Final Exam 3203 Study Guide
B items(moderately important)
40percent of the number of items in inventory but only about 15 percent of the annual dollar value
C items (least important)
40percent of the number of items in inventory but only about 5 percent of the annual dollar value
C
Cause-and-effect diagrams are also known as: A. Pareto charts B. flowcharts C. Ishikawa diagrams D. target specification graphs
C
Cause-and-effect diagrams are also known as: A. Pareto charts B. flowcharts C. fish-bone charts D. target specification graphs
__________ is the amount of time an individual activity in a network can be delayed without delaying the entire project.
Slack Time
F
T/F: A c-chart is a attribute control chart that measures the percent defective in a sample.
F
T/F: A p-chart is a variable control chart that measures the percent defective in a sample.
T
T/F: A well executed lean program requires a meaningful buyer-supplier relationship.
F
T/F: An attribute inspection focuses on items such as strength or dimension while a variable inspection focuses on the good or bad.
T
T/F: Attribute inspection classifies items as being either good or defective.
F
T/F: Cp is the standard criterion used to express process performance.
T
T/F: E-procurement helps reduce costs.
T
T/F: High quality products and services are the most profitable.
T
T/F: ISO 9000 is a quality standard with international recognition.
T
T/F: In a JIT system, production occurs in reaction to demands that have already happened.
F
T/F: Inspections are expensive and add value to the product.
T
T/F: Inventory turnover is calculated on an annual basis.
T
T/F: Inventory turnover is the reciprocal of weeks of supply.
F
T/F: JIT is right for every firm, so all firms should implement its principles.
T
T/F: JIT systems are designed to produce or deliver goods just as they are needed.
T
T/F: Lean systems require managers to reduce variability caused by both internal and external factors.
T
T/F: Long term suppliers are more likely to understand the broad objectives of the procuring firm and the end customer.
F
T/F: Quality lies in the eyes of the beholder related to product based quality.
T
T/F: Shipping accounts for 25% of the cost of a product.
T
T/F: Statistical Process Control (SPC) monitors standards, makes measurements, and takes corrective action as a product or service is being produced.
T
T/F: The R-chart is sensitive to shifts in the process standard deviation.
T
T/F: The lower the percentage of assets committed to inventory, the better.
T
T/F: The operations manager's objective is to build a total quality management system that identifies and satisfied customer needs.
F
T/F: The x-chart and R-chart go hand in when monitoring variables because they measure the two critical parameters of central tendency and quality.
T
T/F: The x-chart is sensitive to shifts in the process mean.
F
T/F: There is no variability with inspections.
F
T/F: Third party logistics fail to add innovation and expertise to the logistics division.
T
T/F: Using p-charts is the chief way to control attributes.
F
T/F: Warehousing adds 10-15% to the cost of a product.
F
T/F: With the few suppliers strategy, one supplier is played against another and the burden is placed on meeting the buyer's demands on the supplier.
Lead Time
Time interval between ordering and receiving the order
Two Bin System
Two containers of inventory; reorder when the first is empty
D
Which of the following is NOT an external failure cost? A. lost goodwill B. returned goods C. costs to society D. scrap
B
Which of the following is NOT one of the major causes of the bullwhip effect? A. demand forecast errors B. shared demand information C. order batching D. none of the above
A
Which of the following is a risk of using the few suppliers strategy? A. suppliers making other alliances or venturing out on their own B. having multiple suppliers to choose from C. low cost of changing partners D. none of the above
B
Which of the following is a variable control chart? A. c-chart B. x-chart C. p-chart D. all of the above
C
Which of the following is an attribute control chart? A. R-chart B. x-chart C. p-chart D. all of the above
B
Which of the following is not a major means of shipping? A. trucking B. door to door C. waterways D. railroads
D
Which of the following is true about the bullwhip effect? A. The bullwhip effect describes the tendency for larger order size fluctuations as orders are relayed to the supply chain from retailers. B. Channel coordination means determining lot sizes as though the full supply chain was one company. C. "Bullwhip" fluctuations create unstable production schedules, resulting in expensive capacity change adjustments. D. all of the above
D
Which of the following statements is TRUE? A. When multiple suppliers are used, having geographically centralized suppliers could lessen the probability of all failing simultaneously. B. The risk mitigation effectiveness of using multiple suppliers has nothing to do with the probability of a super-event occurring. C. It is usually less risky to use single suppliers rather than multiple suppliers. D. When multiple suppliers are used, having geographically dispersed suppliers could lessen the probability of all failing simultaneously.
B
Which order is correct for the stages of the supplier selection process? A. supplier development, supplier evaluation, contracting, negotiating B. supplier evaluation, supplier development, negotiations, contracting C. supplier evaluations, supplier development, contracting D. supplier evaluation, negotiations, contracting
B
Which type of inspection measures dimensions such as weight, speed, size, and strength? A. attribute B. variable C. JIT D. quality
Check sheet
a sheet listing a number of potential problems that receive a check mark every time a problem occurs
Capacity requirement planning (CRP)
a short-range capacity planning technique that is used to check the feasibility of the material requirements plan
C-Chart
a statistical process control technique that is used to monitor the total number of defects per unit
Time series
a time-ordered sequence of observations taken at regular time intervals
Process map
a tool that is the necessary first step to evaluating any manufacturing or service process; a drawing showing how products or people flow through a process
Pareto chart
a useful method for organizing applications of data in many formats
ABC System
a useful technique for determining which inventories should be managed more closely and which others should not
Joint Ventures
Formal collaboration -Enhance skills - Secure supply - Reduce costs
Which of the following statements regarding Gantt charts is true?
Gantt charts are visual devices that show the duration of activities in a project.
Project controlling
Monitor resources, costs, quality, and budgets; revise plans and shift resources to meet time and cost demands.
Project management techniques
Monitor resources, costs, quality, and budgets; revise plans and shift resources to meet time and cost demands.
Which of the following is a basic assumption of PERT?
No activity in the network must be repeated.
B
Prior to embarking on supply chain design, operations managers must first consider all of the following except: A. make-or-buy B. supply chain development C. outsourcing D. none of the agove
Which of the following technologies would enable a cashier to scan the entire contents of a shopping cart in seconds?
RFID - Radio Frequency Identification, or RFID, is a type of technology that has tremendous utility in terms of monitoring and tracking almost anything that moves - including groceries or any other good that can be purchased.
ROP under UNCERTAINTY
ROP=Expected demand during lead time + Safety Stock
ROP under CERTAINTY
ROP=d x LT
Share demand information throughout the supply chain
Remedy for demand forecast errors
Utilize channel coordination
Remedy for order batching
Price stabilization (everyday low prices)
Remedy for price fluctuations
Allocate orders based on past demand
Remedy for shortage gaming
Smooth FM Radio uses a __________ approach when it mixes pre-recorded local segments with its national music blocks.
mass customization - Mass customization is the term used to describe the process where a business tries to move to low-cost production (or service), but still meet the unique expectations of customers
Variable data
measurable data such as weight, time and length
Supply chain delivery performance
measures the average percentage of orders that are filled on or before the requested delivery date
Intermediately positioned strategy
midway between supply source and customers when distribution requirements are high and product comes from various locations
Inventory should be kept at the
minimum level necessary
Single Period
model for ordering perishables and other items with limited useful lives
Controlling
monitor resources, costs, quality, and budgets; Feedback enables revising plans and shift resources to meet time and cost demands
Controlling
monitor resources, costs, quality, and budgets; revise plans and shift resources to meet time and cost demands
Waste of Over-Processing
more work is done on a piece than is required by the customer
Waste of Motion
movement of equipment and workers
Indented Bill of Materials
multilevel bill of materials
Medium(intermediate)-range plans
normally span six to eighteen months -usually involve minor changes in capacity ex. changes in employment levels
Contract
not bound to serve the general public
Private
not subject to economic regulation and typically transports goods for the company owing the carrier
A way to measure the supply chain environmental performance
percentage of partners that have created a director of environmental sustainability position in their company
Company Reputation
perception of new products; employment practices; supplier relations
Managing perceived wait times
place magazines in the waiting room; keep patients informed about the wait times; have the patient fill out forms while waiting
TQM Concepts- cont improvement
plan, do, check, act (the plan)
Primary functions of organizations
planning, organizing, leading, and controlling.
