PROF PRAC - UAP-IAPOA DOC 210 - M0C

Pataasin ang iyong marka sa homework at exams ngayon gamit ang Quizwiz!

Multiplier

- Overhead Costs of the Office - Fringe Benefits and Social Charges - Fee for Contingencies - Interest on Capital reserves - Reasonable Profit - 1.5 to 2.5

Detailed Architectural Design Services

Architect and allied professionals executing separate contracts with the owner.

Time Basis

Charged on an agreed-to daily or monthly fee.

Design Development Phase

20-40% of RPF

Architect's Liability

5% of RPF

Periodic Construction Supervision

5% of RPF

Contract Document Phase

50-90% of RPF

Group 10 - Expert Witness

5000php per hour

Bidding and Negotiation Phase

90% of RPF

Lump Sum or Fixed Fee

A method with recommendations to include in the Service Agreement a clearly stated time lmit or the performance of services and a provision for additional compensation for extra time used for any changes ordered by the owner after the preliminary design documents have been approved with a clear understanding as to where the final approval authority lies.

Detailed Architectural and Engineering Design Services

A single contract between the architect and owner, and sub-consultancy contracts between the architect and other professionals.

Value-based Pricing or Percentage of Gross Rentals

A value pricing based on outcome of revenue, cost and profitability result of a project management.

Unit Cost Method

A variation on the Percentage Based on Project Construction Cost.

Professional Fee plus Expenses

Establishes an agreed fixed rate or lump sum over and above he reimbursement for the Architect's technical time and overhead.

Overhead

Executive, administrative, accounting, legal, stenographic and clerical salaries and expenses, other than those that are identifiable as salaries including reimbursable non-slaray expenses _ salaries or imputed salaries of patners and principals.

Contract Document Submittal Schedule

Fast track projects require additional fees because the architect may need to hire additional staff.

Percentage Based on Project Construction Cost

Flexible and easy method since if there are changes, the PF of the Architect also adjusts correspondingly without amending the scope of work.

Award Fee Provisions

If the measure cost-related values meet or exceed the specified target values.

Overhead

Library and Periodical expenses and other means of keeping abreast with new technologies.

Retainer

Means of ensuring in advance that an architects services will be available to the client when required.

Percentage Based on Project Construction Cost

Most common method for architectural services world wide.

Percentage Based on Project Construction Cost

Multiplying the specified percentage times the estimated PCC.

SPP Special Committee of the IAPOA

Prepares amendments of UAP-IAPOA Document 210.

Group 6 - Repetitive

RPF is 1st Building: 100% 2nd Building: 50% 3rd Building: 40% 4th Building: 30%

Full-time Supervision Services

RPF is 1-1.5% of PCC

Construction Management Services

RPF is 1.5-3% of PCC

Design-build Services - Guaranteed Maximum Cost

RPF is 10% of PCC exclusive of the architect's fee for Regular Design Services.

Group 8 - Interiors

RPF is 15% of PCC

Comprehensive Architectural Services

RPF is 2-5% of PCC

Post-construction Services

RPF is 4-6% of PCC based in Value-pricing

Group 9 - Renovations

RPF is 50-150% of PCC

Design-build Services - Administration

RPF is 7% of PCC exclusive of the architect's fee for Regular Design Services.

Group 4 - Residential

RPF is: DAEDS: 10% of PCC DADS: 6% of PCC

Group 5 - Monumental

RPF is: DAEDS: 12% of PCC DADS: 7.5% of PCC

Group 7 - Residential with 1 Plan

RPF starts at: DAEDS: 10% of PCC DADS: 6% of PCC

Group 1 - Simple

RPF starts at: DAEDS: 5% of PCC DADS: 3% of PCC

Group 2 - Moderate

RPF starts at: DAEDS: 6% of PCC DADS: 3.6% of PCC

Group 3 - Exceptional

RPF starts at: DAEDS: 7% of PCC DADS: 4.2% of PCC

Recommended Professional Fee

Reference for the professional fee of an Architect based on the building type, the project budget, project delivery, role of consultants, scope of sevices.

