BIM Test 1
Federated BIM Model
(See Slide) Multiple functional models contribute
Steps to leveraging the structured information in a BIM
1. evaluate the organization's core competencies and business objectives 2. static deployment of appropriate technology to eliminate guesswork about business decisions and shit the organization's output to high-value-added tasks and services.
Step 3 - Develop Information Exchanges
1. identify each potential information exchange from eh the Level 1 process map 2. choose a model element breakdown structure for the project 3 Identify the information requirements for each exchange and document the following: Model Receiver, Model file type, information, and notes 4. assign responsible parties to author the information required 5. compare input versus output content
Primary Objectives of the Specifications
1. to help project team specify BIM deliverables and get a clear picture of what will be included in a BIM deliverable 2. to help design managers explain to their teams the information and detail that needs to be provided at various points 3. to allow downstream users to rely on specification information in models they receive from others 4. to provide a standard that can be referenced by contracts and BIM execution plans
How many recommendations for successful BIM Implementation
10; they include each project tema needs a BIM Champion, owner involvement is critical throughout the process, and it is essential that the project team fosters and open environment of sharing and collaboration.
Step 2 - Design the BIM Execution Process
1st develop a high level map showing the sequencing and interaction between the primary BIM uses on the project 2nd develop more detailed process maps by the team members responsible for each detailed BIM use.
When was BIM introduced
2002 by Jerry Laiserin to describe the then new emerging next generation of design technology
Benefits of reassembly
40% faster 80% reduction of RFI's directly attributable to the resolution of over 1500 systems conflicts during preconsturction
What is BIM
A digital representation of physical and functional characteristics of a facility. serves as a shared knowledge resource for information about a facility forming a reliable basis for decisions during its life-cycle from inception a collaboration by different stakeholders at different phases of the life cycle of a facility to insert, extract, update or modify information
LOD 500
As-buildt/record model
What are uses for BIM after a project is over
Asset management space planning Maintenance scheduling
Architect Responsibilities for Bidding Documents' Phase
Assist the owner in establishing a list of prospective contractors obtain competitive bids, confirming responsiveness of bids or proposals, determining the successful bid or proposals, determining the successful bid or proposal, awarding and preparing contracts for construction
Category 7
BIM Information Exchanges illustrating the model elements by discipline, level of detail, and any specific attributes important to the project should be inlcuded
Category 6
BIM Process design maps created showing a detailed plan for implementation of each BIM use should be documented in the plan
Category 1
BIM Project Execution plan overview should include information such as a BIM mission statement and other executive summary level information
Category 8
BIM and Facility Data Requirements documenting the BIM requirements in the native format from the owner should included.
Difference between BIM and CAD
BIM can potentially compile vast amounts of building information compared to just geometry BIM has intelligent objects BIM objects include the characteristics of their real-world counterparts.
Interoperability
BIM is a shared digital representation founded on open standards for interoperability. Provides accurate and efficient information exchange between stakeholders Cited as the most important aspect that users want software companies to improve
Agency Review (IPD)
Bidding Documents
Category 9
Collaboration Procedures including their electronic and activity collaboration procedures, such as model management, standard meeting actions, and agenda
Bidding Documents/ Agency & Bidding Docs/ LOD 500
Complete drawings and specifications 100%
Implementation Documents (IPD)
Construction Documents
LOD 400
Construction Documents
Architects Responsibilities for Design Development Phase
Coordinate and integrate input from the project stakeholders and ensure compliance with project requirements Detail concert ideas into constructible form code compliance
5D
Cost (analysis tools) Cost Estimating
Step 4 - Define Supporting Infrastructure for BIM Implementation
Define the delivery structure and contract language Define the communication procedures Define the technology infrastructure Identify quality control procedures to ensure high quality information models
Category 14
Delivery Stategy/Contact ideally would be more integrated such as design-build or integrated project delivery, however it may not be possible so considerate must be given to ensure successful BIM implementation no matter what delivery method.
