Failed Questions from tests

Réussis tes devoirs et examens dès maintenant avec Quizwiz!

What element of the PID gives details on who will be involved in the project

Communication management approach

Which option is not a heading in a product description?

Controls

Which report contains details of requests for change.

Highlight report.

Purpose of progress theme?

A purpose of the progress theme is to control any unacceptable deviations from the projects objectives.

Which of the activities of managing product delivery is most likely to cause an update to the risk register?

Accept a work package. S4-2P1

What is the subject of an exception assessment?

An exception plan.

Which aspect of project performance ensures that what the project delivers is consistent with achieving the desired return.

Benefits

Which control has the specific objective to allow the project board to ensure the project remains desirable, viable and achievable at all times?

End Stage Assessment.

In which activity should alternative options to recover from an exception situation be considered?

Escalate issues and risks.

When is the project plan baselined

Everytime the PID is approved and baselined

What is a project board control point

Exception assessment

Who is responsible for approving the project product description

Executive

What is a product description used for in the controlling a stage process?

Forming part of a work package that is passed to a supplier for creation.

In which process are checks made for changes to the project management team?

Managing a stage boundary

Within which process is an assessment made of whether or not the products supplied meet the quality criteria in the product descriptions?

Managing product delivery

What document is input to the project board with a request to deliver the project?

PID (Note delivery and initiation will be important)

Which role advises on suitable reviewers for each quality review?

Project assurance

Who would refer the deviation to corporate, programme managementt or the customer is the project tolerance is blown

Project board

In which documen do acceptance criteria first appear

Project product description

What is a purpose of the benefits management approach

Provides a schedule of activities to measure achievement of benefits.

What is a purpose of the change authority

Reduces the number of requests for change that need to be escalated to the PB

Which is not included in the composition of a project initiation document

Risk register

Acceptance Criteria are defined in which process?

SU

Which role should ensure a project risk management approach is appropriate?

The Executivwe

Which of the following does NOT occur as part of the process IP?

The executive and PM are appointed

Which of the following is not listed as an element of a prince2 plan?

The impact on the business case

What is updated at the end of every stage to reflect progress already madem any agreed changes in sircumstances and any revised forcast deviation

The project plan.

Why should the communication management approach be reviewed in report highlights?

To confirm who required a copy of the report

Which is an objective of the managing delivery process?

To ensure that the work on products is authorized.

What is defined when deciding how to tailor prince2 to suit the project?

When the project's progress will be reviewed.

What occurs during an end stage assesment?

a decision as to whether the project is to proceed to the next stage, some form of corrective action taken and the meeting re-booked for a later date, or that the project is to be stopped.


Ensembles d'études connexes

OTA Chapter 14: Intervention: Planning, Clinical Reasoning, Implementation, and Review (Early)

View Set

Warren Biology 104 Chapter 32 Test

View Set

Healthcare Accounting Final Review

View Set