Green Book Final

Pataasin ang iyong marka sa homework at exams ngayon gamit ang Quizwiz!

the following products are not examples of a flow fixture

toilets and urinals

The following project type is applicable to the LEED for New Construction and Major renovations rating system

Government building

The following represents the major factors that impact transportation effects on the environment

vehicle technology, fuel, human behavior

the following best describes the LEED strategy applicable to ASHRAE standard 62.1

ventilation and indoor air quality

which of the following are examples of unoccupied spaces?

mechanical rooms, stairway, data center floor area

one demand reduction strategy is

sizing the building appropriately

the following avoids environmental harms from the supply chain through to end of life?

source reduction

the following are categorized as regulated energy

space heating, service hot water, lighting

the following should be considered to promote good lighting design

surface colors within the space, furnishings

the following strategies have proven to increase productivity and occupant satisfaction in green buildings

providing access to daylight, improving indoor airquality

the following are LEED concepts that are most significantly influced by site selection prior to design of the project

public transportation access, brownfield redevelopment

A vegetated roof system is using native and adapted plant species has the opportunity to contribute to earning which three strategies

rainwater management, heat island effect, restore habitat

the following is not true concerning locally adapted plants

require more water

Credit interpretation rulings provide which of the following

responses to written requests for interpretation of credit requirements clarification of one existing LEED credit or prerequisite

the following are strategies to reduce the demand of new materials

reuse existing buildings, design denser, mixed-use neighrborhoods

When should the OPR be prepared

schematic design

the following greenhouse gases is a by-product of landfills

methane

the most common way to divert waste from land fills

recycling

the following is consistent with the range of MERV filter ratings

1-16

The following meets the MPR regarding minimum gross floor area for LEED Existing Buildings: Operations and Maintenance

1000 sq ft

what is the value of brick pavers with 32 percent preconsumer content, that were processed 87 miles and manufactured 99 away from a project site

200 percent

How long does a project team have to submit an appeal after receiving cert review comments back from GBCI?

25 days

How many MPRs existing the LEED V4 building cert program

3

Transportation accounted for ____ percent of total US greenhouse gas emissions in 2008 and ____ percent of total carbon dioxide emissions globally

33 and 13.5

the following most closely represents an appropriate level of overall illumination on an office work surface, including daylighting, ambient artificial lighting, and task lighting

40-60 footcandles

How many types of credientials for LEEP AP with Specialty are available?

5

what is the overall average ENERGY STAR portfolio manager score of LEED-certified buildings according to the New Buildings Institute

68

How much time on average do Americans spend indoors?

90%

to which standard should engineers design the ventilation systems

ASHRAE 62.1

Charrettes have...

An agenda and clear goals are needed. A strong facilitator needs to be flexible and have good listening skills

the following are standards for indoor air quality

CRI Green Label Plus, Green Seal

the following are effective and sustainable strategies to address transportation for a LEED project

Choose a site near a bus stop limit parking encourage carpooling

What should a LEED project enhance?

Community and Human Health

The best time to incorporate an integrative design and approach is...

During schematic design

the design team has attempted to address 50 percent of the harscape surfaces on the project's site to meet the requirements to reduce the heat island effect for LEED compliance. Which of the following strategies should the LEEd Accredited Professional discuss with the design team?

Effective tree-shaed area of hardscape features, SRI for all nonstandard paving materials proposed, percentage of perviousness for proposed open-grid paving materials

Life-cycle assessments, LCAs, are a beneficial tool to determine the following

Environmental benefits and potential impacts of a material, product, or technology

The project team is looking to conduct LCC analysis. The following should be taken into account.

First costs, including the cost of installation, maintenance, life expectancy, and replacement cost

how many points can be earned in the RPC

Four

Who is responsible for the appeals process?

GBCI

The following are not true about establishing goals for a project

Goals can be qualitative but not quantitative Goals can be quantitative but not qualitative

the following resources should be consulted by the facility manager in reference to finding more information about sustainable purchasing options

Green Seal, ENERGY STAR, FSC

The following are strategies to reduce rainwater runoff

Green roofs, pervious pavers, bioswales

The following LEED concepts might retention ponds and bioswales design strategies contribute?

Heat island effect, rainwater runoff reduction, site disturbance, water efficient landscaping

Incorproating green building strategies such as high efficiency mechanical systems, photovoltaic systems, and indoor water wall help with the IAQ and air conditioning, it plays a role in what type of cost implications

Increased life-cycle costs, increased first costs

The following are true referencing minimum floor area requirements

LEED BD+C projects include a minimum 1000 sq ft while LEED ID+C projects require to have a minimum of 250 sq ft LEED for schools must include a min of 1000 sq ft

A developr is seeking LEED gold for a new lab facility and plan on occupying 32 percent of the facility. What rating system should be used

LEED Core and Shel

A company occupying a 50-year-old office building is replacing the mechanical systems to improve energy performance and implementing green procurement and operations policies. This LEED rating system best applies

LEED Existing Buildings: O and M

Which reference guide would you look to for information about LEED for Schools rating systems for a new ground up construction project

LEED Reference Guide for Building Design and Construction

the following rating system addresses the appropriate sizing of a project

LEED for Homes

Which rating system can be precertified

LEED for core and shell

The following are not eligible to pursue a split certification review

LEED for existing buildings: operations and maintenance LEED for neighborhood development: Plan

What does LEED stand for?