Detailed Design (IPD)
Design Development
LOD 300
Design Development
LOD 350
Design Development
Construction Documents/Implementation Documents/ LOD 400
Detailed specifications, building details, building elements schedule 60+ % complete design
Architects Responsibilities during Construction Documents
Finalize model for architecturally related design intent for construction Provide descriptive information for fabrication and construction of architecturally related scope Finalize specifications
Construction Documents' Phase Services
Focuses upon finalizing all drawings and specifications for building systems, site utilities, and components that will form the basis for the project's Construction Documents which allows for contractor to set GMP, obtain necessary permits, and construct the project.
Schematic/ Criteria Design/ LOD 200
Foundation type, exterior shell structural, exterior shell systems, rood type, functional space uses, overall building codes, site requirements, knowledge or soil conditions, project master schedule 5-20% of completed design
Category 3
Key Project Contacts should include at least one representative form each stakeholder, such as the owner, designers, consultants, prime contractors
Class 5 estimate
LOD 100 Purpose: concept, feasibility, budgeting, pro forma
Class 4 estimate
LOD 200 Purpose: study systems and types of construction, feasibility, for forma
Class 3 Estimate
LOD 300/LOD 350 Purpose: Refining budget and verifying budget system studies
Class 2 estimate
LOD 400 Purpose: Construction costs and anticipated bid results
Class 1 estimate
LOD 5 Purpose: Final Cost Control
Building Chanlenges
Material Consumption Energy Consumption
Category 12
Model Structure should identify the method to ensure model accuracy and comprehensiveness
NBIMS
National Building Information Modeling Standards a digital representation of physical and functional characteristics of a facility.
is creating a single building model the desired outcome of BIM?
No, the goal is to compile a comprehensive, reliable, accessible, and easily exchangeable building information for anyone who needs it throughout the life cycle of a building.
Intent of LOD
Not a set of requirements as to what is modeled when or by whom. Is a language by which users of the Specification can define the requirement as to what is modeled when or by whom.
nD
Operations & maintenance
Category 5
Organizational Roles and staffing with specific responsibilities must be defined. for each BIM use selected, the team must identify which organizations will staff and perform that use
you can add folders to the _____ list in the save as dialog box to access the frequently used folders directly
Places
What are the 5 design phases
Predesign Schematic Design Development Construction Documents Bidding Documents
Design Development/ Detailed Design/ LOD 300 & LOD 350
Preliminary specifications, preliminary building sections, preliminary-structural foundations, exterior walls, elevated slabs, interior walls, doors, windows 20-60% of completed design
Category 4
Project BIM Goals/Bim Uses should be documented, including a list of BIM goals and BIM use analysis worksheet
Category 13
Project Deliverables required by the project owner should be established with the deliverable project phase, due data format and any other specific information about the deliverable
Category 2
Project Information may be valuable for current and guru use should be included
Step 1 - Identify BIM Goals and uses
Project goals should be specific to the project, measurable, and strive to improve the successes of the panning, design, construction, and operations of the facility Begin wit the end in mind and identify the appropriate uses of BIM, begin with potential end-uses
Category 10
Quality Control the model should be determined and documented by the project team.
Rating system under step 1
Rate the capabilities of each party for each BIM use based on Resources, competency, and experience
Industry driving factors of BIM
Reduce Waste One thing we talked about in class was at Washington where they preassembled everything
Details dBIM Use Process Map clearly identifies what three categories
Reference Information: structured information resources Process: a logical sequence of activities that constitute a particular BIM use Information Exchange: the BIM deliverable from one process which may be required as a resource for future processes
Criteria Design (IPD)
Schematic Design
LOD 200
Schematic Design
Project Level and Organizational Level
Software applications + information + Business processes
Predesign/Conceptualization/LOD 100
Square foot of building, number of floors, overall height, building use type 5% of completed design
Category 11
Technolog Infrastructure needs should include the requirements for hardware so the downstream hardware is not less powerful then the hardware used to create the information; software platforms
4D
Time (analysis tools) visual planning with schedule analysis
If you start a new project with selecting "None" as the template, it will still have the default settings of Revit architecture
True
Value of BIM
Well planned projects which increase design quality, greater fabrication, improved field efficiency, and increased innovation.
To access open projects, choose the switch window drop down form the?
