STUDY GUIDE (MG)
Question: 41 How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 Correct answers to this question. A. Increase the capacity supply in a time-phased interval. B. Determine a time period with available capacity on the planning board. C. Execute an infinite production planning run for the critical resources. D. Reduce the planning Window. E. Form optimum sequence to reduce setup times.
- Increase the capacity supply in a time-phased interval. - Determine a time period with available capacity on the planning board. - Form optimum sequence to reduce setup times. Book 1 pg.440 Fig 244
What information do you have to maintain to define the relationship between supply source and demand source in the Kanban process? ○ Production supply area (Book 4: Page 208) ○ Routing ○ Work Center ○ Replenishment strategy
-Production supply area -Replenishment strategy
Question: 40 What does a line hierarchy in repetitive manufacturing represent? A. A production line with more than one work center B. A production line with prioritized work centers C. A production line with a parallel sequence in the routing D. A production line with an alternative sequence in the routing
A. A production line with more than one work center
Question: 46 You Have a scheduling agreement with a vendor, you want classic MRP to automatically create schedule lines in case of material shortage, what must you do? Note: there are 2 correct answers to this question. A. Add the agreement to the source list and mark it for MRP relevance. B. Set the creation indicator for purchase requisition on the initial screen of the MRP run. C. Add the agreement to the quota arrangement and mark it for MRP relevance. D. Set the creation indicator for delivery schedule lines on the initial screen the MRP run.
A. Add the agreement to the source list and mark it for MRP relevance. D. Set the creation indicator for delivery schedule lines on the initial screen the MRP run.
Question: 80 How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question, A. By Plant B. By Period C. By Industry D. By Material Status
A. By Plant B. By Period
Question: 24 You want to set up a make-to-order planning scenario for a finished material. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements Forecasting for the finished product is NOT possible. Which settings do you make to achieve this? A. Choose planning strategy 50 (Planning without final assembly) and select the — corresponding Individual/Collective indicator. B. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator. C. Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator. D. Choose planning strategy 20 (Make-to-Order) and select the corresponding individual/Collective indicator.
A. Choose planning strategy 50 (Planning without final assembly) and select the — corresponding Individual/Collective indicator.
Question: 20 How can you set up a material as a phantom assembly? Note: There are 2 correct answers to this question A. Define the special procurement type inside the material master. B. Change the item category of the phantom assembly in the bill of material (BOM) C. Define the special procurement type inside the BOM p.390 D. Change the phantom item indicator for the phantom assembly in the bill of material (BOM)
A. Define the special procurement type inside the material master. C. Define the special procurement type inside the BOM D. Change the phantom item indicator for the phantom assembly in the bill of material (BOM) SAP buddy has C. Define the special procurement type inside the BOM "Use a special item category in your BOM"
Question: 6 For production orders, cost object controlling (COC) can be carried out on an order-related or product- related basis. Which of the following do you have to consider? Note: There are 2 correct answers to this question. A. In product-related COC, all costs are debited and credited to a product cost collector. B. Order-related COC is beneficial in a flexible production environment C. Product-related COC is used in manufacturing for co-products D. In order-related COC, individual production orders do NOT have cost segments. (SAP Buddy doesn't have this question)
A. In product-related COC, all costs are debited and credited to a product cost collector. B. Order-related COC is beneficial in a flexible production environment Book 1 pg.456-458 fig87
Question: 74 What data can you maintain in the subitems of a bill of material (BOM)? Note: There are 2 correct answers to this question. A. Installation point (SAP Buddy has but it is not in SAP) B. Item type C. Quantity D. Scrap percentage
A. Instillation point C. Quantity
Question: 34 which SAP application can be used for forecasting in Supply Chain Planning? Note: there are 2 correct answers to this question. A. Integration Business Planning (IBP) B. Capacity Requirement Planning (CRP) C. Supply Chain Management (SCM) D. Material Requirement Planning (MRP)
A. Integration Business Planning (IBP) C. Supply Chain Management (SCM)
Question: 2 Which of the following questions do you have to answer before you start creating a bill of material (BOM)? A. Is the material type allowed in the BOM? B. Which base unit of measure does the material have? C. What status does the BOM have? D. In which storage location is the BOM required?
A. Is the material type allowed in the BOM? C. What status does the BOM have? Other possible Qs: -Does a material master exist for the BOM header -What is the BOM going to be used for? -Is this material type allowed in the BOMs? -In which plant is the BOM required? -When does the BOM need to become effective? -Does the material belong to a BOM group? -What status does the BOM have? -Are there default values?