The three phases of project management
planning, scheduling, controlling
Sustainable sourcing
practice aimed at ensuring that purchased products or materials meet environmental objective of the organization
Excess (or insufficient) capacity
prevents firm from taking advantage of the efficiency of manufacturing planning & control system
Product Liability
reduces risk
Project crashing
reducing project duration by increasing direct costs
Capacity
refers to a firms labor and machine resources. it is the maximum amount of output that an organization is capable of completing in a given period of time
Scheduling
relate people, money, and supplies to specific activities and activities to each other
Scheduling
relate people, money, and supplies to specific activities and shows relationship of activities to each other
Level strategy
relies on constant output rate while varying inventory and backlog according to fluctuating demand
An assembly line is an example of a __________.
repetitive process - Assembly line manufacturing is considered a repetitive process due to the fact that specific modules (preassembled parts and components) are assembled into a final product repetitively.
Differing distribution networks
response time, product variety, product availability, customer experience, time to market, order visibility, return-ability
To succeed in a JIT operation you need to
reduce waste & uncertainty by a process of continuous improvement
System Nervousness
small changes in the upper-level-production plan cause major changes in the lower-level production
Critical path
the computed longest time path(s) through a network.
Flow chart
tools that use annotated boxes representing process action elements and ovals representing wait periods, connected by arrows to show the flow of products or customers through the process
The crossover point is that production quantity where __________.
total costs for one process equal total costs for another process
Attribute data
yes/no kinds of data, indicate the presence of some characteristic such as color, satisfaction, workability or beauty
make or buy decisions
choosing between obtaining products and services externally as opposed to producing them internally
Conformance to specifications
does the product do what it is designed to do?
Conformance to customer needs
does the product do what the customers want it to do?
Earliest finish (EF)
earliest time at which an activity can be finished
Earliest start (ES)
earliest time at which an activity can start, assuming all predecessors have been completed
Employee Fulfillment
employee attitudes that can accomplish what is important
Economies of Scale
if output rate is less than the optimal level, increasing the output rat results in decreasing average per unit costs
Diseconomies of Scale
if the output rate is more than the optimal level, increasing the output rate results in increasing average per unit costs
Global Implications
improves ability to compete
Waste of Waiting
(no explanation given)
Seven Wastes is originated by
Shingo & Ohno
Additional S's- Safety
built in good practices
Capacity Considerations
(1) Forecast demand accurately. (2) Match technology increments and sales volume. (3) Find the optimum operating size (volume). (4) Build for change.
Waste of Marking Defective Products
(no explanation given)
Why study decision analysis?
-Help make better decisions -Gather your thoughts -Organize subjective ideas and judgments
LP Assumptions
-Linearity -Divisibility -Certainty -Nonnegativity
Keiretsu Networks
- A middle ground between few suppliers and vertical integration - Supplier becomes part of the company coalition - Often provide financial support for suppliers through ownership or loans - Members expect long-term relationships and provide technical expertise and stable deliveries - May extend through several levels of the supply chain
Vertical Integration
- Developing the ability to produce goods or services previously purchased - Integration may be forward, towards the customer, or backward, towards suppliers - Can improve cost, quality, delivery, and inventory but requires capital, managerial skills, and demand - Risky in industries with rapid technological change
Advantages of PERT/CPM
- Especially useful when scheduling and controlling large projects - Straightforward concept and not mathematically complex - Graphical networks help highlight relationships among project activities - Critical path and slack time analyses help pinpoint activities that need to be closely watched - Project documentation and graphics point out who is responsible for various activities - Applicable to a wide variety of projects - Useful in monitoring not only schedules but costs as well
Communications
- Interactive TV - e-books via Kindle
Supply Chain Risk
- More reliance on supply chains means more risk - Fewer suppliers increase dependence - Compounded by globalization and logistical complexity - Vendor reliability and quality risks - Political and currency risks
Wholesale/retail trade
- Point-of-sale (POS) terminals - e-commerce - electronic communication between store and supplier - bar-coded data - RFID
Disadvantages of PERT/CPM
- Project activities have to be clearly defined, independent, and stable in their relationships - Precedence relationships must be specified and networked together - Time estimates tend to be subjective and are subject to fudging by managers - There is an inherent danger of too much emphasis being placed on the longest, or critical path
Limitations of PERT/CPM
- Project activities have to be clearly defined, independent, and stable in their relationships - Precedence relationships must be specified and networked together - Time estimates tend to be subjective and are subject to fudging by managers - There is an inherent danger of too much emphasis being placed on the longest, or critical path
Virtual Companies
- Rely on a variety of supplier relationships to provide services on demand - Fluid organizational boundaries that allow the creation of unique enterprises to meet changing market demands - Relationships may be short- or long-term - Exceptionally lean performance, low capital investment, flexibility, and speed
Cost-Time Trade-Offs
- The project is behind schedule - The completion time has been moved forward
Restaurants and foods
- Wireless orders from waiters to kitchen - robot butchering - transponders on cars that track sales at drive-throughs
Utilities and government
- automated one-person garbage trucks - optical mail scanners - flood-warning systems - meters that allow homeowners to control energy usage and costs
Transportation
- automatic toll booths - satellite-directed navigation systems - Wi-Fi in automobiles
Few Suppliers
- buyer forms longer term relationships with fewer suppliers - create value through economies of scale and learning curve improvements - suppliers more willing to participate in JIT programs and contribute design and technological expertise - cost of changing suppliers is huge - trade secrets and other alliances may be at risk
Many Suppliers
- commonly used for commodity (common) products - purchasing is typically based on price - suppliers compete with one another - supplier is responsible for technology, expertise, forecasting, cost, quality, and delivery
Financial services
- debit cards - electronic funds transfer - ATMs - Internet stock trading - online banking via cell phone
factor-weighting technique
- each factor is assigned a weight and a score - the supplier with the best weighted score
Hotels
- electronic check-in/check-out - electronic key/lock systems - mobile Web bookings
Importance of Project Management
- international workforce, construction professionals, cooks, medical personnel, security - strategic value of time-based competition - quality mandate for continual improvement
Importance of Project Management
- international workforce, construction professionals, cooks, medical personnel, security - strategic value of time-based competition - quality mandate for continual improvement Ex.Bechtel Project Management
critical path
- longest path through the network - shortest time in which the project can be completed - any delay delays the whole project - has no slack time
Six Sourcing Strategies
- many suppliers - few suppliers - vertical integration - joint ventures - keiretsu networks - virtual companies
Education
- online newspapers and journals - interactive assignments via WebCT - Blackboard - smartphones
Health care
- online patient-monitoring systems - online medical information systems - robotic surgery
Service attributes
- reliability - responsiveness - assurance - empathy - tangibles
The Supply Chain's Strategic Importance
- the coordination of all supply chain activities, starting with raw materials and ending with a satisfied customer - includes suppliers, manufacturers and/or service providers, distributors, wholesalers, retailers, and final customers
Airlines
- ticketless travel - scheduling - internet purchases - boarding passes downloaded as two-dimensional bar codes on smart phones
Outsourcing
- transfer traditional internal activities and resources to outside vendors - efficiency in specialization - focus on core competencies
The Perpetual (Continuous) Review System versus the Periodic Review System
-A Continuous Review System is costly to conduct but requires less safety stock -The Periodic Review System, which reviews physical inventory at specific points in time but requires higher level of safety stock
Decision Tree
-A schematic representation of the available alternatives and their possible consequences -Useful for analyzing sequential decisions
Characteristics of decisions that are suitable for using decision theory:
-A set of possible future conditions that will have a bearing on the results of the decision (interest rates, demand) -A list of alternatives from which to choose -A known payoff for each alternative under each possible future condition
Revenue function
-Begins at the origin and proceeds upward to the right, increasing by the selling price of each unit - Where the revenue function crosses the total cost line is the break-even point
3 General Environment Categories:
-Certainty -Risk -Uncertainty
Decision Criteria
-Maximin Choose the alternative with the best of the worst possible payoffs -Maximax Choose the alternative with the best possible payoff -Laplace Choose the alternative with the best average payoff -Minimax regret Choose the alternative that has the least of the worst regrets
