Chapter 6

Réussis tes devoirs et examens dès maintenant avec Quizwiz!

_____ is the amount of time an activity can be delayed from its early start without delaying the planned project finish date. a. Total slack b. Free float c. Backward pass d. Forward pass

Total slack

The arrows in a network diagram represent missed milestones in a project.

F

The main disadvantage of crashing is that it lengthens the time needed to finish a project.

F

One of the first reality checks on scheduling that a project manager should make is to review the _____.

draft schedule

After working with key stakeholders to define activities and calculate their resources, the next process in project time management is to: a. develop the schedule. b. control the schedule. c. determine their dependencies. d. estimate the duration of activities.

estimate the duration of activities.

In project time management, the process of _____ involves deciding how many people, equipment, and materials a project team should use to perform project activities.

estimating activity resources

Critical chain scheduling protects tasks on the critical chain from being delayed by using _____, which consist of additional time added before tasks on the critical chain that are preceded by non-critical-path tasks. a. critical paths b. feeding buffers c. dummy activities d. fast tracking

feeding buffers

In a(n) _____ relationship, the "from" activity must start before the "to" activity can be finished.

start-to-finish

In project time management, the next step after sequencing activities is to define these activities.

F

In project time management, the primary output of defining activities is a schedule management plan.

F

Milestones are easy to achieve and are always achieved through one main activity.

F

One of PERT's main disadvantages is that it does not address the risk associated with duration estimates.

F

A(n) _____ is a schematic display of the logical relationships among project activities and their sequencing.

network diagram

To define activities, the project team should start with reviewing the schedule management plan, scope baseline, enterprise environmental factors, and organizational processes.

T

A similarity between the crashing technique and the fast tracking technique is that: a. both spread out tasks over a long period of time to ensure the quality of work is maintained. b. both invariably result in increases in total project costs. c. both can shorten the time needed to finish a project. d. both are network diagramming techniques used primarily to predict total project duration.

C

Which of the following is a silimarity between scope control and schedule control? a. Both are initial processes of project time management. b. Both of their primary goals is to define project goals and miestones. c. Both are portions of the integrated change control process under project integration management. d. Both of these processes should occur before estimating activity durations.

C

Which of the following is true of a finsih-to-finish dependency? a. It is a dependency in which the "from" activity cannot start until the "to" activity or successor is started. b. It is a dependency in which in which the "from" activity must finish before the "to" activity or successor can start. c. It is a dependency in which the "from" activity must be finished before the "to" activity can be finished. d. It is a dependency in which the "from" activity must start before the "to" activity can be finished.

C

Which of the following is a network diagramming technique used primarily to predict total project duration? a. Gantt chart b. Critical path analysis c. Resource breakdown structure d. Arrow diagramming method

Critical path analysis

Which of the following processes in project time management involves identifying the specific tasks that the project team members and stakeholders must perform to produce the project deliverables? a. Defining activities b. Sequencing activities c. Developing the schedule d. Estimating activity durations

Defining activities

A difference between the Program Evaluation and Review Technique (PERT) and critical path method (CPM) is that: a. CPM addresses the risk associated with duration estimates whereas PERT does not. b. unlike CPM, PERT estimates only when there is no risk of uncertainty. c. CPM involves more work than PERT because it requires several duration estimates. d. PERT uses different duration estimates whereas CPM uses one specific duration estimate.

D

In project time management, which of the following processes generate the main outputs of an activity list, activity attributes, and a milestone list? a. Sequencing activities b. Defining activities c. Resource estimating activities d. Estimating activity durations

Defining activities

Which of the following techniques involve doing activities in parallel that one would normally do in sequence? a. Critical chain scheduling b. Crashing c. Fast tracking d. PERT analysis

Fast tracking

_____ provide(s) a standard format for displaying project schedule information by listing project activities and their corresponding start and finish dates in a calendar format. a. Gantt charts b. Critical path analysis c. Arrow diagramming method d. PERT analysis

Gantt charts

A network diagramming technique in which boxes represent activities is known as a(n) _____ a. PDM b. CPM c. ADM d. PERT

PDM

_____ states that work expands to fill the time allowed. a. Murphy's Law b. Miller's Law c. Parkinson's Law d. Einstein's Law

Parkinson's Law

Which of the following documents is most likely to include planned project start and end dates which serve as the starting points for a detailed schedule? a. Resource breakdown structure b. Milestones list c. Organizational process assets update d. Project charter

Project charter

Which of the following is one of the main outputs of estimating activity resources process? a. Project documents update b. Milestone list c. Work breakdown structure d. Activity duration estimate

Project documents update

A Tracking Gantt chart is based on the percentage of work completed for project tasks or the actual start and finish dates.

