MQM 227 exam 1 chapt 7
Which of the following is not a basic type of process structure? Product-process matrix Work center Manufacturing cell Assembly line Continuous process
A- Product Process Matrix
Which of the following basic types of process structures is one in which similar equipment or functions are grouped together? Project Work center Manufacturing cell Assembly line Continuous process
B- Work Center
Which of the following basic types of process structures is one in which equipment or work processes are arranged according to the progressive steps by which the product is made? Project Work center Manufacturing cell Assembly line Continuous process
D- Assembly Line
Which of the following is not considered a major work flow structure? Work center Project Assembly line Fabrication Continuous flow
D- Fabrication
The placement of which of the following is not determined by production process organization decisions? Departments Work groups Workstations Machines Emergency exits
E-Emergency Exits
A difference between project and continuous flow categories of process flow structures is which of the following? The size and bulk of the product Discrete parts moving from workstation to workstation Degree of equipment specialization Being a "virtual factory" Profit per unit
A- The size and bulk of a product