26) Explain what is Bug triage

A bug triage is a process to Ensure bug report completeness Assign and analyze the bug Assigning bug to proper bug owner Adjust bug severity properly Set appropriate bug priority.

28) What is a cause effect graph

A cause effect graph is a graphical representation of inputs and the associated outputs effects that can be used to design test cases.

24) List out the roles of Software Quality Assurance engineer

A software quality assurance engineer tasks may include following things amongst others Writing source code Software design Control of source code Reviewing code Change management Configuration management Integration of software Program testing Release management process.

30) Explain what is traceability matrix

A test matrix is used to map test scripts to requirements.

21) What is thread testing

A thread testing is a top-down testing, where the progressive integration of components follows the implementation of subsets of the requirements, as opposed to the integration of components by successively lower levels.

12) What is Agile testing and what is the importance of Agile testing

Agile testing is software testing, is testing using Agile Methodology. The importance of this testing is that, unlike normal testing process, this testing does not wait for the development team to complete the coding first and then doing testing. The coding and testing both goes simultaneously. It requires continuous customer interaction.

5) What is bug leakage and bug release

Bug release is when software or an application is handed over to the testing team knowing that the defect is present in a release. During this the priority and severity of bug is low, as bug can be removed before the final handover. Bug leakage is something, when the bug is discovered by the end users or customer, and not detected by the testing team while testing the software.

3) What is the difference between build and release

Build: It is a number given to Installable software that is given to the testing team by the development team. Release: It is a number given to Installable software that is handed over to the customer by the tester or developer.

20) What is CRUD testing and how to test CRUD

CRUD stands for Create, Read, Update and Delete. CRUD testing can be done using SQL statements.

6) What is data driven testing

Data driven testing is an automation testing framework, which tests the different input values on the AUT. These values are read directly from the data files. The data files may include csv files, excel files, data pools and many more.

29) What is a Test Metric in software testing and what information does it contains

In software testing, Test Metric is referred to the standard of test measurement. They are the statistics narrating the structure or content of a testing. It contains information like Total test Test run Test passed Test failed Tests deferred Test passed the first time.

22) What is configuration management

It is a process to control and document any changes made during the life of a project. Release control, Change control and Revision control are the important aspects of configuration management.

23) What is Ad Hoc testing

It is a testing phase where the tester tries to break the system by randomly trying the system's functionality. It can include negative testing as well.

17) Explain stress testing, load testing and volume testing

Load Testing: Testing an application under heavy but expected load is known as Load Testing. Here, the load refers to the large volume of users, messages, requests, data, etc. Stress Testing: When the load placed on the system is raised or accelerated beyond the normal range then it is known as Stress Testing. Volume Testing: The process of checking the system, whether the system can handle the required amounts of data, user requests, etc. is known as Volume Testing.

36) Explain what is MR and what information does MR consists of

MR stands for Modification Request also referred as Defect report. It is written for reporting errors/problems/suggestions in the software.

4) What are the automation challenges that SQA(Software Quality Assurance) team faces while testing

Mastering the automation tool Reusability of Automation script Adaptability of test case for automation Automating complex test cases

7) Explain the steps for Bug Cycle

Once the bug is identified by the tester, it is assigned to the development manager in open status If the bug is a valid defect the development team will fix it. If it is not a valid defect, the defect will be ignored and marked as rejected The next step will be to check whether it is in scope. If the bug is not the part of the current release then the defects are postponed If the defect or bug is raised earlier then the tester will assign a DUPLICATE status When bug is assigned to developer to fix, it will be given a IN-PROGRESS status Once the defect is repaired, the status will change to FIXED at the end the tester will give CLOSED status if it passes the final test

35) Explain what should your QA documents include

QA testing document should include List the number of defects detected as per severity level Explain each requirement or business function in detail Inspection reports Configurations Test plans and test cases Bug reports User manuals Prepare separate reports for managers and users.

31) Explain what is the difference between Regression testing and Retesting

Retesting is carried out to check the defects fixes, while regression testing is performed to check whether the defect fix have any impact on other functionality.