LP Model Components:
-Objective Function -Decision Variables -Constraints -Parameters
Forecasting time horizons
-Short-range forecast Up to 1 year, generally less than 3 months Purchasing, job scheduling, workforce levels, job assignments, production levels -Medium-range forecast 3 months to 3 years Sales and production planning, budgeting -Long-range forecast 3+ years New product planning, facility location, research and development
Uses of LP Models
-Staff Scheduling -Product Mix -Transportation and Distribution Networks (routing) -Financial Portfolios
Cost for quality mistakes
-future sales can be damaged
Non-binding constraints
-have shadow price values that are equal to zero -have slack (≤ constraint) or surplus (≥ constraint) -Changing the RHS value of a non-binding constraint (over its range of feasibility) will have no effect on the optimal solution
Binding constraint
-have shadow price values that are non-zero -have no slack (≤ constraint) or surplus (≥ constraint) -Changing the RHS value of a binding constraint will lead to a change in the optimal decision values and to a change in the value of the objective function
Economic Manufacturing Quantity (EMQ) or Production Order Quantity (POQ)
-relaxes the instantaneous replenishment assumption by allowing usage or partial delivery during production
Radio Frequency Identification (RFID)
-successor to the barcode
Effective Inventory Management Requires:
1)A system to keep track of inventory 2)A reliable forecast of demand 3)Knowledge of lead time and lead time variability 4)Reasonable estimates of holding costs ordering (set-up) costs shortage costs 5)A classification system for inventory items
Three basic production strategies for Aggregate Production Plan:
1)Chase production strategy 2)Level production strategy 3)Mixed production strategy
Model Formulation:
1)List and define the decision variables 2)State the objective function 3)List the constraints 4)Non-negativity constraints
The amount of safety stock that is appropriate for a given situation depends upon:
1)The average demand rate and average lead time 2)Demand and lead time variability 3)The desired service level
A items (very important)
20 percent of the number of items in inventory and about 60 to 80 percent of the annual dollar value
How to build a Lean Organization (not easy)
1. Build a culture of continuous improvement 2. Eliminate Waste 3. Open communication demonstrated, respect for people, empowered employees 4. Collaborative partnerships with suppliers
Implications of Quality
1. Company rep 2. Product liability 3. Global Implications
7 concepts of TQM
1. Continuous improvement 2. six sigma 3. employee empowerment 4. benchmarking 5. JIT 6. Taguchi concepts 7. knowledge of TQM tools
Six Steps PERT and CPM
1. Define project and prepare 2. Develop relationships among activities 3. Draw and Network connecting activities 4. Assign time and/or cost estimates 5. Compute longest time path (critical path) 6. Use network to help plan, schedule, monitor, and control the project
JIT Principles
1. Eliminate Waste 2. Worker Involvement (in quality and in process improvement) 3. Reduce set up time (increases flexibility)
Process analysis and design tools
1. Identify Opportunities 2. Define the scope 3. Document the process 4. Evaluate performance 5. Redesign the Process 6. Implement changes
Theory of constraints
1. Identify the constraints 2. Develop a plan for overcoming the constraints 3. Focus on resources on accomplishing Step 2 4. Reduce the effects of constraints by offloading work or expanding capability 5. Once overcome, go back to step 1 and find new constraints
Pull (push vs pull)
1. JIT 2. Production occurs in reaction to DEMANDS THAT HAVE ALREADY HAPPENED 3. Japanese way
Push (push vs pull)
1. MRP 2. Production occurs based on FORECASTS OF FUTURE demands 3. traditional way
Sources of variability
1. Poor processes resulting in improper quantities, late, or non-conforming units, inadequate maintenance 2. Unknown and changing customer demands, supplier factors, etc.
What do lean organizations do?
1. Understand the customer & expectations 2. Communicate and collaborate to make sure customer expectations are met 3. Implement the tools of lean in the organization
The Four Process Strategies
1. Process focus 2. Repetitive focus 3. Product focus 4. Mass customization
Ways to reduce waste & keep an efficient workplace
1. Sort/segregate 2. simplify/straighten 3. Shine/sweep 4. Standardize 5. Sustain/self-discipline
Lean Inventory Tactics
1. Use a pull system to move inventory 2. Reduce lot sizes (reduce setup time) 3. Develop JIT delivery systems with supplies 4. Deliver directly to point of use 5. use group technology 6. Remove quality problems 7. Scheduled maintenance
TQM Concepts- Employee Empowerment techniques
1. build communication networks that include employees 2. develop open, supportive supervisors 3. move responsibility to employees 4. build a high moral organization 5. create formal team structures
What is quality?
1. high performance or luxury product 2. conforms to specifications 3. conforms to customers needs
The flow of activities
1. organization practices 2. quality principles 3. employee fulfillment 4. customer satisfaction
The 4 classes of quality associated costs
1. prevention costs 2. appraisal costs 3. Internal failure costs 4. external failure costs
Four process strategies
1. process 2.Repetitive 3.Product 4.Mass customization
Key concepts of total quality management
1. quality as part of strategic planning 2. focus on internal and external customer satisfaction 3. effective collection and use of info 4. HR: teamwork, training and empowerment 5. effective design of products and processes 6. leadership: top management drive TQM
TQM Concepts- 6 sigma concepts
1. quality is delivering what the customer wants 2. customers perception of quality is not just driven by the avg quality by the variation in quality each time the customer interacts with the company 3. customers value consisten predictable interactions 4. processes need to be designed to minimize variability
Two ways quality improves profit
1. reduced costs via increased productivity, lower network and scrap costs, and lower warranty costs 2. sales gains via improves response, flexible pricing, improved reputation
____ of the land is suitable for farming
12%
_____ of japan is inhabitable/mountainous
73%
O.F. Coefficient Changes
A change in the value of an O.F. coefficient can cause a change in the optimal solution of a problem -not every change will result in a changed solution
Decision Analysis
A general approach to decision making that is suitable to a wide range of operations management decisions such as: -capacity planning -product and service design -equipment selection -location planning
A
A lawnmower assembly plant uses a variety of nuts, bolts, screws and other fasteners in its operation. Its supplier delivers these items directly to the point of use on the assembly line and ensures that there are always sufficient quantities of fasteners to maintain the production schedule. This is an example of which kind of? A. vendor managed inventory B. lost size reduction B. accurate pull data D. blanket ordering
Objective function
A mathematical statement of profit (or cost) for a given solution or other metric of measurement (ex. time)
C
A successful quality strategy begins with: A. satisfying customers and obtaining a competitive advantage. B. engaging employees in the necessary activities to implement quality. C. an organizational culture that fosters quality. D. an understanding of the principles of quality.
A
A supply chain ends with A. a satisfied customer B. suppliers C. distributors D. manufacturers
Which one of the following technologies is used only for material handling, not actual production or assembly?
AGV - technology is used only for material handling, not actual production or assembly. Automated guided vehicles (AGVs) are used specifically to move and handle materials during the production process.
"Automatic placement and withdrawal of parts and products into and from designated places in a warehouse" describes __________ technologies.
ASRS - ASRS (Automated Storage and Retrieval System) systems are useful because they reduce the amount of human labor involved in warehousing and storing inventory by relying on computer controlled storage and transport systems.
D
All of the following are four major categories of costs of quality except: A. Prevention Costs B. Internal/External Failure Costs C. Appraisal Costs D. none of the above
B
All of the following are included in Shingo and Ohno's 7 Wasted except: A. waste of motion B. waste of employee use C. waste of overproduction D. waste of waiting
D
All of the following are statutes of the central limit theorem except: A. regardless of the distribution of the population, the distribution of the mean of a sample will tend to follow a normal curve as the number of samples increases B. the mean of the distribution of samples will equal will equal the mean of the overall population C. the standard deviation of the sampling distribution will be the population standard deviation divided by the square root of the sample size D. none of the above
A
All of the following are three of the main types of quality except. A. customer based B. manufacturing based C. product based D. none of the above
B
All of the following are tools of Six Sigma except: A. check sheets B. total quality management C. histograms D. none of the above
Shadow Price
Amount by which the value of the objective function would change with a one-unit change in the RHS value of a constraint
Decision Variables
Amounts of either inputs or outputs
Total Cost=
Annual Holding Cost + Annual Ordering Cost
Total Annual Inventory Costs=
Annual Purchase Cost+Annual Holding Cost+Annual Order Cost
C
Anything that doesn't add value to the product or customer is referred to as: A. value B. quality C. waste D. unnceccessary
Sensitivity Analysis
Assessing the impact of potential changes to the numerical values of an LP model Three types of changes: -Objective function coefficients -Right-hand values of constraints -Constraint coefficients
Core competencies
COMPETITIVE ADVANTAGE A factor that a business see's as a key to their success.