T

In the activity defining process, the project team should review the _____ and activity attributes with project stakeholders before moving on to the next step in project time management.

activity list

The _____ is a tabulation of activities to be included on a project schedule.

activity list

The activity list should include the _____, an activity identifier, and a brief description of the activity.

activity name

In project time management, the process of_____ primarily involves checking and managing changes to the project schedule. a. estimating activity durations b. developing the schedule c. controlling the schedule d. estimating activity resources

controlling the schedule

The technique for making cost and schedule trade-offs to obtain the greatest amount of schedule compression for the least incremental cost is known as _____. a. dependency b. crashing c. critical chain scheduling d. feeding buffers

crashing

In project time management, the main goal of _____ is to ensure that the project team has complete understanding of all the work they must do as part of the project scope so they can start scheduling the work. a. defining activities b. estimating activity durations c. estimating activity resources d. controlling the schedule

defining activities

In project time management, the next step after defining project activities is: a. planning schedule management. b. determining their dependencies. c. controlling the schedule. d. estimating activity duration.

determining their dependencies.

In project time management, the ultimate goal of _____ is to provide a basis for monitoring project progress for the time dimension of the project. a. defining activities b. sequencing activities c. developing a schedule d. estimating activity resources

developing a schedule

The amount of time an activity can be delayed without delaying the early start date of any immediately following activities is known as a _____. a. forward pass b. backward pass c. fast tracking d. free slack

free slack

The _____ for an activity is the latest possible time an activity might begin without delaying the project finish date. a. early finish date b. late finish date c. late start date d. early start date

late start date

The critical path is the _____ path through a network diagram, and it represents the _____ amount of slack or float. a. longest; longest b. longest; shortest c. shortest; longest d. shortest; shortest

longest; shortest

The first process involved in project time management is _____ . a. defining activities b. estimating activity durations c. planning schedule management d. sequencing activities

planning schedule management

A draft schedule for a project is most likely to be found in a _____. a. project buffer b. project charter c. resource breakdown structure d. project's dummy activities list

project charter

In project time management, a(n) _____ is an output of controlling the schedule a. activity duration estimate b. project management plan update c. activity attribute d. milestones list

project management plan update

A white diamond on a Tracking Gantt chart represents a(n) _____.

slipped milestone

Duration estimates can be provided as a discrete number, a range, or as a(n) _____.

three-point estimate

In a project schedule, the variable that has the least amount of flexibility is _____.

time

The ultimate goal of developing a realistic project schedule is to provide a basis for monitoring project progress for the _____ dimension of the project.

time

In a Gantt chart, thick black bars represent milestones achieved in a project.

F

A(n) _____ Gantt chart compares planned and actual project schedule information.

Tracking

In an AOA network diagram, _____ occur when two or more activities follow a single node. a. combinations b. buffers c. mergers d. bursts

bursts

A(n) _____ for a project is the series of activities that determine the earliest time by which the project can be completed.

critical path

In a network diagram, a(n) _____ is the starting and ending point of an activity.

node

AOA network diagrams use only _____ dependencies. a. start-to-start b. finish-to-start c. finish-to-finish d. start-to-finish

finish-to-start

A(n) _____ determines the early start and early finish dates for each activity in a project.

forward pass

In project time management, which of the following processes involve analyzing activity sequences, activity resource estimates, and activity duration estimates to create the project schedule? a. Planning schedule management b. Developing the schedule c. Controlling the schedule d. Defining activities

Developing the schedule

_____ dependencies are sometimes referred to as soft logic and should be used with care because they may limit later scheduling options. a. Mandatory b. Discretionary c. External d. Inherent

Discretionary

_____ have no duration and no resources but are occasionally needed on AOA network diagrams to show logical relationships between activities.

Dummy activities

_____ is the number of workdays or work hours required to complete a task.

Effort

In project time management, which of the following processes involve calculating the number of work periods that are needed to complete individual activities? a. Defining activities b. Sequencing activities c. Planning schedule management d. Estimating activity durations

Estimating activity durations

Which of the following dependencies involve relationships between project and non-project activities? a. Mandatory b. Discretionary c. External d. Inherent

External

A backward pass through the network diagram determines the early start and early finish dates for each activity.