Windows panel of the view tab
Interoperable software relies on
a common language for mapping data from any one application to any other application(s)
Model Element
a portion of the BIM representing a component, system or assembly within a building or building site.
This category consist of annotations such as dimension, text notes, tags, symbols
annotation category
Building information model is
any compilation of building information, in any format and any simulation of any real activity related to a building Data may be in single or multiple electronic data formats, complete or incomplete, that supports a systems approach in any stage in the life cycle of a building
A stacked wall is comprised of one or more ____ wall types
basic
Value of developing a BIM plan
better communication organizations will understand their roles and responsibilities in the implementation the team will be able to design an execution process which is well suited for each team member's business practice outline any additional resources, training needed contract language can be defined benchmarks can be set baselines will allow goals to be measurable
the ___ option enable you to sketch continuous, end to end connected wall segments
chain
Changing the way we think about BIM means
changing the way we think about building information and the modeling of building information
BIM is a
communication or collaboration tool when someone other then the author extracts information from it.
Material Consumption
construction consumes 40% of global raw materials
These are displayed when you choose certain tools or select elements. these elements contain a set of tool or buttons that relate only to a particular tool or element
contextual tabs
Level of development
describes the level of completeness to which a Model Element is developed
The real value of BIM to any organizations
design, construction, or building owner - lies in leveraging the structure information contained in a building information model to create value
Planning team should be assembled in the
early stages of the project and include representatives from all primary project members
By default, when you sketch a wall form left to right, the lower face becomes the external face
false
In the object snaps area of the snaps dialog box, you can set length of angular snap increments for placing elements or components in a project view.
false
When you modify the issuance properties of a wall, the instance properties of all the similar wall types used in the project are modified
false
A ________ is described as a set of elements of the same category that can be grouped together based on certain common parameters or characteristics
family
Contextual tabs are visible all the time, regardless of which tool is active
fasle
To specify the location of the default template file, you can use the ____ tab of the options dialog box
files location
LOD specifications provide a
framework that addresses several issues that arise when a BIM is used as a communication or collaboration tool.
3D
graphics (authoring tools) design review for program verification design for site planning and analysis design review from solar study
To create a detailed map, a team should
hierarchically decompose the BIM use Define the dependency between processes predecessors and successors of each process develop the detailed process map to include reference information, information exchanges and responsible parties add goal verification gateways at important decision points in the process document, review and refine the proecess
4 steps to a BIM Execution Plan
identify BIM Goals and uses Design BIM Project execution process Develop Information Exchanges Define supporting infrastructure for BIM Implementation
When should BIM be developed
in the early stages of a project
Energy Consumption
increase of 31% from 2005 to 2030. from 100-131.2 btu's per year.
Business Opportunities
information to improve profits - converting inefficiency and waste into profit ( make up 40% of wast in landfills) Information to improve decisions - structured information in information that is organized, defined, and exchangeable. Information to improve processes - missing knowledge about the means and methods, reduction of time in design, Information to improve building performance - improve maintenance, equipment performance, and the life of systems.
Business drivers for the development of BIM
integrated project design scenario planning rapid, iterative design lean
Basic premise of BIM
is Collaborations by different stakeholders at different phases of the life cycle of a facility to insert, extract, update or modify information in the BIM process.
Design Development Phase
is a refinement of the scope of work identified during the Schematic Design. drawings, BIM models, mock-ups, and detailed plans are developed to present a coordinated, clear view of the project's major elements.
By visualizing a building information model as a compendium of paper based data
it allows us to focus on information not geometry, allows us to grasp the full scope, and how to better organize and exchange building information
Reliable information is
key in the communication process between project team members.
A wall is a composite building element that can consist of several layers, shown in the _____ of they type properties dialog box
layers area
benefits of increased efficiency and productivity
lower costs increased profits, helps raise the standard of living by making goods an services affordable
How is technological advancement measured
means and methods of production and the consumption of raw material
The ribbon can display different view states. you can mange these by selecting any of the following options
minimize to tabs, minimize to panel titles, minimize to panel buttons, and cycle through all
This category consist of various building element used in creating building model - such as walls, floors, ceilings, roofs,
model category
BIM is
multi-dimentisional representations with data and metadata associated with model elements
Scoping
objective is to develop the ideas and plans of an owner to identify the architectural program of a project
Programming
objective is to expand upon and refine the option recommended at the end of the feasibility study. The clients objectives, space requirements, and operational plan will be translated into a facility program.