Sequential Tendering

Separating contract documents into to receive multiple bids.

Time Basis

Services are difficult to determine in advance or they are interim in nature and often short in duration.

Project Development Cost

Shall include cost of the construction as well as all professional fees, permits, clearances and utilities and cost of acquiring the project site / lot, cost of money, etc.

Construction Technologies

Sometimes this request can be costly as there are often unknown risks in using products or systems that do not have a track record.

Unit Cost Method

That is based on cost per square meter of the project such as room, store, buildings or other units.

Firm Fixed Price

The fee will be unaffected by variations between the estimate and the bids or by change orders during construction.

Price Adjustment Provisions

The operating and support cost factor provision provides a direct incentive on operating and support costs.

Cost Plus Fixed Fee

The owner will pay the CM a fixed fee plus reimbursement of certain expenses incurred in the performance of basis services.

Fixed Price Incentive

The owner will pay the construction manager a fixed fee which is adjusted according to the difference between the final allowable costs and the target costs.

Retainer

The services of an architect are not required on a full-time basis.

Project Documentation

The use of Building Information Model

Salary Cost times a multiplier plus direct cost or reimbursable expenses.

This method of remuneration is best suited for projects for which the cost are difficult to predetermine or in cases where it may become necessary to undertake additional experimental or investigative work.

Lump Sum or Fixed Fee

Used when the scope of the services required can be clearly and fully defined at the outset of the project.

Awarded Project Construction Cost

Using the bid of a winning contractor.

Probable Project Construction Cost

Using unit price parameters per square meter established on the date of the signing of the Service Agreement.

Time Basis

Usually used for pre-design services, partial services, additional services, expert witness servicess,PACS.

Value-based Pricing or Percentage of Gross Rentals

Usually used method in retail facilities, leasing in housing or commercial office or residence developments.

Overhead

Business development expenses, including salaries of principals and salary costs of employees so engaged.

Overhead

- Office light Airconditioning - Depreciation Allowances or Rental of Furniture - Vehicle and traveled-related experiences - Office Supplies - Taxes and Insurances

Architectural Interior, Acoustic, Lighting and Site Development Planning

10-15% of Cost of Work

Group 10 - Consultation

1000php per hour

Schematic Design Phase

15-20% of RPF

Final Project Construction Cost

Based on the cost records that will be submitted to the architect upon completion of the project.

Project Construction Cost

Cost of Work, cost of materials are part of this. Does not include any fees for the Architect, the Engineer and Specialist Consultants.

Project Construction Cost

Cost of completed building to the owner, incuding structure + allied instalation as prepared by Architect and Consultants.

Cost plus Incentive Fee or Cost Plus Adjusted Fee

Cost reimbursement type contracts with provisions for a fee that is adjusted by sharing formulas applied to the difference between the final allowable costs and the target costs.

Third Party Certification

LEED, GREEN and BERDE

Pre-design Services

The architect requests a 5% acceptance fee based on the service agreement.

Construction Bid Mode

The architectural design and construction documents are completed and one single bid package is prepared.

Construction Management Contracting Concepts

To motivate the Construction Manager to reduce acquisition and operating costs.

Direct Personnel Cost

Total Cost considering the rate of the Architect, the Consultant, Technical Staff, Researchers and other involved in the Project per Hour (man-hours) per day or per month.


Kaugnay na mga set ng pag-aaral

Exam 4 (Chapter 49) Assessment and MGMT of Pt's w/Hepatic Disorders

View Set

ARRT The Male Pelvis - Chapter 13 (Review Questions)

View Set

Social Psych practice test #3 for exam 1

View Set

ECO C. 10 Pure Competition in the Short Run

View Set

psych 1010 ch. 9 developmental psychology

View Set