Federated BIM Model

(See Slide) Multiple functional models contribute

Steps to leveraging the structured information in a BIM

1. evaluate the organization's core competencies and business objectives 2. static deployment of appropriate technology to eliminate guesswork about business decisions and shit the organization's output to high-value-added tasks and services.

Step 3 - Develop Information Exchanges

1. identify each potential information exchange from eh the Level 1 process map 2. choose a model element breakdown structure for the project 3 Identify the information requirements for each exchange and document the following: Model Receiver, Model file type, information, and notes 4. assign responsible parties to author the information required 5. compare input versus output content

Primary Objectives of the Specifications

1. to help project team specify BIM deliverables and get a clear picture of what will be included in a BIM deliverable 2. to help design managers explain to their teams the information and detail that needs to be provided at various points 3. to allow downstream users to rely on specification information in models they receive from others 4. to provide a standard that can be referenced by contracts and BIM execution plans

How many recommendations for successful BIM Implementation

10; they include each project tema needs a BIM Champion, owner involvement is critical throughout the process, and it is essential that the project team fosters and open environment of sharing and collaboration.

Step 2 - Design the BIM Execution Process

1st develop a high level map showing the sequencing and interaction between the primary BIM uses on the project 2nd develop more detailed process maps by the team members responsible for each detailed BIM use.

When was BIM introduced

2002 by Jerry Laiserin to describe the then new emerging next generation of design technology

Benefits of reassembly

40% faster 80% reduction of RFI's directly attributable to the resolution of over 1500 systems conflicts during preconsturction

What is BIM

A digital representation of physical and functional characteristics of a facility. serves as a shared knowledge resource for information about a facility forming a reliable basis for decisions during its life-cycle from inception a collaboration by different stakeholders at different phases of the life cycle of a facility to insert, extract, update or modify information

LOD 500

As-buildt/record model

What are uses for BIM after a project is over

Asset management space planning Maintenance scheduling

Architect Responsibilities for Bidding Documents' Phase

Assist the owner in establishing a list of prospective contractors obtain competitive bids, confirming responsiveness of bids or proposals, determining the successful bid or proposals, determining the successful bid or proposal, awarding and preparing contracts for construction

Category 7

BIM Information Exchanges illustrating the model elements by discipline, level of detail, and any specific attributes important to the project should be inlcuded

Category 6

BIM Process design maps created showing a detailed plan for implementation of each BIM use should be documented in the plan

Category 1

BIM Project Execution plan overview should include information such as a BIM mission statement and other executive summary level information

Category 8

BIM and Facility Data Requirements documenting the BIM requirements in the native format from the owner should included.

Difference between BIM and CAD

BIM can potentially compile vast amounts of building information compared to just geometry BIM has intelligent objects BIM objects include the characteristics of their real-world counterparts.

Interoperability

BIM is a shared digital representation founded on open standards for interoperability. Provides accurate and efficient information exchange between stakeholders Cited as the most important aspect that users want software companies to improve

Agency Review (IPD)

Bidding Documents

Category 9

Collaboration Procedures including their electronic and activity collaboration procedures, such as model management, standard meeting actions, and agenda

Bidding Documents/ Agency & Bidding Docs/ LOD 500

Complete drawings and specifications 100%

Implementation Documents (IPD)

Construction Documents

LOD 400

Construction Documents

Architects Responsibilities for Design Development Phase

Coordinate and integrate input from the project stakeholders and ensure compliance with project requirements Detail concert ideas into constructible form code compliance

5D

Cost (analysis tools) Cost Estimating

Step 4 - Define Supporting Infrastructure for BIM Implementation

Define the delivery structure and contract language Define the communication procedures Define the technology infrastructure Identify quality control procedures to ensure high quality information models

Category 14

Delivery Stategy/Contact ideally would be more integrated such as design-build or integrated project delivery, however it may not be possible so considerate must be given to ensure successful BIM implementation no matter what delivery method.

Detailed Design (IPD)

Design Development

LOD 300

Design Development

LOD 350

Design Development

Construction Documents/Implementation Documents/ LOD 400

Detailed specifications, building details, building elements schedule 60+ % complete design

Architects Responsibilities during Construction Documents

Finalize model for architecturally related design intent for construction Provide descriptive information for fabrication and construction of architecturally related scope Finalize specifications

Construction Documents' Phase Services

Focuses upon finalizing all drawings and specifications for building systems, site utilities, and components that will form the basis for the project's Construction Documents which allows for contractor to set GMP, obtain necessary permits, and construct the project.

