chapter 3 piping and instrumentation

Réussis tes devoirs et examens dès maintenant avec Quizwiz!

Primary, Controller, Final Element

3 most common elements that make up a control loop

Distributed Control System

A P&ID can show only part of the control strategy implemented in a ___ or a programmable logic controller

Flow (F)

A P&ID uses the letter ___ for water flow in an instrument tag ballon

Piping and Instrumentation

A______ diagram is a schematic diagram of the relationships between instruments, controllers, piping, and system equipment

Temperature Indicating Controller

The letters TIC on a controller symbol on a P&ID stands for___

ISA

___ has developed a comprehensive standard for instrumentation symbols

Alarm

a P&ID uses the letter ___ as a modifier representing an alarm in a an instrument tag ballon

Current (I)

a P&ID uses the letter ___ for electrical current in an instrumentation tag ballon

Ballon

a ____ is a circular symbol used to identify the purpose of an instrument or device

Temperature Switch High

the letters TSH on a P&ID represent "___"

Temperature Valve

the letters TV on a P&ID represent "____"


Ensembles d'études connexes

Chapter 11 (Atomic Nature of Matter) Test Review

View Set

ENG2 - Functional Resume, Combination Resume, Common Resume Issues, Common Mistakes in Making A Resume

View Set

NCLEX Review Study Guide (Summer 2022)

View Set

Maternal Infant Ch 9, Ch 14, 10, 11, 13 Practice Questions - FROM ONLINE RESOURCES

View Set

Collaborative Practice and Care Coordination across Settings ch.12 PrepU

View Set

Energy - the ability to do work or cause change Work - when a force is put on an object that causes it to move Kinetic energy - the energy an object has because of its movement Potential energy - stored energy from the position or shape of an

View Set

Carlos N-MS-500: Microsoft 365 Security Administration

View Set