The Beta distribution is used in project management to
Calculate expected activity times
Capacity and Strategy
Capacity decisions impact all 10 decisions of operations management as well as other functional areas of the organization Capacity decisions must be integrated into the organization's mission and strategy
D
Choosing products and services that can be advantageously obtained externally as opposed to produced internally is known as: A. outsourcing B. make-or-break decision C. supply chain management D. make-or-buy decision
ABC Classification System
Classifying inventory according to some measure of importance, and allocating control efforts accordingly in terms of A, B, and C items; A being the most important
Assumptions about the Breakeven analysis
Cost and revenue are linear functions.. FALSE We actually know these costs ... FALSE they are difficult to verify
Which of these statements regarding time-cost tradeoffs in CPM networks is true?
Crashing shortens the project duration by assigning more resources to one or more of the critical tasks.
In order to have low inventory you need to
Create very high quality products which means you are producing right the first time with no mistakes
Decision Making Under Uncertainty
Decisions are sometimes made under complete uncertainty: No information is available on how likely the various states of nature are.
Selection of Equipment
Decisions can be complex as alternate methods may be available Important factors may be - Cost - Cash flow - Market stability - Quality - Capacity - Flexibility
Dependent Demand
Describes the internal demand for parts based on the demand of the final product in which the parts are used. Subassemblies, components, & raw materials are examples of dependent demand items
Excess Cost
Difference between purchase cost and salvage value of items left over at the end of the period =Cost per unit - Salvage value per unit
Collectivist Culture
work comes first; sacrifice life for your work; ex. Japan
Which of the following is determined during the forward pass?
Early Start
Risk
Environment in which certain future events have probable outcomes
Uncertainty
Environment in which it is impossible to assess the likelihood of various future events
Certainty
Environment in which relevant parameters have known values
What is Just-In-Time (JIT)
Get only the right PART, to the right PLACE, at the right TIME, and in the right QUANTITY
Service Blueprinting
Identifies potential failure points with the three levels of interaction which each have different management issues
D
If CGS is $19,810 and Inventory is $1,210, what is the inventory turnover? A. 19.32 B. 5.12 C. 16 D. 16.37
C
If CGS is $19,810, Inventory is $1,210, and Total Assets is $17, 590, what is the percent of assets committed to inventory? A. 12% B. 9.63% C. 6.88% D. 7.25%
Economies of Scale
If output rate is less than the optimal level, increasing the output rate results in decreasing average per unit costs -Reasons for economies of scale: Fixed costs are spread over a larger number of units, construction costs increase at a decreasing rate as facility size increases, processing costs decrease due to standardization
Diseconomies of Scale
If the output rate is more than the optimal level, increasing the output rate results in increasing average per unit costs Reasons for diseconomies of scale: Distribution costs increase due to traffic congestion and shipping, complexity increases costs, Inflexibility can be an issue, additional levels of bureaucracy, overtime costs
Selection of Equipment
Important factors may be - Cost - Cash flow - Market stability - Quality - Capacity - Flexibility
Demand Forecasts
Inventories are necessary to satisfy customer demand, so it is important to have a reliable estimates of the amount and timing of demand
C
JIT systems do all of the following except: A. improves quality B. cuts costs C. increases inventory D. none of the above
Constraints
Limitations that restrict the available alternatives
3 time horizons
Long-range planning, Intermediate range planning (aggregate planning), and Short-range planning (scheduling)
Which of the following is not a strategy for improving service productivity?
Mass customization
Which of the quadrants in the service process matrix has high labor intensity and low customization?
Mass service - The mass service quadrant in the service process matrix has high labor intensity and low customization.
LP Models
Mathematical representations of constrained optimization problems
Reduce Waste- Simplify/Straighten
Methods analysis tools
Single-Period Model
Model for ordering perishables and other items with limited useful lives -The goal of the single-period model is to identify the order quantity that will minimize the long-run excess and shortage costs
Project organization
Most helpful when: - work can be defined with a specific goal and deadline - the job is unique or somewhat unfamiliar to the existing organization - the work contains complex interrelated tasks requiring specialized skills - the project is temporary but critical to the organization - the project cuts across organizational lines
Nonnegativity
Negative values of decision variables are unacceptable
PERT and CPM
Network techniques developed in the 1950's -CPM by DuPont for chemical plants (1957) - PERT by Booz, Allan &Hamilton for US Navy Polaris Missile
Is JIT right for every business?
No, but all businesses can learn from the JIt principles
Divisibility
Noninteger values of decision variables are acceptable
Parameters
Numerical constants
Which of the following statements regarding PERT analysis is true?
Only critical activities contribute to the project variances.
Fixed-order-interval (FOI) model
Orders are placed at fixed time intervals -Reasons for using the FOI model: Supplier's policy may encourage its use, Grouping orders from the same supplier can produce savings in shipping costs, Some circumstances do not lend themselves to continuously monitoring inventory position
Importance of Project Management
Organizing activities so specific tasks can be completed. At the highest levels of an organization, management often involves juggling a portfolio of projects.
The three phases involved in the management of large projects are:
Planning, scheduling, and controlling
Determining the Project Schedule
Perform a critical path analysis
Periodic System
Physical count of items in inventory made at periodic intervals
This type of process-analysis tool is a schematic of the movement of material, product, or people.
Process mapping - The process mapping process-analysis tool is a schematic of the movement of material, product, or people. Process mapping, or time-function mapping, is a particular type of flowchart that adds time intervals to the horizontal axis. This helps managers identify redundant work processes, extra steps, or potential issues that could lead to production delays.
Low-volume, high-variety production is best suited for which of the following process strategies?
Process-focused - Process-focused strategies are implemented when businesses would benefit from organizing production and equipment around specific production activities (such as product design, welding, assembly, etc.). Process-focused operations allow for a high degree of flexibility and customization because products can move intermittently between processes.
High-volume, low-variety production is best suited for which of the following process strategies?
Product-focused - Product-focused production facilities are organized around the finished product (such as light bulbs, toilet paper, or potato chips). In order for a firm to effectively use this option, it must operate with high levels of standardization and quality control.
Which of the following transformations generally has the highest equipment utilization?
Product-focused process
B
Products that can be produced uniformly and consistently in adverse manufacturing and environmental conditions are said to be: A. target oriented quality B. quality robust C. quality strong D. none of the above
Which of the quadrants in the service process matrix has high labor intensity and high customization?
Professional service
Deriving EOQ
Q= sqroot[(2DS)/H]
Project Planning
Relate people, money and supplies to specific activities and activities to each other.
Additional S's- Support/Maintenance
Reduce variability and unplanned downtime
Reduce Waste- Sustain/Self-discipline
Review work and recognize the process
Reduce Waste- Standardize
Remove variations from the process
Which of the following industries is most likely to have low equipment utilization?
Restaurants
Two additional S's of reducing waste
Safety & support/maintenance
Of the five tools used for process analysis and design, which one focuses on the customer interaction?
Service blueprinting - service blueprinting focuses on the customer interaction. Service blueprinting is a process-analysis technique that examines the interaction between the service provider and the customer.
Service Capacity
Service capacity planning can present a number of challenges related to: -The need to be near customers (Convenience) -The inability to store services Cannot store services for consumption later -The degree of demand volatility Volume and timing of demand Time required to service individual customers
The EF of an activity is the:
The EF of an activity is the ES + Activity time. EF, or early finish, is the earliest an activity can be completed and is determined by identifying the early start time (ES) and adding in the amount of time it will take to complete the activity (Activity Time).