Schematic/ Criteria Design/ LOD 200

Foundation type, exterior shell structural, exterior shell systems, rood type, functional space uses, overall building codes, site requirements, knowledge or soil conditions, project master schedule 5-20% of completed design

Category 3

Key Project Contacts should include at least one representative form each stakeholder, such as the owner, designers, consultants, prime contractors

Class 5 estimate

LOD 100 Purpose: concept, feasibility, budgeting, pro forma

Class 4 estimate

LOD 200 Purpose: study systems and types of construction, feasibility, for forma

Class 3 Estimate

LOD 300/LOD 350 Purpose: Refining budget and verifying budget system studies

Class 2 estimate

LOD 400 Purpose: Construction costs and anticipated bid results

Class 1 estimate

LOD 5 Purpose: Final Cost Control

Building Chanlenges

Material Consumption Energy Consumption

Category 12

Model Structure should identify the method to ensure model accuracy and comprehensiveness

NBIMS

National Building Information Modeling Standards a digital representation of physical and functional characteristics of a facility.

is creating a single building model the desired outcome of BIM?

No, the goal is to compile a comprehensive, reliable, accessible, and easily exchangeable building information for anyone who needs it throughout the life cycle of a building.

Intent of LOD

Not a set of requirements as to what is modeled when or by whom. Is a language by which users of the Specification can define the requirement as to what is modeled when or by whom.

nD

Operations & maintenance

Category 5

Organizational Roles and staffing with specific responsibilities must be defined. for each BIM use selected, the team must identify which organizations will staff and perform that use

you can add folders to the _____ list in the save as dialog box to access the frequently used folders directly

Places

What are the 5 design phases

Predesign Schematic Design Development Construction Documents Bidding Documents

Design Development/ Detailed Design/ LOD 300 & LOD 350

Preliminary specifications, preliminary building sections, preliminary-structural foundations, exterior walls, elevated slabs, interior walls, doors, windows 20-60% of completed design

Category 4

Project BIM Goals/Bim Uses should be documented, including a list of BIM goals and BIM use analysis worksheet

Category 13

Project Deliverables required by the project owner should be established with the deliverable project phase, due data format and any other specific information about the deliverable

Category 2

Project Information may be valuable for current and guru use should be included

Step 1 - Identify BIM Goals and uses

Project goals should be specific to the project, measurable, and strive to improve the successes of the panning, design, construction, and operations of the facility Begin wit the end in mind and identify the appropriate uses of BIM, begin with potential end-uses

Category 10

Quality Control the model should be determined and documented by the project team.

Rating system under step 1

Rate the capabilities of each party for each BIM use based on Resources, competency, and experience

Industry driving factors of BIM

Reduce Waste One thing we talked about in class was at Washington where they preassembled everything

Details dBIM Use Process Map clearly identifies what three categories

Reference Information: structured information resources Process: a logical sequence of activities that constitute a particular BIM use Information Exchange: the BIM deliverable from one process which may be required as a resource for future processes

Criteria Design (IPD)

Schematic Design

LOD 200

Schematic Design

Project Level and Organizational Level

Software applications + information + Business processes

Predesign/Conceptualization/LOD 100

Square foot of building, number of floors, overall height, building use type 5% of completed design

Category 11

Technolog Infrastructure needs should include the requirements for hardware so the downstream hardware is not less powerful then the hardware used to create the information; software platforms

4D

Time (analysis tools) visual planning with schedule analysis

If you start a new project with selecting "None" as the template, it will still have the default settings of Revit architecture

True

Value of BIM

Well planned projects which increase design quality, greater fabrication, improved field efficiency, and increased innovation.

To access open projects, choose the switch window drop down form the?

Windows panel of the view tab

Interoperable software relies on

a common language for mapping data from any one application to any other application(s)

Model Element

a portion of the BIM representing a component, system or assembly within a building or building site.

