need to be fast tracked? Project Cost Management:• What tools will be utilized to track actual spending?• Is the project team managing finances or do we need to involve the finance department? Project Quality Management:• Does the organizational quality policy affect this project?• Are there any regulatory quality requirements that impact this project? Project Human Resources Management:• Are required skills available in-house to complete this project or will resources need to be hired?• Will the project team be co-located or virtual? • Have they worked together previously? Project Communications Management:• Will project team members be allowed to directly communicate with stakeholders or will all communication need to go through the project manager?• What are the preferred communication methods of the project team and stakeholders? Project Risk Management:• What would be the impact to the organization if the project were to fail?• How much risk management is "right" for the project? Project Procurement Management:• Will the project management team have the authority to sign contracts or will this be done by a procurement or legal department?• What level of approval will the project team have for purchases ($100, $1,000, $10,000, etc.)? Project Stakeholder Management:• Are the Stakeholders physically located near the project?• What is the anticipated involvement of the stakeholders?

Evaluate Existing Project Management Processes

Before you can even consider tailoring processes to meet the needs of your project you need to fully understand the project management methodology and processes utilized by your organization. Some organizations implement the philosophy of setting a base list of processes that must be utilized for each project and allowing for adding processes as long as the base requirements are met. Some organizations identify all possible processes that may be utilized for a project and allow for the removal of some if not most of the processes depending upon the project needs. Others may employ a strict method that must be adhered to and may not be altered without prior approval. Prior to doing any project tailoring it is best to fully understand the processes and know your organization's stance on making adjustments in order to best tailor those processes for your project.

project lifecycle

Book: A group of project phases specified by an organization's project management methodology. The Project life cycle is made up of all of the project phases, viewed as a whole. Projects are divided into phases in order to create a logical management and decision points. See phase for more info... "Initiating, Planning, Executing, Monitoring and Controlling, and Closing" A collection of generally sequential and sometimes overlapping project phases whose name and number are determined by the management and control needs of the organization or organizations involved in the project, the nature of the project itself, and its area of application A collection of project phases, such as concept, development, implementation, and close-out

Phase

Book: a grouping of project activities. Many projects are divided into two or more phases in order to provide a point where the deliverables can be evaluated. Phases are separated by exit gates or kill points where someone who does not directly work with the project (the gatekeeper) evaluates the deliverables to determine whether or not the next phase is initiated. Phases should not be confused with process groups.

Change Control System

Bp667 The procedures for evaluating and managing request changes to the project. This system varies from project to project and org to org. *A set of procedures that describes how modifications to the project deliverables and documentation are managed and controlled. *a formal, documented process that describes when and how official project documents may be changed *A predefined set of activities, forms, and procedures to entertain project change requests.

Leading

Bp687 Leading: the act of establishing a direction, aligning the team to that vision, and motivating and inspiring them. B p24 Setting direction, aligning people to that direction, motivating them, and inspiring them to commit and perform. * inspiring and motivating workers to work hard to achieve organizational goals * creating a vision for the organization and guiding, training, coaching, and motivating others to work effectively to achieve the organization's goals and objectives

EEF enterprise environmental factors

Examples of external enterprise environmental factors are as follows: Government regulations Market conditions External political conditions Industry standards Legal restrictions A few examples of internal enterprise environmental factors include: Organizational culture Type of organizational structure Internal political conditions Available resources Infrastructure

International and political environments

Consideration of local and internal laws. languages, communication challenges, time-xone differences, and other non-collocates issues that affects a projects ability to progress

Organizational Structure: Matrix Organization

In a matrix organization, the team members report into two bosses: the functional manager and the project manager. Communication goes from team members to both bosses. The matrix organization is created to get the best potential from both functional and projected type of organizational structure. Team members have departmental work and they also do project work. Depending on the strength of the matrix organization, the power or level of authority varies between the project manager and the functional manager. In a strong matrix organization, the power remains with the project manager. In a weak matrix organization, the power remains with the functional manager. The project manager is considered to be a coordinator or an escalator. In a balanced matrix, the power is equally balanced between the project manager and the functional manager.