B
The advantage of having few suppliers is to: A. look for short-term attributes B. form a long-term relationship C. take advantage of dis-economies of scale D. pursue low cost
Effective Capacity
The capacity a firm expects to achieve given current operating constraints
Independent Demand
The demand for final products & has a demand pattern affected by trends, seasonal patterns, & general market conditions
Linearity
The impact of decision variables is linear in constraints and in the objective function
Design capacity
The maximum theoretical output of a system
C
The objective of a statistical process control (SPC) system is to A. provide a statistical signal when natural causes of variation are present. B. eliminate natural variations C. provide a statistical signal when assignable causes of variation are present. D. assess customer expectations
Distribution Management
The outbound flow of products
Service Level
The probability that demand will not exceed supply during lead time Service level = 100% - Stockout risk
A
The process of ensuring that the natural variation of the process must be small enough to produce products that meet the standard is known as: A. process capability B. statistical process control C. cross sourcing D. resizing
A
The processes for sending returned products back up the supply chain for resale, repair, reuse, remanufacture, recycling, or disposal is known as: A. reverse logistics B. closed-loop logistics C. inventory turnover D. none of the above
Range of Optimality
The range of O.F. coefficient values for which the optimal values of the decision variables will not change
PERT analysis computes the variance of the total project completion time as:
The sum of the variances of all activities on the critical path.
Capacity
The throughout, or the number of units a facility can hold, receive or store -determines fixed cost and if demand will be satisfied
A simple CPM network has five activities, A, B, C, D, and E. A is an immediate predecessor of C and of D. B is also an immediate predecessor of C and of D. C and D are both immediate predecessors of E. Given the above scenario, which of the following is correct?
There are four paths in this network.
What is the point of lean inventory tactics
There will be no inventory or problems
B
Transferring a firm's activities that have traditionally been internal to external suppliers is known as: A. make-or-buy B. outsourcing C. keiretsu network D. vertical integration
Certainty
Values of parameters are known and constant
C
What is the first stage in the supplier selection process? A. negotiations B. contracting C. supplier evaluation D. supplier development
A
What is the objective of supply chain management? A. to structure the supply chain to maximize its competitive advantage and benefits to the ultimate consumer B. to encourage everyone in the supply chain to reduce their costs C. to implement a JIT system that brings supplies directly to the customer at low costs D. to aim for multiple suppliers as opposed to fewer suppliers
C
What is the purpose of logistics management? A. to obtain quality in the manner of production and shipping B. to secure a strong POS system that allows a firm to gather much needed data C. to obtain efficiency of operations through the integration of all material acquisition, movement, and storage activities D. to obtain efficiency of operations through the integration storage activities only
Reduce Waste- Sort/Segregate
When in doubt, throw it out
D
Which of the following could reduce costs and increase profit? A. JIT B. using p-charts C. increasing production D. A and C
D
Which chart tells us that a gain or loss in dispersion has occurred? A. p chart B. c chart C. x chart D. R chart
A
Which chart tells us whether changes have occurred in the central tendency of a process? A. x chart B. histogram chart C. R chart D. p chart
B
Which model is used to identify, measure, reorganize, and improve supply chain processes? A. SERVQUAL B. SCOR C. JIT D. all of the above
B
Which negotiation strategy bases price on a published, auction, or index price? A. cost based B. market based C. competitive bidding D. none of the above
A
Which of the following DOES NOT increase profit by improving quality? A. higher warranty costs B. increased productivity C. flexible pricing D. none of the above
C
Which of the following TQM tools would be best suited for displaying the number of students majoring in each business discipline? A. check sheets B. p-charts C. histograms D. flow charts
D
Which of the following are issues with developing an efficient integrated supply chain? A. global optimization B. small lots C. low costs D. none of the above
D
Which of the following are services of warehouses? A. break-bulk function B. consolidation point C. cross docking facility D. all of the above
D
Which of the following are sourcing strategies used by firms? A. vertical integration B. virtual companies C. many suppliers D. all of the above
D
Which of the following costs is NOT a cost of quality? A. appraisal costs B. internal failure costs C. prevention costs D. research and development
B
With regard to the cost-based price model negotiation strategy, which of the following is true? A. Potential suppliers each submit quotations as to price, delivery, and so on. B. Prices are based upon supplier costs. C. Prices are based in some way upon market standards agreed to by both supplier and purchaser. D. Prices float based on what the customer is willing to pay.
WBS stands for which of the following project management tools?
Work Breakdown Structure
C
__________ is a widely used instrument that provides direct comparisons between customer service expectations and the actual service provided. A. LEARN Routine B. SPC C. SERVQUAL D. Poka-Yoke
C
____________ is the Japanese word used to describe the ongoing process of unending improvement. A. Kizen B. Kazen C. Kaizen D. Kaizin
D
_____________ is the ability of a process to meet design specifications, which are set by engineering design or customer requirements. A. process control B. statistical process control C. JIT D. none of the above
C
______________ is a foolproof device or technique that ensures production of good units every time. A. SPC B. JIT C. Poka-Yoke D. Kaizen
C
______________ is a method of measuring random samples of lots or batches of products against predetermined standards. A. random sampling B. JIT sampling C. acceptance sampling D. lean sampling
B
______________ is a tool used to help identify the kind of abnormalities in a process. A. Poka-Yoke B. run test C. SPC D. process capability
A
______________ is known as any deviation from the optimum process. A. variance B. difference C. optimal error D. standards of deviation
B
_______________ is a concept that results in material being produced only when requested and moved to where it is needed just as it is needed. A. put system B. pull system C. thrust system D. push system
B
_______________ is known as variability that affects every productions process to some degree and is to be expected, also known as common cause. A. assignable variation B. natural variation C. expected variance D. optimal variation
A
________________ Involves selecting a demonstrated standard that represents the very best performance for processes or activities very similar to your own. A. benchmarking B. quality checks C. histogramming D. JIT operations
C
________________ is a hybrid technique where two suppliers each provide a different component, but they have the capability of producing each other's component. A. many suppliers B. outsourcing C. cross-sourcing D. optimization
A
________________ is the number of times inventory is sold or used in a time period. A. inventory turnover B. turnover rate C. inventory status D. none of the above
A
________________ moves parts through production via a pull from a signal. A. kanban B. kaizen C. Poka-yoke D. none of the above
B
_________________ sets and enforces product standards by banning products that don't reach quality standards. A. User Product Safety Act B. Consumer Product Safety Act C. Producer's Risk D. Quality Assurance Act
D
__________________ is defined as the totality of features and characteristics of a product or service that bears on its ability to satisfy stated or implied needs. A. JIT B. Lean Operations C. Kaizen D. Quality
A
__________________ is variation in a production process that can be traced to specific causes. A. assignable variation B. natural variation C. expected variance D. optimal variation
B
___________________ is developing the ability to produce goods or services previously purchased or to actually buy a supplier or a distributor. A. backward integration B. vertical integration C. forward integration D. horizontal integration
C
___________________ refers to the proactive design of a supply chain that tries to optimize all forward and reverse flows. A. reverse logistics B. weeks of supply C. closed-loop supply chain D. open-loop supply chain
Legacy MRP system
a broad label used to describe an older information system that usually works at an operational level to schedule production within an organization
R-Chart
a chart that is used to track sample ranges, or the variation of the measurements within each sample
P-chart
a chart that monitors the percent defective in each sample
Sustainability
a commitment to environmental responsibility
Continuous Review System
a continuous review of physical inventory to make sure orders are initiated when physical inventories reach their reorder points -very costly and difficult to achieve
X-chart
a control chart that tracks the central tendency of the sample means for variable data
Variable cost
a cost that varies with volume of units produced
Sustainable Development
a development that meets the needs of the present without compromising the ability of future generations to meet their own needs
A system using an automated work cell controlled by electronic signals from a common centralized computer facility is called __________.
a flexible manufacturing system - Flexible manufacturing systems use centralized computer systems to automate portions of the production process.