This category consist of annotations such as dimension, text notes, tags, symbols

annotation category

Building information model is

any compilation of building information, in any format and any simulation of any real activity related to a building Data may be in single or multiple electronic data formats, complete or incomplete, that supports a systems approach in any stage in the life cycle of a building

A stacked wall is comprised of one or more ____ wall types

basic

Value of developing a BIM plan

better communication organizations will understand their roles and responsibilities in the implementation the team will be able to design an execution process which is well suited for each team member's business practice outline any additional resources, training needed contract language can be defined benchmarks can be set baselines will allow goals to be measurable

the ___ option enable you to sketch continuous, end to end connected wall segments

chain

Changing the way we think about BIM means

changing the way we think about building information and the modeling of building information

BIM is a

communication or collaboration tool when someone other then the author extracts information from it.

Material Consumption

construction consumes 40% of global raw materials

These are displayed when you choose certain tools or select elements. these elements contain a set of tool or buttons that relate only to a particular tool or element

contextual tabs

Level of development

describes the level of completeness to which a Model Element is developed

The real value of BIM to any organizations

design, construction, or building owner - lies in leveraging the structure information contained in a building information model to create value

Planning team should be assembled in the

early stages of the project and include representatives from all primary project members

By default, when you sketch a wall form left to right, the lower face becomes the external face

false

In the object snaps area of the snaps dialog box, you can set length of angular snap increments for placing elements or components in a project view.

false

When you modify the issuance properties of a wall, the instance properties of all the similar wall types used in the project are modified

false

A ________ is described as a set of elements of the same category that can be grouped together based on certain common parameters or characteristics

family

Contextual tabs are visible all the time, regardless of which tool is active

fasle

To specify the location of the default template file, you can use the ____ tab of the options dialog box

files location

LOD specifications provide a

framework that addresses several issues that arise when a BIM is used as a communication or collaboration tool.

3D

graphics (authoring tools) design review for program verification design for site planning and analysis design review from solar study

To create a detailed map, a team should

hierarchically decompose the BIM use Define the dependency between processes predecessors and successors of each process develop the detailed process map to include reference information, information exchanges and responsible parties add goal verification gateways at important decision points in the process document, review and refine the proecess

4 steps to a BIM Execution Plan

identify BIM Goals and uses Design BIM Project execution process Develop Information Exchanges Define supporting infrastructure for BIM Implementation

When should BIM be developed

in the early stages of a project

Energy Consumption

increase of 31% from 2005 to 2030. from 100-131.2 btu's per year.

Business Opportunities

information to improve profits - converting inefficiency and waste into profit ( make up 40% of wast in landfills) Information to improve decisions - structured information in information that is organized, defined, and exchangeable. Information to improve processes - missing knowledge about the means and methods, reduction of time in design, Information to improve building performance - improve maintenance, equipment performance, and the life of systems.

Business drivers for the development of BIM

integrated project design scenario planning rapid, iterative design lean

Basic premise of BIM

is Collaborations by different stakeholders at different phases of the life cycle of a facility to insert, extract, update or modify information in the BIM process.

Design Development Phase

is a refinement of the scope of work identified during the Schematic Design. drawings, BIM models, mock-ups, and detailed plans are developed to present a coordinated, clear view of the project's major elements.

By visualizing a building information model as a compendium of paper based data

it allows us to focus on information not geometry, allows us to grasp the full scope, and how to better organize and exchange building information

Reliable information is

key in the communication process between project team members.

A wall is a composite building element that can consist of several layers, shown in the _____ of they type properties dialog box

layers area

benefits of increased efficiency and productivity

lower costs increased profits, helps raise the standard of living by making goods an services affordable

How is technological advancement measured

means and methods of production and the consumption of raw material

The ribbon can display different view states. you can mange these by selecting any of the following options

minimize to tabs, minimize to panel titles, minimize to panel buttons, and cycle through all

This category consist of various building element used in creating building model - such as walls, floors, ceilings, roofs,

model category

BIM is

multi-dimentisional representations with data and metadata associated with model elements

Scoping

objective is to develop the ideas and plans of an owner to identify the architectural program of a project

Programming

objective is to expand upon and refine the option recommended at the end of the feasibility study. The clients objectives, space requirements, and operational plan will be translated into a facility program.