Leadership in Energy and Environmental Design

What is the foundation for sustainable design for individual buildings or entire neighborhoods?

Location

IS LEED project experience needed to take the LEED AP exam?

No

The following fields can best help provide an innovative approach to solving problems by following nature's patterns

Permaculture and biomimicry

The following are sustainable strategies that should be implemented on an auto-dependent green building?

Provide priority parking for carpools/vanpools Supply alternative fuel vehicles and accessibility to recharging stations offer discounted parking rates for multioccupant vehicles incorporate basic services for occupant usage in the new building

The following is an association factor that was established to measure and scale the credits against the impact categories

Relative efficacy and duration

What categories are specific to Neighborhood Development

Smart Location and Linkage, Green Infrastructure and Buildings

The following can enhance an understanding of community issues and concerns

Stakeholder meetings

The following is true regarding credit weightings

Three association factors were used as means to measure and scale each credit All LEED rating systems are based on 100 points Seven impact categories were defined with climate change most heavily weighted

A project's LEED certification can expire, true or false?

True

According to the Department of Energy's website, space heating is the largest energy use in the U.S, true or false?

True

Which of the following types of properties is best suited for a LEED project?

Urban Infill and site with existing infrastructure

Is it possible to sit for the LEED GA and the LEED AP exam in one day?

Yes

what material options would be best to comply with the LEED rating systems for roofing materials

White ethylene propylene diene monomer (EPDM) with an SRI of 84

If an existing building seeks water efficiency strategies but has limited budget, installing which of the following would be economically viable options

aerators and flush valves

When should construction credits and prerequisites be submitted for final cert review?

after substantial completion

The following street grid density descriptions promotes a more pedestrian friendly comunity

a higher street grid density with narrow streets interconnecting

The following type of project is best suited for commercial interiors rating system

a tenant improvement project within an existing commercial building

Emissivity is an indication of of which of the following material properties

ability of a material to give up heat in the form of long-wave radiation

LEED project registration provides the following

access to online LEED credit templates establish of contact with GBCI and the assigned certification body

the following are examples of permanently installed building products?

doors, casework, framing

the owner of a two story office project has suggested that he is interested in the installation of a vegetated roof system and would like the design team to evaluate it as an option. which set of team members best represents all of those who might offer meaningful input to this evaluation?

architect, structural engineer, landscape architect, civil engineer, mechanical engineer, and contractor

The following are examples of impervious surfaces

asphalt, sealed surfaces, concrete

the following are examples of regularly occupied spaces

bank teller station and natatorium, dorm room and an operating room

when addressing refrigerants for a project and to comply with the fundamental refrigerant management prerequisite, the following should be considered

base building air-conditioning systems, reuse of existing HVAC&R systems, eliminations of substances with high ozone-depleting potential from use in air-conditioning and refrigeration systems

The following characterizes CIRs

can be submitted any time after a project is registered, can be requested online, are relevant to one specific project

the following are considered separate products when calculating compliance with MR credits

carpet with different pile heights by the same manufacturing, gypsum wallboard with varying thicknesses by the same manufacturing

what are the three largest energy sources according to the international energy audit

coal, oil, natural gas

shortest path analysis includes the following

convenience, safety, and obstructions to movement

the following are types of process water uses

cooling towers, boilers, washing machines

the percentage calculation for rapidly renewable materials accounts for which of the following

cost of rapidly renewable materials, total materials costs for the project

the following statements are not true about green building material

cradle to grave materials can be recycled

when addressing thermal comfort, the following are not addressed

daylighting controls, artificial light

the following can balance the contribution of renewable energy sources

demand response

these are true regarding RPCs

earning an RPC adds a bonus point to the projects total points, a project may earn up to four RPC credits

integrating a building into a community does not offer which of the folowing

encourage biodiversity

ASHRAE standard 90.1-2010 is primarily concered with which of the following

energy consumption

The following tools are available to project teams to find synergies and increase efficiencies

energy modeling and BIM

the following is not considered an ongoing consumable product

furniture

the following would typically cause discomfort

glare, direct daylight, stagnant air

Integrative projects typically...

have less design changes and less change orders

The following benefits and LEED strategies might might the open-grid paving strategy contribute?

head island effect, rainwater management, optimize energy performance

how is waste hauled from a construction site calculated for the purposes of LEED

in tons

when conducting occupant surveys which of the folloowing is applicable

include a plan for corrective action, conduct confidential surveys

The following is the best landscape design strategy to implement to reduce heat island effects?