Sales-force composite
a forecast in which field sales personnel are asked to estimate their customers' purchases for the period in question
Resource Requirement Planning (RRP)
a long-range capacity planning module, checks whether aggregate resources are capable of satisfying the aggregate production. Resources considered include gross labor hours & machine hours
Fishbone Chart
a method that can be used to aid in brainstorming and isolating the causes of a problem
Control charts
a method that monitors process variability and then collects and plots sample measurement of the process over time
Green purchasing
a practice aimed at ensuring that purchasing personnel include environmental considerations and human health issues when making purchasing decisions
Lead Capacity Strategy
a proactive approach that adds or subtracts capacity in anticipation of future market condition and demand
Fair trade products
a product manufactured or grown by a disadvantaged producer in a developing country that receives a fair price for its goods
Delphi method
a qualitative forecasting method in which a group of experts are surveyed during several rounds to gain consensus on future events. Because the group members do not physically meet, they thus avoid the scenario where one or a few experts could dominate a discussion
Jury of executive opinion
a qualitative forecasting method in which a group of experts collectively develop a forecast
Consumer surveys
a questionnaire that seeks input from customers on important issues such as future buying habits, new product ideas and opinions about existing products
Lag Capacity Strategy
a reactive approach that adjusts capacity in response to demand
Periodic
a review of inventory at specific points in time
price fluctuations
buying in advance of demand to take advantage of low prices, discounts, or sales
Drop shipping and special packaging
bypasses the seller and reduces costs
Forward vertical integrations
acquiring downstream customers
Backward vertical integration
acquiring upstream suppliers
How purchasing contributes to these goals
actively seeking better materials and reliable suppliers, work closely with and exploiting the expertise of strategic suppliers to improve quality and materials, involving suppliers and purchasing personnel in new product design and development efforts
Tracking capacity strategy
adds capacity in relatively small increments to keep pace with increasing demand
Chase strategy
adjust capacity to match demand
Customer Satisfaction
an effective organization with a competitive advantage (winning orders, repeat customers)
A job shop is an example of __________.
an intermittent process - The term intermittent process is used because these facilities are designed to handle low-volume/high-variety production runs with frequent changes based on customer orders. Thus, each job is essentially a different product line.
Perpetual (Continuous)
an inventory management system where the physical inventory levels are counted on a daily basis
Variability
any deviation from optimum process
Waste
anything that doesn't add value ego a product or customer
Dummy activities__________
are used when two activities have identical starting and ending events.
Project manager responsibilities
assigned by the performing organization to lead the team that is responsible for achieving the project objectives
Once the supply chain partner requirements are understood, supply chain members can then
audit their capabilities to see if they are consistent with the needs of the end customers
In a PERT network, non-critical activities that have little slack need to be monitored closely__________
because near-critical paths could become critical paths with small delays in these activities
Reasons to outsource
better quality, cost, technical support and expertise, capacity, volatile demand, gain information on latest trends
Order Costs
direct variable costs associated with placing an order with the supplier
Lead capacity strategy
build capacity in anticipation of future demand increases
Lag capacity strategy
build capacity when demand exceeds current capacity
Assignable variation
can be traced to a specific cause
Local optimization
can magnify fluctuations
Variable Costs
change as a function of the output level
Random variation
changes due to unexpected or unpredictable events such as natural disasters, strikes and wars
Reduce Waste- Shine/Sweep
clean daily
Product positioned strategy
close to supply source for firm to collect goods and consolidate
Total quality management
commitment by management to have a continuous company wide drive toward excellence in all aspects of products/services that are important to the customer
Four Legal Forms of Transportation
common contract, exempt, and private
Internal Failure Costs
costs associated with fixing poor products quality BEFORE it reaches the customer (rework, scrap, equipment downtime)
External Failure costs
costs associated with product quality problems that occur AFTER it reaches the customer (recall logistical costs, repair costs, brand loyalty, litigation)
Holding (carrying) Costs
costs incurred for holding inventory in storage
Prevention Costs
costs incurred in the process of preventing poor quality (planning, training, design)
Appraisal Costs
costs incurred in the process of uncovering defects (inspections, tests, audits)
Fixed cost
costs that continue even if no units are produced (deprecation, taxes, mortgage payments, rent)
demand forecast errors
cumulative uncertainty in the supply chain
Distribution network performance
customer needs that are met, cost of meeting customer needs
Goal of total quality management
customer satisfaction from continuous improvement of key processes
In the mass service and service factory quadrants of the service process matrix, the operations manager could focus on all of the following except __________.
customization - Customization is a technique that is more common in professional service business models (i.e., orthodontics) and service shops (i.e., heart hospitals or hospitals that specialize in a specific type of service or treatment).
TQM Concepts- 6 sigma method
define, measure, analyze, improve, control
Successful supply chains are those that in the face of ever changing customer needs can continue to
deliver the right combination of cost, quality, and customer service
Independent Demand
demand for final products affected by trends, seasonal patterns, & general market conditions
TQM Concepts- Benchmarking (Steps)
determine benchmark, form team, identify partners, collect/analyze info, take action
channel coordination
determine lot sizes as though the full supply chain was one company
Capacity analysis
determines the throughput capacity of workstations in a system
Super Bill of Materials
enables firm to forecast the total demand of ATVs and then break down the forecast into different models and transmission options using the correct percentage instead of forecasting the demand for each option individually.
TQM Concepts- Taguchi Concepts
engineering and experimental design methods to improve products and process design
Three primary goals of purchasing
ensure uninterrupted flows of raw materials at the lowest total cost, improve quality of the finished goods produced and optimize customer satisfaction
Total quality management encompasses the
entire company organization from supplier to consumer
A problem associated with using costs, revenues, and profits as metrics to gauge performance
environmental, political and/or economic events may skew in these numbers
Mass Customization
ex. Dell Computers - The rapid, low-cost production of goods and service to satisfy increasingly unique customer desires - Combines the flexibility of a process focus with the efficiency of a product focus
Mass Customization
ex. Dell Computers - The rapid, low-cost production of goods and service to satisfy increasingly unique customer desires - Combines the flexibility of a process focus with the efficiency of a product focus -difficult to achieve
Product Focus
ex. Frito-Lay Chips - Facilities are organized by product - High volume but low variety of products - Long, continuous production runs enable efficient processes - Typically high fixed cost but low variable cost - Generally less skilled labor
Process Focus
ex. Hospitals - Facilities are organized around specific activities or processes - General purpose equipment and skilled personnel - High degree of product flexibility - Typically high costs and low equipment utilization - Product flows may vary considerably making planning and scheduling a challenge
Repetitive Focus
ex. Motorcycles - Facilities often organized as assembly lines - Characterized by modules with parts and assemblies made previously - Modules may be combined for many output options - Less flexibility than process-focused facilities but more efficient
Exempt
excused from regulation of services and rates and if they transport certain excused products like produce, livestock, coal or newspapers
Social sustainability
exhibiting long-term concern for worker safety, hourly wages, working conditions, child workers and basic human rights
Capacity Management when demand exceeds available service capacity
firms turn away customers or hire personnel
Supply Chain Management
flow of goods and services, involves the movement and storage of raw materials, of work-in-process inventory, and of finished goods from point of origin to point of consumption. o Outsourcing-Hiring another organization to perform service to save costs, gain expertise, free up management time, & refocus on core competencies o Bullwhip effect-the variability in demand is magnified as we move from the customer to the producer in the supply chain (moving upstream) o Logistics management-Management of the movement and storage of materials at lowest cost while still meeting customer requirements o Six Sigma-a customer focused, well defined problem solving methodology supported by a handful of powerful analytical tools (99.9997% perfection)
Process redesign
focuses on activities that cross functional lines, basic process and its objectives must be reexamined
Service blueprinting __________.
focuses on the provider's interaction with the customer
Inventory Management Models
generally classified as dependent demand and independant demand models
Shortage Cost
generally the unrealized profit per unit =revenue per unit - cost per unit
TQM Concepts- Employee Empowerment
getting employees involved in product and process improvements
Project planning
goal setting, defining the project, team organization
quality circles
group of employees who meet regularly to solve problems (led by a facilitator)
Questions needed to be answer before designing the appropriate product/service to fulfill customer service expectations
how much is the customer willing to pay; what level of variety is required to satisfy the customer; how often will customers place orders and how many units will they want
Quality Principles
how to do what is important and to be accomplished (customer focus, contain improvement, benchmarking, JIT, TQM)
In mass service and professional service, the operations manager should focus on __________.
human resources - In mass service and professional service, the operations manager should focus on human resources. Human resources are particularly important to service firms because of the direct interaction between customers and employees.
