PROF PRAC - UAP-IAPOA DOC 210 - M0C
Multiplier
- Overhead Costs of the Office - Fringe Benefits and Social Charges - Fee for Contingencies - Interest on Capital reserves - Reasonable Profit - 1.5 to 2.5
Detailed Architectural Design Services
Architect and allied professionals executing separate contracts with the owner.
Time Basis
Charged on an agreed-to daily or monthly fee.
Design Development Phase
20-40% of RPF
Architect's Liability
5% of RPF
Periodic Construction Supervision
5% of RPF
Contract Document Phase
50-90% of RPF
Group 10 - Expert Witness
5000php per hour
Bidding and Negotiation Phase
90% of RPF
Lump Sum or Fixed Fee
A method with recommendations to include in the Service Agreement a clearly stated time lmit or the performance of services and a provision for additional compensation for extra time used for any changes ordered by the owner after the preliminary design documents have been approved with a clear understanding as to where the final approval authority lies.
Detailed Architectural and Engineering Design Services
A single contract between the architect and owner, and sub-consultancy contracts between the architect and other professionals.
Value-based Pricing or Percentage of Gross Rentals
A value pricing based on outcome of revenue, cost and profitability result of a project management.
Unit Cost Method
A variation on the Percentage Based on Project Construction Cost.
Professional Fee plus Expenses
Establishes an agreed fixed rate or lump sum over and above he reimbursement for the Architect's technical time and overhead.
Overhead
Executive, administrative, accounting, legal, stenographic and clerical salaries and expenses, other than those that are identifiable as salaries including reimbursable non-slaray expenses _ salaries or imputed salaries of patners and principals.
Contract Document Submittal Schedule
Fast track projects require additional fees because the architect may need to hire additional staff.
Percentage Based on Project Construction Cost
Flexible and easy method since if there are changes, the PF of the Architect also adjusts correspondingly without amending the scope of work.
Award Fee Provisions
If the measure cost-related values meet or exceed the specified target values.
Overhead
Library and Periodical expenses and other means of keeping abreast with new technologies.
Retainer
Means of ensuring in advance that an architects services will be available to the client when required.
Percentage Based on Project Construction Cost
Most common method for architectural services world wide.
Percentage Based on Project Construction Cost
Multiplying the specified percentage times the estimated PCC.
SPP Special Committee of the IAPOA
Prepares amendments of UAP-IAPOA Document 210.
Group 6 - Repetitive
RPF is 1st Building: 100% 2nd Building: 50% 3rd Building: 40% 4th Building: 30%
Full-time Supervision Services
RPF is 1-1.5% of PCC
Construction Management Services
RPF is 1.5-3% of PCC
Design-build Services - Guaranteed Maximum Cost
RPF is 10% of PCC exclusive of the architect's fee for Regular Design Services.
Group 8 - Interiors
RPF is 15% of PCC
Comprehensive Architectural Services
RPF is 2-5% of PCC
Post-construction Services
RPF is 4-6% of PCC based in Value-pricing
Group 9 - Renovations
RPF is 50-150% of PCC
Design-build Services - Administration
RPF is 7% of PCC exclusive of the architect's fee for Regular Design Services.
Group 4 - Residential
RPF is: DAEDS: 10% of PCC DADS: 6% of PCC
Group 5 - Monumental
RPF is: DAEDS: 12% of PCC DADS: 7.5% of PCC
Group 7 - Residential with 1 Plan
RPF starts at: DAEDS: 10% of PCC DADS: 6% of PCC
Group 1 - Simple
RPF starts at: DAEDS: 5% of PCC DADS: 3% of PCC
Group 2 - Moderate
RPF starts at: DAEDS: 6% of PCC DADS: 3.6% of PCC
Group 3 - Exceptional
RPF starts at: DAEDS: 7% of PCC DADS: 4.2% of PCC
Recommended Professional Fee
Reference for the professional fee of an Architect based on the building type, the project budget, project delivery, role of consultants, scope of sevices.
Sequential Tendering
Separating contract documents into to receive multiple bids.
Time Basis
Services are difficult to determine in advance or they are interim in nature and often short in duration.
Project Development Cost
Shall include cost of the construction as well as all professional fees, permits, clearances and utilities and cost of acquiring the project site / lot, cost of money, etc.
Construction Technologies
Sometimes this request can be costly as there are often unknown risks in using products or systems that do not have a track record.
Unit Cost Method
That is based on cost per square meter of the project such as room, store, buildings or other units.
Firm Fixed Price
The fee will be unaffected by variations between the estimate and the bids or by change orders during construction.
Price Adjustment Provisions
The operating and support cost factor provision provides a direct incentive on operating and support costs.
Cost Plus Fixed Fee
The owner will pay the CM a fixed fee plus reimbursement of certain expenses incurred in the performance of basis services.
Fixed Price Incentive
The owner will pay the construction manager a fixed fee which is adjusted according to the difference between the final allowable costs and the target costs.
Retainer
The services of an architect are not required on a full-time basis.
Project Documentation
The use of Building Information Model
Salary Cost times a multiplier plus direct cost or reimbursable expenses.
This method of remuneration is best suited for projects for which the cost are difficult to predetermine or in cases where it may become necessary to undertake additional experimental or investigative work.
Lump Sum or Fixed Fee
Used when the scope of the services required can be clearly and fully defined at the outset of the project.
Awarded Project Construction Cost
Using the bid of a winning contractor.
Probable Project Construction Cost
Using unit price parameters per square meter established on the date of the signing of the Service Agreement.
Time Basis
Usually used for pre-design services, partial services, additional services, expert witness servicess,PACS.
Value-based Pricing or Percentage of Gross Rentals
Usually used method in retail facilities, leasing in housing or commercial office or residence developments.
Overhead
Business development expenses, including salaries of principals and salary costs of employees so engaged.
Overhead
- Office light Airconditioning - Depreciation Allowances or Rental of Furniture - Vehicle and traveled-related experiences - Office Supplies - Taxes and Insurances
Architectural Interior, Acoustic, Lighting and Site Development Planning
10-15% of Cost of Work
Group 10 - Consultation
1000php per hour
Schematic Design Phase
15-20% of RPF
Final Project Construction Cost
Based on the cost records that will be submitted to the architect upon completion of the project.
Project Construction Cost
Cost of Work, cost of materials are part of this. Does not include any fees for the Architect, the Engineer and Specialist Consultants.
Project Construction Cost
Cost of completed building to the owner, incuding structure + allied instalation as prepared by Architect and Consultants.
Cost plus Incentive Fee or Cost Plus Adjusted Fee
Cost reimbursement type contracts with provisions for a fee that is adjusted by sharing formulas applied to the difference between the final allowable costs and the target costs.
Third Party Certification
LEED, GREEN and BERDE
Pre-design Services
The architect requests a 5% acceptance fee based on the service agreement.
Construction Bid Mode
The architectural design and construction documents are completed and one single bid package is prepared.
Construction Management Contracting Concepts
To motivate the Construction Manager to reduce acquisition and operating costs.
Direct Personnel Cost
Total Cost considering the rate of the Architect, the Consultant, Technical Staff, Researchers and other involved in the Project per Hour (man-hours) per day or per month.