Re-Evaluate Project Management Processes

Just as with many project management processes, you can't just tailor a process and walk away. As the project progresses, it is vital to re-evaluate the processes being used to determine if the tailoring is working as planned and if additional adjustments are necessary. This can be completed formally at the start of a new phase if this is a phased project or even informally as part of the project status meetings. No matter the method you chose to re-evaluate, document the approach and the results both as part of your project documentation. Project process tailoring is a good project management practice that helps ensure a successful project outcome. A project manager should not blindly apply a methodology, but instead should evaluate the existing processes, assess the project to be completed, document any process tailoring completed, and re-evaluate the tailoring process as the project proceeds. Here we have provided a high level project process tailoring method that you can apply to your projects.

1.2.3.4 Operations management

Operations management is an area that is outside the scope of formal project management as described in this guide. Is concerned with the ongoing production of goods and/or services. Ok ensures that business operations continue efficiently by using the optimal resources needed to meet customer demands. It is concerned with managing processes that transforms inputs into outputs.

Organizational Process Assets

Organizational process assets include any of the organization's process assets that may be used to ensure project success. They generally fall into two categories: Processes, guidelines, and procedures, such as: organizational standard processes, standardized guidelines, templates The corporate knowledge base, such as, lessons learned, historical information, past project files (I call this: The Repository of Goodness) Organizational process assets are an input to 38 of the 47 processes. Example As we started the project to develop PMI-ACP (Agile Practitioner) courseware, for organizational process assets, we leveraged our course book templates that are used for all of our course materials. In addition, as we developed our approach, we took into consideration the lessons learned from our past courseware development projects. Regarding enterprise environmental factors, we took into consideration the market demand for Agile certifications, the expertise that resided in our immediate development team, and the resources that were available to us. Summary Enterprise environmental factors are the internal and external influences on our project, such as the corporate culture or the financial environment. Organizational process assets are the procedures, guidelines, templates that we can use on our project as well as the corporate knowledge base, such as past project reports and lessons learned.

sphere of influence

Outer Band: Regulatory Agencies Next band: Customers/users Business Partners Sellers/suppliers Next band: Functional managers Operational Mngers next band: Portfolio manager program manager next band in: Sponsor Inside circle: Project manager PM team Project Team Mems

what a good project manager is responsible for!

PMGuide: The project manager is is the person assigned by the performing organization to lead the team that is responsible for achieving the project objectives. A project manager is a leader first of all! 1. Has ultimate responsibility for the project's success. 2. He's the main communication point with a Client. 3. Promotes a productive and collaborative environment. 4. Controls and enhances the positive effects of cultural differences. 5. Ensures professional interaction between team and stakeholders. 6. Ensures collaboration within the team. 7. Resolves personal conflicts. 8. Enforces personal responsibility. 9. Protects the team from internal politics. 10. Assists during the pre-sale process. 11. Helps to produce Project Charter. 12. Identifies all key stakeholders. 13. Develops a strategy to work with all stakeholders. 14. Selects appropriate processes for the project. 15. Sets up a collaboration with global and virtual teams. 16. Explains the project life cycle and processes to stakeholders. 17. Coordinates work between the project and key stakeholders. 18. Integrates all pieces of a project into a whole. 19. Works with stakeholders to identify constraints and assumptions. 20. Is responsible for producing the Project Management Plan. 21. Leads and facilitates the planning process. 22. Ensures collaboration of the team and stakeholders during planning. 23. Identifies dependencies of project activities. 24. Enforces risk management processes. 25. Analyses requited time and cost reserves. 26. Identifies the required level of quality for the project. 27. Selects and controls processes that can deliver the required quality. 28. Is responsible for developing a realistic schedule. 29. Participates in procurement processes. 30. Creates Change Management Plan. 31. Actively avoids changes. 32. Controls implementation of approved changes. 33. Assists the team during project execution. 34. Works with stakeholders to meet their expectations. 35. Ensures that deliverables are accepted by the customer. 36. Works with the team to keep as close as possible to the Plan. 37. Moves the project towards its goal on a daily basis. 38. Uses metrics to control project progress. 39. Communicates project progress to key stakeholders. 40. Keeps the focus of the team on Risk Management throughout the project. 41. Spends time to improve processes. 42. Works to improve project and product quality. 43. Motivates the project team. 44. Ensures that people leave the project motivated. 45. Holds team building activities. 46. Casts his vision of a successful project and product. 47. Develops team members both for project and organization benefits. 48. Organizes performance reviews. 49. Solves problems. 50. Controls the project in all aspects (scope, time, costs, risks, quality, etc.) 51. Analyses variances with the Project Management Plan. 52. Determines whether a change request is needed to get back on track. 53. Performs project closure. 54. Ensures all contract obligations are closed. 55. Logs lessons learned. 56. Updates the organization's knowledge base.