Aggregate Production Plan
hierarchical long-range materials planning process that translates annual business plans into production plan for all products -capacity is usually considered fixed during planning horizon
Improving service productivity is challenging due to
high labor content, individual customized services, difficulty of automating services, and problem of assessing service quality
shortage gaming
hoarding supplies for fear of a supply shortage
Stochastic demand
incorporates uncertainty by using probability distributions.
Fixed Costs
independent of the output quantity
Decentralized
individual, local purchasing department; advantages: closer knowledge of requirements, local sourcing, less bureaucracy
Changes in distribution networks affects
inventories, transportation, facilities and handling, information
bottleneck time
is a limiting factor or constraint - slowest workstation time
Static demand
is stable demand.
With respect to PERT and CPM, slack__________
is the amount of time a task may be delayed without changing the overall project completion time.
throughput time
is the time it takes a unit to go through production from start to end
Rough-Cut capacity plan (RCCP)
is used to check the feasiblity of the master production schedule
Deterministic demand
is when uncertainty is not included in its characteristics.
Waste of Inventory
items are not being actively processed
ABC inventory matrix
items based on current inventory should match the items based on annual inventory dollar usage for the specific categorie
Waste of Transportation
items move in between processing centers
order batching
large, infrequent orders leading suppliers to order even larger amounts
Latest start (LS)
latest time at which an activity can start so as to not delay the completion time of the entire project
Latest finish (LF)
latest time by which an activity has to be finished so as to not delay the completion time of the entire project
Dominant companies within a supply chain can use their buying power to
leverage demands for supplier conformance to its supply chain requirements
World class performance measuring systems should
link performance measures between the firm's strategies and operational decisions to customer requirements
The critical path of a network is the__________
longest time path through the network
Reasons not to outsource
loss of control (production decisions and intellectual property), increased reliance on suppliers, increased need for supplier management
Increasing productivity may increase costs due to
lower morale, increase in sick calls, lower customer service and quality
Mixed strategy
maintains stable core workforce while using other short-term means
Quality
o Cost of quality: All costs attributable to the production of quality that is not 100% perfect. -Prevention -Appraisal -External failure -Internal failure o TQM-it provides both a management process for improvement of quality in all aspects of work. o Process control-corrective action during production to ensure that processes meet standards.
Inventory management
o Motives-to achieve a desired level of customer service while keeping inventory costs reasonable o Polices o Safety stock- Extra inventory carried for uncertainties in supply and demand. Buffer stock. o Models- Dependent Demand: internal demand for parts based on the demand of the final product in which the parts are used. Sub-assemblies, components, and raw materials are examples of dependent demand items. Independent demand: The demand for final products and has a demand pattern affected by trends, seasonal patterns, and general market conditions.
Logistics management
obtaining efficient operations through the integration of all material acquisition, movement, and storage
Common
offer transportation services to all shippers at published rates between designated locations without discrimination
Master Requirement Planning (MRP)
once the independent demand of the final product is known or forecasted, the dependent demand item requirements can be exactly calculated using MRP sotfware, along with when the items should be assembles or purchased
Green Development
prioritizes what its proponents consider to be environmental sustainability over economic and cultural considerations
Demand Management
proactive, shape the quantity and timing of demand to meet a company's needs
The use of information technology to monitor and control a physical process is known as __________.
process control
Three types of processes are __________.
process focus, repetitive focus, and product focus
TQM Concepts-6 sigma definition
process focused on delivering near-perfect products
hierarchical planning
process that translates annual business plans, marketing plans, and demand forecasts into a production plan for a product family in a plant or facility leading to the aggregate production plan
Waste of Overproduction
production ahead of demand
Centralized
purchasing department located at the firm's corporate office or centralized location makes all the purchasing decisions; advantages: concentrated volume, leveraging purchase volume, avoid duplication, specialization, lower transportation costs, no competition within business units, common supply base
Incentives
push merchandise into the supply chain for sales that have not occured
the reduces costs and increase in sales increase
quality and profits
TQM Concepts- Taguchi key Concepts
quality robustness, target-oriented quality, quality loss function
World-class performance provides measures in
quality; dependability; innovation
Large lots
reduce shipping and production costs but increase inventory holding and do not reflect actual sales
Lean systems require managers to
reduce variability caused by both internal and external factors
Foreign Trade Zones
secure sits in U.S. under supervision of U.S. customs
Proactive demand management
seeks to actively influence demand (advertising, pricing, product/service modifications), shape the quantity and timing of demand to meet a company's need, generally requires either an explanatory model or a subjective assessment of the influence on demand
TQM Concepts- Benchmarking
selecting best practices to use as a standard for performance
Time-fence system
separates the planning horizon into two segments; a firmed and tentative segment. Firmed stipulates that the production plan or MPS cannot be altered except with authorization of senior management. Tentative Segment typically stretches from the end of the firmed segment to several weeks farther into the future.
Strategies for improving productivity in services are __________.
separation, self-service, automation, and scheduling
Accurate pull data
shared information
Lot size reduction
shipping, discounts, reduced ordering costs
Project crashing
shortening the duration of the project
Time-Function Mapping
shows flows and time frame
Flowchart
shows the movement of materials
Single stage control of replenishment
single supply chain member responsible for ordering
Safety Stock
stock that is held in excess of expected demand due to variable demand and/or lead time -higher the safety stock, the lower the risk of stockout
Distribution
steps taken to move and store a product from the supplier to the customer in the supply chain
Electronic ordering and funds transfer
speed transactions and reduce paperwork
E-procurement
speeds purchasing, reduces costs, integrates supply chain
Lean Operations
systematic method in which a business's goal is to deliver value to customers while improving processes and reducing waste o Waste- anything that doesn't contribute value to the customer 1. Overproduction 2. Waiting/Queues 3. Transportation 4. Overprocessing 5. Excess Inventory 6. Excess Movement 7. Scrap and Rework o JIT- To produce only what is needed, when it is needed o Lean Inventory- reduce cost, improve quality, shorten LT by shortening production flow by eliminating waste
break-even analysis
technique used for evaluating process and equipment alternatives -finds point in units (x) and dollars ($) -requires estimation on fixed costs, variable costs and revenue
Flexibility
the ability to respond with little penalty in time, cost, or customer value
Strategic Procurement
the added activities of specifications development, expediting, supplier quality control and some logistics activities
Why waiting lines cause concern
the cost to provide waiting space, possible loss of business when customers leave the line before being served or refuse to wait at all, a possible loss of good will, a possible reduction in customer satisfaction, resulting congestion may disrupt other business operations and/or customers
Available-to-promise (ATP) quantity
the difference between confirmed customer orders and the quantity the firm planned to produce
Performance variance
the difference between the standard and the actual performance
Process Redesign
the fundamental rethinking of business processes to bring about dramatic improvements in performance
Price Break Point
the minimum quantity required to get a price discount
Ethical sourcing
the practice of purchasing from suppliers that are governed by social and ethical practices
One fundamental difference between a process chart and a process map is that __________.
the process chart is more like a table, while the process map is more like a schematic diagram
Resource Planning
the process of determining the production capacity required to meet demand
Risk Pooling
the relationship between the number of warehouses, inventory and customer service; it can be explained intuitively as follows: when market demand is random, it is very likely that higher-than-average demand from some customers will be offset by lower-than-average demand from other customers
bullwhip effect
the tendency for larger order size fluctuations as orders are relayed through the supply chain
Statistical Reorder Point with Probabilistic Demand and Constant Lead Time
this model assumes the lead time of a product is constant while the demand during the delivery lead time is unknown but can be specified using a normal distribution
Direct Costs
those that are directly traceable to the unit produced, such as the amount of materials and labor used to produce a unit of the finished good.
Process time
time to produce a unit or specified batch size
Value-Stream Mapping (VSM)
value is added in the entire production process, including the supply chain
Managing supply chains difficult
variability and complexity
Commodities (suppliers)
use more to promote competition to lower prices
Medium-range capacity plan, or rough-cut capacity plan (RCCP)
used to check feasibility of MPS. Converts MPS from production needed to capacity required, then compares it to capacity available
Dynamic demand
varies over time.