F

A disadvantage of using Gantt charts is that they do not provide a standard format for displaying planned project schedule information.

F

A merge occurs when one node precedes mutiple nodes.

F

_____ involves the processes required to ensure timely completion of a project.

Project time management

In project time management, which of the following processes primarily involve identifying and documenting the relationships between project activities? a. Defining activities b. Sequencing activities c. Planning schedule management d. Estimating activity durations

Sequencing activities

Which of the following is a relationship in which the "from" activity cannot start until the "to" activity is started? a. Start-to-start b. Finish-to-finish c. Finish-to-start d. Start-to-finish

Start-to-start

A dependency pertains to the sequencing of project activities or tasks.

T

A schedule management plan includes information which describes the format and frequency of schedule reports required for the project.

T

An activity is an element of work that has an expected duration, cost, and resource requirements.

T

It is important for the activity list and activity attributes to be in agreement with the work breakdown structure.

T

Knowing the amount of float allows project managers to know whether a project schedule is flexible.

T

Network diagrams are the preferred technique for showing activity sequencing.

T

Project schedules grow out of basic documents such as the project charter.

T

The critical path on a project can change as the project progresses.

T

The technique of fast tracking can result in lengthening the project schedule.

T

The _____ is based on the fact that any complex system at any point in time often has only one aspect or constraint that limits its ability to achieve more of its goal.

Theory of Constraints (TOC)

Which of the following is true of dummy activities? a. They have long durations. b. They show logical relationships between activities. c. They have a large range of resources. d. They have limited time periods.

They show logical relationships between activities.

A hierarchical structure that identifies the project's resources by category and type is known as a(n) _____.

resource breakdown structure

The main outputs of _____ include work performance measurements, organizational process assets updates, and project document updates.

schedule control

After reviewing the project management plan, project charter, enterprise environmental factors, and organizational process assets, the project team uses expert judgment, analytical techniques, and meetings to develop the ____

schedule management plan

A drawback of using _____ or sample files is that managers and their teams might rely heavily on them and ignore unique concerns for their particular projects.

templates

Which of the following is a difference between an activity list and an activity attribute? a. As opposed to an activity attribute, an activity list provides resource requirements and constraints related to activities. b. An activity list provides a more concrete list of milestones for a project than an activity attribute. c. An activity attribute is a tabulation of activities to be included on a project schedule whereas an activity list is not. d. An activity attribute provides more schedule-related information about each activity than an activity list.

D

A drawback of the precedence diagramming method is that it cannot be used unless dummy activities are employed.

F

A drawback of the project management software is that it does not have the capacity to calculate the critical path(s) for a project.

F

After defining project activities, the next step in project time management is developing the schedule.

F

Critical chain scheduling assumes that resources multitask and maximizes multitasking.

F

In a critical path analysis, the shortest path is what drives the completion date for the project.

F

In a network diagram, it is mandatory for every item on the WBS to be shown instead of only those activities with dependencies.

F

In project time management, one should control the scheule before estimating the duration for each activity.

F

Start-to-finish relationships are the most frequently used dependencies between activities.

F

The final process in project time management is developing the schedule

F

Which of the following is an output of schedule control? a. Lessons-learned reports b. Activity attributes c. Resource requirements d. Milestones list

Lessons-learned reports

Which of the following types of dependencies are inherent in the nature of work being performed on a project? a. Mandatory b. Discretionary c. External d. Random

Mandatory

_____ occurs when a resource works on more than one task at a time.

Multitasking

_____ states that if something can go wrong, it will.

Murphy's Law

A(n) _____ on a project is a significant event that normally has no duration. a. milestone b. activity attribute c. activity sequence d. schedule baseline

milestone


Ensembles d'études connexes

Vinification Chap 7 (élément communs vinification), Chap 8 (Vin blancs et doux), Chap 9 (Vin rouge et rosé)

View Set

consumer behavior study questions

View Set

CH. 16 Mindtap integrated marketing communications

View Set

KNES 371 Chapter 10 Augmented Feedback and Motor Learning

View Set

Mosaik 1 Lektion 2 ,,Checkpoint Charlie"

View Set

Ch. 13: Mutual Funds and Insurance

View Set

Chapter 4: Policy Provisions, Options and Riders (Exam 2)

View Set

Forecasting with the A/F Ratio Method

View Set

Vocabulary Workshop Level B Unit 8 Choosing the Right Word

View Set