Portfolio Management

Portfolios are managed under portfolio management. It has a bigger scope and objective than program management. There is centralized management in portfolio management, that individual's job is to identify, prioritize, and authorize the projects or programs. This centralized management manages the projects or programs to achieve the organization's strategic objectives. Portfolio managers set the priorities of projects based on the leadership's agreed-upon business objectives. They select the program or projects under a particular portfolio and make sure that they provide the most benefit to the organization. Please note, although portfolio management sets the priority of the projects or programs in a group, it does not oversee any individual project or program.

Program Management

Programs are managed under program management, which is defined as the centralized, coordinated management of a program to achieve its strategic objectives. You only manage the interrelated or similar projects as a group to accomplish the desired result. The objective of program management is to optimize the resource utilization among projects and reduce the friction to increase the organization's performance. The Difference Between Project Management and Program Management The following are a few differences between project management and program management: In project management, you manage one project, while in program management you manage multiple projects. A project can be a part of a program, but a program cannot be a part of a project. Project management addresses the management of the project; while program management helps you set the project management processes and measure the project results.

Key documents of Integration (section 4.5)

Project charter, assumption log, Project management plan, issue log, lesson learned register, Work performance reports, change requests, project documents updates (change log) , final report, project documents updates.

Project Management

Project management is about managing projects, and it helps projects achieve their objectives. The processes include initiating the project, developing a plan, executing the project, controlling the project activities throughout its lifetime, and finally handing over the output of the project to the client, and closing the project. Project management is the application of knowledge, skills, tools, and techniques to meet project requirements.

The Benefits of Portfolio Management

Some benefits of portfolio management include: Optimal allocation and utilization of resources among projects or programs Constant support to projects or programs Fewer conflicts and better communication among projects or programs Better coordination among projects or programs

Tailor

Tailor, in project management, is the act of choosing the process, related inputs and outputs of the project carefully to determine the subset of the processes to be included in the management approach of the project. It also involves adapting the specifications and requirements of the project to the current needs of the operation. To tailor a project, reviewing, modifying and supplementing the project data is usually done. This project management process ensures that the project is performed in accordance to the requirements of the organization. This process is intended to aid the project management team in planning, controlling and governing the use of the project and deliverables appropriately so that the project team can work in the project deployment. Examples of tailoring that are common in project management include the addition and removal of tasks and work products, changing milestones and their state of completion, responsibilities for review and approval and detailed procedures for performing measurements and managing requirements. Once the process tailoring is completed, deployment usually follows. However, the deployment may vary depending on the degree of the changes made. For instance, if the changes are minor, simple briefing may be needed to the affected stakeholders. Big changes, on the other hand, requires the entire workshop's team familiarized with the processes.

Why is an Organizational Structure Needed?

The market is competitive; therefore, the organization should adapt to market demand and be responsive. Organizations with poor structure will not survive. A well-defined structure helps the organization realize its potential and support its objectives. For example: Let us say your organization is producing a product. Your customers are satisfied and not very demanding; what kind of organizational structure will you select? You will select the functional organizational structure because it supports production operations. Let's consider another case. Suppose your organization has ten employees and deals with small projects. You always start looking for a new project. In this case, what kind of structure will you select? You will select the projectized organizational structure as you are dealing with projects. Now, the final case. Your organization is enormous. The work environment is dynamic. Customer requirements and market demands are always changing. What kind of structure will you select? You cannot select the functional organization because it does not allow for quick changes to its operations. You also cannot select the projectized structure. Although it supports a dynamic nature, this is not enough. Your organization is big and you need permanent departments to keep your organization functioning. This is not possible with a pure projectized organization. Therefore, you will select a matrix organizational structure. It has the qualities of both the functional and projectized organizational structure and will support your operations and help achieve the organization's objectives. Types of Organizational Structure The type of structure depends on many factors, such as governing style, leadership style, workflow, hierarchy, and many more. The PMBOK Guide defines eight organizational structures: Organic or Simple Organization Functional or Centralized Organization Multi-divisional Organization Matrix Organization Project Oriented (Composite or Hybrid) Organization Virtual Organization Hybrid Organization PMO

Progressive Elaboration

The process of gathering project details. This process uses deductive reasoning, logic, and a series of information-gathering techniques to identify details about a project, product, or solution.