16) What are the tools used by a tester while testing

Selenium Firebug OpenSTA WinSCP YSlow for FireBug Web Developer toolbar for firebox. Above are just sample tools. The tools a Tester may vary with his/her project.

18) What are the five common solutions for software developments problems

Setting up the requirements criteria, the requirements of a software should be complete, clear and agreed by all The next thing is the realistic schedule like time for planning , designing, testing, fixing bugs and re-testing Adequate testing, start the testing immediately after one or more modules development. Use rapid prototype during design phase so that it can be easy for customers to find what to expect Use of group communication tools.

37) What does the software QA document should include

Software QA document should include Specifications Designs Business rules Configurations Code changes Test plans Test cases Bug reports User manuals, etc.

32) List out the software quality practices through the software development cycle

Software quality practices includes Review the requirements before starting the development phase Code Review Write comprehensive test cases Session based testing Risk based testing Prioritize bug based on usage Form a dedicated security and performance testing team Run a regression cycle Perform sanity tests on production Simulate customer accounts on production Include software QA Test Reports

13) What is Test case

Test case is a specific condition to check against the Application Under Test. It has information of test steps, prerequisites, test environment, and outputs.

11) What are the contents of test plans and test cases

Testing objectives Testing scope Testing the frame The environment Reason for testing The criteria for entrance and exit Deliverables Risk factors

2) What is Testware

Testware is test artifacts like test cases, test data, test plans needed to design and execute a test.

19) What is a 'USE' case and what does it include

The document that describes, the user action and system response, for a particular functionality is known as USE case. It includes revision history, table of contents, flow of events, cover page, special requirements, pre-conditions and post-conditions.

1) What is the difference between the QA and software testing

The role of QA (Quality Assurance) is to monitor the quality of the "process" used to produce the software. While the software testing, is the process of ensuring the functionality of final product meets the user's requirement.

33) Explain what is the rule of a "Test Driven Development"

The rule of a Test Driven Development is to prepare test cases before writing the actual code. Which means you are actually be writing code for the tests before you write code for the application.

14) What is the strategy for Automation Test Plan

The strategy for Automation Test Plan Preparation of Automation Test Plan Recording the scenario Error handler incorporation Script enhancement by inserting check points and looping constructs Debugging the script and fixing the issues Rerunning the script. Reporting the result

34) Mention what are the types of documents in SQA

The types of documents in SQA are Requirement Document Test Metrics Test cases and Test plan Task distribution flow chart Transaction Mix User profiles Test log Test incident report Test summary report

25) Explain what are test driver and test stub and why it is required

The stub is called from the software component to be tested. It is used in top down approach The driver calls a component to be tested. It is used in bottom up approach It is required when we need to test the interface between modules X and Y and we have developed only module X. So we cannot just test module X but if there is any dummy module we can use that dummy module to test module X.

15) What is quality audit

The systematic and independent examination for determining the effectiveness of quality control procedures is known as the quality audit.

8) What does the test strategy include

The test strategy includes an introduction, resource, scope and schedule for test activities, test tools, test priorities, test planning and the types of test that has to be performed.

10) What is branch testing and what is boundary testing

The testing of all the branches of the code, which is tested once, is known as branch testing. While the testing, that is focused on the limit conditions of the software is known as boundary testing.

27) List out various tools required to support testing during development of the application

To support testing during development of application following tools can be used Test Management Tools: JIRA, Quality Center etc. Defect Management Tools: Test Director, Bugzilla Project Management Tools: Sharepoint Automation Tools: RFT, QTP, and WinRunner.

9) Mention the different types of software testing

Unit testing Integration testing and regression testing Shakeout testing Smoke testing Functional testing Performance testing White box and Black box testing Alpha and Beta testing Load testing and stress testing System testing

38) Mention how validation activities should be conducted

Validation activities should be conducted by following techniques Hire third party independent verification and validation Assign internal staff members that are not involved in validation and verification activities Independent evaluation.