increased SRI

The following are the results of developing greenfield sites

increased total regional development footprint reduces land available for agricultural use fragmented wildlife habitat

the following uses are best described and suitable for nonpotable water

irrigation and process water

the following helps bounce and diffuse daylight

light shelves, clerestory windows

the following is not a measurement for energy use in the US

liters for liquid fuel

when addressing materials and resources, a project team should incorporate which of the following to comply with the credits and prerequisites of the MR category

location of manufacturing plant of steel, postconsumer recycled content of a chair, extraction location of silica

the following materials qualify as preconsumer recycled content

medium density fiberboard panels manufactured with sawdust generated by the manufacturing of structural insulated panels, concrete made with fly ash collected from coal-burning power plants, carpet padding manufactured with waste fiber collected from textile manufacturing plants

exemplary performance generally requires which of the following

meet or exceed the next percentage threshold as listed within the existing credit

the following are potential sources of nonpotable water

municipally supplied reclaimed water, captured rainwater, graywater

the following are examples of multioccupant spaces

natatorium and a conference room, hotel lobby and hotel front desk

the following are consistent with the requirements of low emitting materials

nonaerosol adhesives and sealants must be in compliance with VOC limits set by SCAQMD, rule 1168, paints must meet VOC limits established by the Green Seal standard (GS-36), projects are encouraged to use low-voc adhesives and sealants on exterior building elements

this is not an example of rapidly renewable materials

oak wood flooring

the following are not subject to LEED minimum energy requirements

office equipment, elevators, process energy

the following types of spaces should not be included in total parking capacity calculations

on site parking on public rights of way parking spaces for fleet vehicles motorcycle parking

there are five LEED APs working on a site, how many innovation categories can be achieved for this effort

one

How long is the exam registration period valid?

one year

which of the following statements is not a strategy to maintain indoor air qulaity

open all windows to flush contaminated air out of a building for a t least two weeks prior to occupancy

the following could contribute to earning the onsite renewable energy credit

photovoltaic panels that provide electricity to the building, solar hot water system, onsite electric generator powered by geothermal energy

the following strategies contribute to water efficient landscaping

planting of hardwood tress to provide shade, planting native or adapted plant species, combining vegetated swales and cisterns to capture rainwater

an environmental tobacco smoke control policy best addresses which of the following

preventing tobacco smoke from entering the air occupied by nonsmokers

the following design team deliverables and team members are most likely to play a significant role in achieving a construction IAQ management plan

project specs, general contractor

the following are appropriate statements with regard to commissioning in the context of green building

the CxA should be separate and independent from those individuals who are directly responsible for the project design or construction management (preferably from a separate firm)

pursing an innovation credit is appropriate when at least one of which of the following are true

the project has exceeded or is projected to exceed the minimum performance established by an existing LEED credit, the project h as achieved measurable performance in a LEED credit within another rating system

the following LEED strategies would it be important to determine regularly occupied spaces

thermal comfort strategies, interior lighting strategies

The following is true about certification bodies

they are accredited to ISO standard 17021 they are assigned to a project once a project is registered

this is the primary intent of the Green Power credit

to encourage the development and use of renewable clean energy that is connected to the utility grid

the contractor would upload the following to LEED online

total amount of waste diverted from a landfill, total material cost o the project and the percentage containing recycled content

what are the components to determine contributions of an assembled product

total product cost, percent compliant by weight, percent compliant with the sustainable criteria

Appeals can be submitted 25 business days after final certification review and appeals are submitted through LEED online, true or false?

true

Brownfield sites can improve environmental performance, sustainable communities include diverse uses and housing types, true or false?

true

Credit interpretations are reviewed by GBCI and LEED Interpretations are reviewed by USGC, true or false?

true

LID methods minimize heat island effects, LID methods increase light pollution, SRI values are relative to roofs while SR values are inteded for nonroof hardscape materials, rainwater runoff can contribute to eutrophication, true or false?

true

There is a strong correlation between sq footage and energy consumption, a curtailment event is known as a DR event, true or false?

true

project teams have the option to include furniture in MR credit calculations, escalators and other process equipment are not to be included in MR credit calculations, true or false?

true

project teams should exclude concrete formwork and other temporarily used products in calculations, they have the option to include MEP items in MR credit calculations, true or false

true

some municipalities do not allow rainwater to be captured and reuse, green building projects are rewarded for reducing demand and reusing water for both indoor and outdoor water demands, true or false?

true

Is it possible for the same building to earn multiple LEED certifications?

yes


Kaugnay na mga set ng pag-aaral

HESI: Management of a Medical Unit and Rationale

View Set

Geog 205 final study guide sansom

View Set

Community Health Exam #4 (Final)

View Set

The Book Thief Questions 1 (pg. 1-29)

View Set

Planning for Security - Chapter 5

View Set