PMguide definition of Project manager

The project manager is is the person assigned by the performing organization to lead the team that is responsible for achieving the project objectives.

Project environment you should practice the three R's. R-___________,R_________,R___________

They are real time, relationship and responsibility. These three R's of project management can transform an idea into a successfully completed project. When planning a project it is important to give real time schedules in which a project can be finished. To do this, it's important to make a plan of action. You want to include when will the project start, how long it will take, review points, due date and finalizing with the client.

Organizational Structure: Functional Organization

This is the most common form of an organization. Organizational departments are grouped by areas of specialization within different functions. In these organizations, a project generally occurs in silo environment, i.e. within the same function. Team members complete the project work over and above their responsibilities to normal departmental work. Communication primarily occurs within the same function.

Tailoring Projects

a project is "a temporary endeavor undertaken to create a unique product, service or result". Being that each project is unique it is important to also understand that an organization's project management processes will likely need to be tailored in order to ensure project success. Project tailoring takes into consideration that project management processes are not "one size fits all", meaning there will be many times when processes need to be adjusted (added, removed, or revised) in order to ensure project success. Tailoring in project management can happen at any time and for any process being applied to a project. Organizations often have a project methodology in place and may realize that this methodology needs to allow for adjustments to best manage a variety of projects. As a project manager you cannot blindly follow a methodology, you need to know how to assess a project to determine what processes will need to be adjusted in order to achieve a successful outcome for your project. Here we are going to look at a very high level method for process tailoring. This four step method includes: evaluating existing processes, assessing the project, documenting the tailoring process, and re-evaluating.

change log

b p667 list of all changes whether or not they were requested, made to the project. Input in to various process to ensure proper review and evaluation. *As changes to the project time, cost, or scope enter the project they should be recorded in the change log for future reference. *A comprehensive list of changes made during the project. This typically includes dates of the change and impacts in terms of time, cost, and risk. *All changes that enter into a project are recorded in the change log. The characteristics of the change, such as the time, cost, risk, and scope details, are also recorded.

Project Manager's sphere of influence

p108 PM must proactive and influence the factors that cause change. p112PM should work proactively to Identify and influence the factors that cause change. Overall goal of Scope mgt are to define the need, to set stakeholder expectations, deliver to those expectations, to manage change and minimize surprises so that product ultimately gain approval. p149: PM should influence the factors that cause change.

Portfolio

p14: project portfolio represents companies entire investment in projects and programs AND should always be directly aligned with Organization's strategic goals! (truest "real strategic goals) A portfolio refers to a group of related or unrelated projects or programs. A portfolio can consist of multiple programs or multiple projects. It can have multiple, dissimilar projects because portfolio management deals with two or more unrelated projects. Conversely, in program management, only related projects are managed. For example, assume you have three projects: the first is to construct a building, the second project is to conduct research on the impact of motor pollution on the environment, and the third project is to set up a call center. How are you going to manage these projects? You will manage them by keeping them under a portfolio because they are neither related nor similar to each other. Portfolio manager manages portfolios. The success criteria for portfolio is the combined performance of its components.

4.1 Purpose of project integration management: defined as:

p63 defined as the practice of making certain that every part of the project is coordinated. . **Cant delegate this! PM Responsibility! PM is Ultimately Responsible for entire project. High Level VIEW of Project. Integration: changes made in any one are of the project must be integrated into the rest of the project.. PHILOSOPHY: 1. execution can be messy, buffer team, PM should make decisions instead of meeting every 5 min. 2. process not straight start to finish. Revisitin alot! 3. integration processes need tailored to fit the size and complexity of a project

Initiating

processes that BEGIN the project

Monitoring and Controlling Process Group

processes that compare the work results to the plan and make adjustments for the future. The project management process group oversees, measures, and tracks project performance. Those processes required to track, review, and regulate the progress and performance of the project; identify any areas in which changes to the plan are required; and initiate the corresponding changes.

Operational Management

responsible for monitoring the daily activities of the business People who monitor the day-to-day activities of the organization.

49 processes of project management

see picture...

Closing

the process that completes the project, phase, or component of a project.


Kaugnay na mga set ng pag-aaral

Texas Principles of Real Estate 2: Chapter 2 Miniquizzes

View Set

PMBOK 6TH ED - PLANNING QUALITY MANAGEMENT

View Set

Interpersonal Communications Chapter 8

View Set

Animal reproduction- 46 pt. 2 female

View Set