The ____ button in the save as dialog box can be used to specify maximum number of back ups for a project file

options

The _______ provide information about the common parameters of component type and the options for creating or editing it.

options bar

BIM Project Execution Plan

outlines the overall vision along with implementation detail for the team to follow throughout the project.

LOD 100 model element

predesign

Conceptualization (IPD)

pridesign

This interface element displays project views, schedules, sheets, families, and groups in a logical, tree-like structure

project browser

you can use the ____ to view the instance parameters of an element

project browser

Information exchanges occur between the

project participants and should be clearly identified

Schematic Phase Objective

refine and build upon the scope, conceptual design, scale, and relationship among the components of the project

Feasibility

review and development of options arising from the scoping activities. In the end on option is designated for further exploration in porgramming

The main components of the Revit interface are:

ribbon, project Browser, drawing area, options bar.

Integrated

software requires selection of a single platform with which all software is integrated using some type of translator for data exchange because data is typically proprietary and will not exchange in an open standard interoperable format.

Which value of the structural usage parameter will turn a structural wall into an architectural wall

structural combined

When sketching a wall for the first time, a dimension will appear that updates dynamically to help maintain precise measurements

temporary dimensions

The _____ option of Autodesk Revit Architecture enable you to override the snap settings for a single pick only

temporary override

BIM Plan should address

the 14 categories which include key project contacts, project information, and BIM plan overview information

Best case scenario for Interoperable software

the alternative is integrated

BIM is a process forces on what?

the development, use, and transfer of a digital information model of a building project to improve the design, construction, and operations of a project of portfolio of facilities

Model Element Author

the party responsible for developing the content of a specific Model Element to the LOD required by phase.

What should you always identify the leader for coordination and compiling based on

the project delivery method, timing of the BIM Plan development, and expertise of the participants

Project Units are grouped by discipline

time

Why do we develop a BIM Project Execution Plan

to define the scope of BIM implementation on the project Identify the process flow fro BIM tasks Define the information exchanges between parties describe the required project and company infrastructure needed to support the implementation

In Revit, all the enabled object snaps work together

true

In the ribbon you can move a panel by place it anywhere on the screen

true

The options in the families section of the recent files window are used to create a conceptual mass model

true

The ribbon is displayed at the top of the screen. it contains task-based take and panels, which provide all the tools necessary for creating a project

true

The type properties of a wall specify the common parameters shared by all elements in a family. any changes made in the type properties of a wall element will affect all inserted elements of the family in the project

true

The type selector drop-down list is located int he properties palette of the currently activated tool

true

While opening a previously saved Revit File, you are able to preview the file

true

You can customize the display of the quick access toolbar

true

a project file can be opened by double-clicking on the file name in the windows explore

true

can you save any project file as a template file

true

while saving a project file for the first time, the save as dialog box is displayed on choosing the save tool from the application menu

true

you can create a wall type of your choice by combining various layers

true

you can modify the instance properties of a wall type in the properties palette

true

In Revit, elements have two sets of properties

type and instance

you can select a wall type form the ____ drop-down list

type selector

Architect's Primary Responsibilities

validation of opportunities and options confirms space program meets code requirements and applicable standards and is aligned with the overall project goals. visualize mason of building and adjacency concerns on site identify sustainable design outcomes that have a cost impact to the project Prepares design Schedules

Risk associated with BIM

when implemented by teams with little experience when it is implemented by people who are not familiar with the strategies and processes

should a BIM Plan be monitored, updated, and revised as needed

yes

should BIM be continuously developed

yes as additional participants are added to the project

is a spreadsheet of spatial data a building information model?

yes if you use the alphanumeric data contained in the spreadsheet to simulate an actual business process in the life cycle of a building, such as asset management.

Should the BIM Plan team conduct a series of planning meetings to develop the execution plan?

yes, most projects will have minimum of two or three meetings


Ensembles d'études connexes

Biology 225 Exam 3 Spring 2020: Endocrinology and Reproduction

View Set

Med Surg Ch. 57 Female Reproductive Disorders

View Set

MANA3335 MindTap Learn It: Chapter 11: Leadership and Influence Processes

View Set

NCLEX review questions IV therapy and blood Administration

View Set

Assignment 12 - Single Phase Transformers

View Set

বাংলাদেশের বনভূমি

View Set

aintnoway cuh get me out of here

View Set