The ____ button in the save as dialog box can be used to specify maximum number of back ups for a project file
options
The _______ provide information about the common parameters of component type and the options for creating or editing it.
options bar
BIM Project Execution Plan
outlines the overall vision along with implementation detail for the team to follow throughout the project.
LOD 100 model element
predesign
Conceptualization (IPD)
pridesign
This interface element displays project views, schedules, sheets, families, and groups in a logical, tree-like structure
project browser
you can use the ____ to view the instance parameters of an element
project browser
Information exchanges occur between the
project participants and should be clearly identified
Schematic Phase Objective
refine and build upon the scope, conceptual design, scale, and relationship among the components of the project
Feasibility
review and development of options arising from the scoping activities. In the end on option is designated for further exploration in porgramming
The main components of the Revit interface are:
ribbon, project Browser, drawing area, options bar.
Integrated
software requires selection of a single platform with which all software is integrated using some type of translator for data exchange because data is typically proprietary and will not exchange in an open standard interoperable format.
Which value of the structural usage parameter will turn a structural wall into an architectural wall
structural combined
When sketching a wall for the first time, a dimension will appear that updates dynamically to help maintain precise measurements
temporary dimensions
The _____ option of Autodesk Revit Architecture enable you to override the snap settings for a single pick only
temporary override
BIM Plan should address
the 14 categories which include key project contacts, project information, and BIM plan overview information
Best case scenario for Interoperable software
the alternative is integrated
BIM is a process forces on what?
the development, use, and transfer of a digital information model of a building project to improve the design, construction, and operations of a project of portfolio of facilities
Model Element Author
the party responsible for developing the content of a specific Model Element to the LOD required by phase.
What should you always identify the leader for coordination and compiling based on
the project delivery method, timing of the BIM Plan development, and expertise of the participants
Project Units are grouped by discipline
time
Why do we develop a BIM Project Execution Plan
to define the scope of BIM implementation on the project Identify the process flow fro BIM tasks Define the information exchanges between parties describe the required project and company infrastructure needed to support the implementation
In Revit, all the enabled object snaps work together
true
In the ribbon you can move a panel by place it anywhere on the screen
true
The options in the families section of the recent files window are used to create a conceptual mass model
true
The ribbon is displayed at the top of the screen. it contains task-based take and panels, which provide all the tools necessary for creating a project
true
The type properties of a wall specify the common parameters shared by all elements in a family. any changes made in the type properties of a wall element will affect all inserted elements of the family in the project
true
The type selector drop-down list is located int he properties palette of the currently activated tool
true
While opening a previously saved Revit File, you are able to preview the file
true
You can customize the display of the quick access toolbar
true
a project file can be opened by double-clicking on the file name in the windows explore
true
can you save any project file as a template file
true
while saving a project file for the first time, the save as dialog box is displayed on choosing the save tool from the application menu
true
you can create a wall type of your choice by combining various layers
true
you can modify the instance properties of a wall type in the properties palette
true
In Revit, elements have two sets of properties
type and instance
you can select a wall type form the ____ drop-down list
type selector
Architect's Primary Responsibilities
validation of opportunities and options confirms space program meets code requirements and applicable standards and is aligned with the overall project goals. visualize mason of building and adjacency concerns on site identify sustainable design outcomes that have a cost impact to the project Prepares design Schedules
Risk associated with BIM
when implemented by teams with little experience when it is implemented by people who are not familiar with the strategies and processes
should a BIM Plan be monitored, updated, and revised as needed
yes
should BIM be continuously developed
yes as additional participants are added to the project
is a spreadsheet of spatial data a building information model?
yes if you use the alphanumeric data contained in the spreadsheet to simulate an actual business process in the life cycle of a building, such as asset management.
Should the BIM Plan team conduct a series of planning meetings to develop the execution plan?
yes, most projects will have minimum of two or three meetings