which of the following is a suggestion for managing queues that is mentioned in the text?

segment the customers

look at #52 on ch 8. production requirement in units of product:

1. (demand forecast * safety stock)+demand forecast=x 2.x-beginning inventory

assume a FC for a process of $120,000. the VC to produce each unit of product is $35, and the selling price for the finished product is $50. which of the following is the number of units that has to be produced and sold to break even?

1. SP-VC 50-35=15 2. FC/(SP-VC) 120,000/15=8,000

which of the following are 3 major components of a queuing system?

1. the source population and the way customers arrive at the system, 2. the serving systems, and 3. how customers exit the system

using the assembly-ling balancing procedure, which of the following is the required cycle time in minutes per unit if the daily production time is 480 minutes and the required daily output is 50 units?

480/50=9.6

you have just determined the actual number of workstations that will be used on an assembly line to be 8 using the assembly-line balancing procedure. the cycle time of the line is 10 minutes and the sum of all that tasks required on the line is 60 minutes. which of the following is the correct value for the resulting line's efficiency?

E=60/(8*10)=.750

according to little's law, which of the following ratios is used to find throughput rate?

Inventory/ Flow time

little's law

Inventory=Flow time*Throughput rate

what is a work breakdown structure?

a definition of hierarchy of project tasks, subtasks, and work packages

a project starts out as which of the following?

a statement of work

a firm will work with a customer to design a product, and then make it from purchased materials, parts, and components. this firm is called:

an engineer to order firm

which of the following costs are relevant to aggregate operations planning?

backordering costs

matching the production rate to the order rate by hiring and laying off employees as the order rate varies is which of the following pure production planning strategies?

chase

total time to complete a project

create a web and add up the numbers to the end

in conducting aggregate operations planning there are a number of required inputs. which of the following are considered internal to the firm

current physical capacity and current workforce

which of the following refers to the physical presence of the customer in a service system?

customer contact

in conducting aggregate operations planning there are a number of required inputs. which of the following are inputs considered external to the firm?

raw material availability and competitor's behavior

from and operation perspective yield management is least effective under which of the following circumstances?

demand is stable and close to capacity

E=total/(actual workstations * C)

efficiency

which of the following is not considered a major work flow station?

fabrication

from an operational perspective yield management is most effective under which of the following circumstances

inventory is perishable

which of the following is not a queue discipline discussed in the textbook?

last in, first out

maintaining a stable workforce working at a constant output rate while shortages and surpluses are absorbed by fluctuating inventory levels, order backlogs, and allowing lost sales is which of the following production planning strategies?

level

in the service-system matrix, a face-to-face total customization service encounter is expected to have which of the following?

low production efficiency

in the service-system matrix, a fact to face loose specs service encounter is expected to have which of the following?

low production efficiency

when choosing a critical path

make sure you go with the letter that has a higher upper right hand corner number

a firm fills its customer's orders from finished good inventory. it is a :

make to stock firm

a series of projects that are organized in such a way that each project utilizes people from different functional areas is using which of the following organizational structures?

matrix project

buying a ticket for a college football game where there are multiple windows to buy the ticket at features which type of queuing system line structure?

multichannel, single phase

which of the following is considered a high contact service operation?

physician practice

which of the following basic types of process structures is one which similar equipment or functions are grouped together?

project

which of the following is a characteristic that can be used to guide the design of service systems?

services cannot be inventoried

in a college registration process, several department heads have to approve an individual student's semester course load. what is the queuing system line structure?

single channel, multiphase

which of the following is considered a "pure" production planning strategy?

stable workforce, variable work hours

slack

the one that is not in the critical path

for an activity in a CPM analysis, the early start time is 8 and the late start time is 10, which of the following statements is true?

the slack for this activity is 2

C=production time per day/required output per day-units

workcycle time

the main purpose of aggregate operations planning is to specify the optimal combination of which of the following?

workforce levels and inventory on hand


Kaugnay na mga set ng pag-aaral

Language in Culture and Cognition

View Set

Chapter 13: Palliative Care at End of Life

View Set

Health and Human Development - Unit 1 Exam Revision

View Set

BIO 277 Unit 5 Review:Cardiovascular Physiology

View Set

18-9 Organs With Secondary Endocrine Functions

View Set