Reactive demand management
view forecasts as probable future demand, react to meet that demand
In many applications, human quality inspectors can be replaced effectively by __________.
vision systems - Vision systems combine cameras and computer technology to visually inspect products during the manufacturing process.
Market-positioned strategy
warehouses close to customers to maximize distribution services and improve transportation economies of scale
Dashboards
web-based scorecard application
Organizational Practices
what is important and what it to be accomplished (leadership, mission statement, staff support, training)
The Statistical Reorder Point with Probabilistic Demand and Lead Time
when both the demand and lead time of a product are unknown but can be specified by means of a normal distribution, safety stock must be held to cover the variations in demand and lead time.
The Statistical Reorder Point with Constant Demand and Probabilistic Lead Time
when the demand of a product is constant and the lead time is unknown but can be specified by means of normal distribution, safety stock is used as a buffer.
Two key managerial decisions
will the product be delivered to the customer location or picked up from a predetermined site; will the product flow through an intermediary or intermediate location
Postponement
withholds modification as long as possible
Primary Functions of Inventory
- to buffer uncertainty in the marketplace and to decouple, or break the dependencies between stages in the supply chain
Inventory turnover ratio
- a widely used measure to determine how efficiently a firm is using its inventory to generate revenue = Cost of Revenue/Avg Inventory
Quantity Discount Model (Price Break Model)
- price reduction offered to customers for placing larger orders = (Q/2)H+(D/Q)S+PD
Service Industry Inventory
-Airplane Seats -Tour Bus Service -Cruises (Cabins) -Hotels (Rooms) -Hospital Beds
MRP Benefits
-Enables managers to easily determine the quantities of each component for a given order size, to know when to release orders for each component, and to be alerted when items need attention -Additional benefits; Low levels of in-process inventories, the ability to track material requirements, the ability to evaluate capacity requirements, a means of allocating production time
Nature of Demand
-Independent Demand -Dependant Demand -Deterministic Demand -Stochastic Demand -Static Demand -Dynamic Demand
Capacity Strategies
-One Large Capacity Increase -Leading Build capacity in anticipation of future demand increases -Following Build capacity when demand exceeds current capacity -Tracking Similar to the following strategy, but adds capacity in relatively small increments to keep pace with increasing demand
Enterprise Resource Planning Systems Implementation Failures
-Outlining Specifications and Company Needs-current and future -Lack of top management commitment -Lack of adequate resources-project management -Lack of proper training -Lack of communication -Incompatible system environment
Inventory Counting Systems
-Periodic System -Perpetual Inventory System
Inventory Management Four + 1 broad categories:
-Raw Materials -Work-in-process -Finished goods -Maintenance, repair, and operating (MRO) + -Goods-in-transit
Inventory Counting Technologies
-Universal product code (UPC) -Radio frequency identification (RFID) tags -Point-of-sale (POS) systems A system that electronically records actual sales Such demand information is very useful for enhancing forecasting and inventory management -Physically Count It
Reorder Point
-When the quantity on hand of an item drops to this amount, the item is reordered. Determinants of the reorder point: -The rate of demand -The lead time -The extent of demand and/or lead time variability -The degree of stockout risk acceptable to management
Material Requirements Planning (MRP)
-a computer based materials management system that calculates the exact quantities, need dates, and planned order releases for subassemblies and materials required to manufacture a final product -requires independent demand info, parent-company relationships from the BOM, inventory status of final product and components -is designed to answer three questions: 1)What is needed? 2)How much is needed? 3)When is it needed?
Chase Production Strategy
-adjusts capacity to match the demand pattern;firm hires and lays off workers to match its production rate to demand. -works well with make-to-order manufacturing firms Advantages: investment in inventory is low and labor utilization is high Disadvantages: the cost of adjusting output rates and/or workforce levels, low employee moral
Manufacturing Resource Planning
-aggregate production plan -master production schedule -material requirements plan -capacity requirements plan
Implementing Enterprise Resource Planning Systems
-best-of-breed solution- picks the best application or module for each individual function in the supply chain;results in several different applications that must be integrated to work as a single coordinated system -single integrator approach picks all the desired applications from a single vendor for the ERP system
Level Production Strategy
-relies on a constant output rate and capacity while varying inventory and backlog levels to handle the fluctuating demand pattern -keeps workforce levels constant and more suitable for firms that require highly skilled labor Advantages:stable output rates and workforce Disadvantages:greater inventory costs, increased overtime and idle time, and resource utilizations vary over time
Mixed Production Strategy
-strives to maintain stable workforce while using other short-term means such as overtime, subcontracting, or hiring part time and temporary workers during periods of fluctuating demand
Disadvantages of Enterprise Resource Planning
-substancial capital investment is needed to purchase and implement the system -considerable time and money must be set to the side to train employees -adopting firm must restructure its processes to be compatible with the new ERP system
Manufacturing Resource Planning (MRP-II)
-the developed version of MRP, it syncronizes an organizations information systems and provides insight into the implications of aggregate production plans, master production schedules, capacities, materials plans and sales, and primarily focuses on one units internal operations
Master Production Schedule (MPS)
-the heart of production planning and control, it determines the quantity needed to meet demand from all sources -time phased, detailed disaggregation of the aggregate production plan, listing the exact end items to be produced by a specific period -may be the "appointment log" where capacity is balanced with demand -planning horizon is shorter than APP but longer than lead time to produce the item
Advantages of Enterprise Resource Planning Systems
-uses single database -common software infrastructure provides real time info -helps reduce supply chain inventories due to added visability -reductions of the bull-whip effect
Inventory Managements 2 basic Funtions
1)Establish a system for tracking items in inventory 2)Make decisions regarding... When to order? How much to order?
Master Production Scheduling
Inputs: beginning inventory, forecast, customer orders Outputs: projected inventory, master production schedule, uncommitted inventory
Perpetual Inventory System
System that keeps track of removals from inventory continuously, thus monitoring current levels of each item
Dependent Demand
the internal demand for parts based on the demand of the final product in which the parts are used (subassemblies)
Bill of Materials (BOM)
document that shows an inclusive listing of all component parts and assemblies making up the final product
Dependant demand
is demand directly related to the demand for other items and can be calculated without needing to be forecast.
Independent demand
is demand for an item that is unrelated to the demand for other items and needs to be forecast.
Periodic Review System
physical inventory is reviewed at regular intervals, such as weekly or monthly -lowered costs -higher level of safety stock required
Operations Planning
planning that efficiently balances production plans with capacity and production is planned to meet customer demands -is usually hierarchical, divided into three broad categories; 1)Long-range 2)Intermediate or Medium Range 3)Short-range planning horizons
Enterprise Resource Planning System
the concept of the manufacturing information system thus evolved to directly connect all functional areas and operations of an organization and, in some cases, its suppliers and customers via a common software infrastructure and database. -enables an organization to deal directly with key suppliers to asses the availability of their resources, as if an extended member of the firm -integrates the internal operations of an enterprise with a common software platform and centralized database system
Indirect Costs
those that cannot be traced directly to the unit produced and they are synonymous with manufacturing overhead
Distribution Requirements Planning (DRP)
time-phased finished-goods inventory replenishment plan in a distribution network -a logical extension of the MRP system -ties the physical distribution system to the manufacturing planning and control system by determining the aggregate time-phased net requirements of the finished goods, and provides demand information for adjusting the MPS.
geographical specialization
to manufacture their products in the developing countries specializing in cheap labor and abundant raw materials, where manufacturing firms provide the technology and capital to produce the goods
Economic Order Quantity (EOQ) Model
used to find a fixed order quantity, a classic independent demand inventory system that provides many useful ordering decisions; determines optimal order size that minimizes total annual inventory costs
Cycle Counting
used to reconcile discrepancies between physical inventory and inventory record on a monthly or quarterly basis -helps identify obsolete stocks and inventory problems
Short-range plans
usually cover a few days to a few weeks depending on the firm -usually most detailed and specify the exact end items and quantities to make on weekly, daily, or hourly basis.
Long-range plans
usually cover a year or more, tend to be more general, and specify resources and outputs in terms of aggregate hours and units. -usually established first to guide the medium-range, which then guides the short-range plans -usually involve major strategic decisions in capacity ex. construction of new facility