Compare and Contrast Project Plans Instruction/Assignment
Most software developers or engineers typically have a bachelor's degree in software engineering or computer science.
True
Which of the following refers to the document that authorizes a project?
project charter
All components need to be coded before September 1.
project constraint
The game design centers on an interactive history simulation of major events in United States history.
project scope
Which of the following would a description of the function of the lighting control room in the theater arts building be part of?
project scope
Student coders will produce modules related to the Civil War, western expansion, and the Industrial Revolution.
project task
Modules of the interactive history game will be evaluated by stakeholders at three key points during the project.
review
Which option distinguishes the software project plan step represented in the following scenario? The project manager for the interactive history game is concerned that the student coders will not complete their modules by August 1.
risks and issues
The interactive history game will be installed on each student's tablet.
software
procurement strategies
the best way to secure results or solutions to meet the needs of projects or end users
implementation plan
the detailed and written report that shows the execution, development, and launch of a product or service
Which of the following explains why engineers use risk registers?
to assess likelihood and consequences of risks
Project engineers manage staff and activities at a construction site.
False
Which of the following is the definition of a constraint?
a limitation on the conditions of a project plan
Which option distinguishes the construction project plan step represented in the following scenario? Milestone estimates for the completion of a new campus theater arts building include foundation, framework, roofing, interior design, and lighting.
budget and cost management
milestone estimates
cost estimates taken at a critical milestone or benchmark in project completion
Each student will be issued a tablet with the Microsoft Windows 8 operating system.
hardware