Question: 52 Which master data fields can have an impact on whether MRP creates planned orders or purchase requisitions for a material? Note: There are 2 Correct answers to this question? A. MRP Groups B. Material Type C. MRP type (if its consumption based or forecast-based) D. Procurement Type
A. MRP Groups D. Procurement Type SAP Buddy says MRP group and procurement type
Question: 54 Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, this must NOT have any impact on the production program. Which planning strategy do you use? A. Make-to-stock production (10) B. Planning with final assembly (40) -> has consumption C. Make-to-stock production (20) D. Planning without final assembly (50)
A. Make-to-stock production (10)
Question: 8 Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA. Note: there are 2 correct answers to this question. A. Manual maintenance B. 100% check C. First in First out (FIFO). D. Simultaneous
A. Manual maintenance B. 100% check
Question: 23 You need to model goods receipt processing time in detailed scheduling. Which modeling options do you have? Note: There are 3 correct answers to this question. A. Model a separate resource in the production data structure. B. Model a handling resource in the location master. C. Model a transportation lane and carrier selection in the location master. D. Model a separate inbound resource in the location master. E. Model a goods receipt time in the material master.
A. Model a separate resource in the production data structure. B. Model a handling resource in the location master. E. Model a goods receipt time in the material master. SAP Buddy has (same thing) "Define a suitable process in the production data structure." ○ Define a handling resource in the location master ○ Define a goods receipt time in the material master
Question: 14 Which time elements are part of a routing operation? Note: There are 3 correct answers to this question. A. Move Time B. Pick/pack time C. Setup time D. Float before production E. Queue time
A. Move Time C. Setup time E. Queue time Book 1 pg. 162 "The duration of an operation comprises a max of 5 time elements: Queue time, setup time, processing time, teardown time, wait time"
Question: 21 You are trying to create a production order and NO valid production version can be selected. What could be the reasons? Note: There are 2 correct answers to this question. A. NO bills of material (BOMs) are assigned to the production versions. B. All production versions for the material are locked. C. The order lot size is NOT within the validity range of a production version. D. NO production lines are assigned to the production versions.
A. NO bills of material (BOMs) are assigned to the production versions. B. All production versions for the material are locked C. The order lot size is NOT within the validity range of a production version. SAP buddy has: A. NO bills of material (BOMs) are assigned to the production versions. C. The order lot size is NOT within the validity range of a production version.
Question: 61 What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question A. One-off events B. Past quotation quantities C. Past sales order quantities D. Market intelligence E. Past production planning quantities
A. One-off events C. Past sales order quantities D. Market intelligence
Question: 58 which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 Correct answers to this question. A. Posting of production costs to the production cost collector B. posting of goods receipt for the product C. Reduction of associated capacity requirements D. Archiving of document for assembly scrap E. Material staging for next order in sequence
A. Posting of production costs to the production cost collector B. posting of goods receipt for the product C. Reduction of associated capacity requirements SAP Buddy has: ○ Update statistics for the Business Information Warehouse ○Reduce run schedule quantities ○ Create a data entry document
Question: 45 Which information is required when you create a product master in SAP S/4HANA? Note: There are 2 correct answers to this question. A. Product type (same as material type) B. Selection screen for views C. Selection screen for plants D. Base unit of measure (says you don't do this until you get inside)
A. Product type (same as material type) D. Base unit of measure Berni thinks B
Question: 4 What time element of midpoint scheduled operations can be reduced by reduction strategy settings while dispatching? Note: There are 2 correct answers to this question A. Queue B. Teardown time C. Move time D. Setup Time
A. Queue C. Move time pg.512 Unit 9 Book 3 Fig 193 "Queue time, move time, float before/after production"
Question: 12 Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question. A. Routing B. Work Center C. Bill of material (BOM) D. Material Master
A. Routing B. Work Center
Question: 47 What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 2 correct answers to this question. A. Scheduling agreement schedule line B. Purchase Order C. Planned Order D. Production Order
A. Scheduling agreement schedule line C. Planned Order
Question: 28 What could be the reason for multiple commitments, where several operations have the same scheduled dates on a work center after dispatching? Note: There are 2 correct answers to this question. A. The Finite Scheduling indicator is NOT set in the strategy profile. B. The work center has several individual capacities C. The Change Planning Direction indicator is set in the strategy profile D. Alternative work centers are fully occupied.
A. The Finite Scheduling indicator is NOT set in the strategy profile. B. The work center has several individual capacities
Question: 57 For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question. A. The deletion flag must NOT be set for the bill of material (BOM) or the routing B. The lot size range must be within the lot size range of the assigned routing. C. The assigned routing and bill of material (BOM) must be valid in the entire validity period. D. The assigned routing must be a rate routing. E. The assigned routing must NOT have alternative sequences
A. The deletion flag must NOT be set for the bill of material (BOM) or the routing B. The lot size range must be within the lot size range of the assigned routing. C. The assigned routing and bill of material (BOM) must be valid in the entire validity period. Book 1 pg.128 Fig 25
Question: 15 You can you use capacity availability checks for production orders, which settings have to be made for this? Note: There are 2 Correct answers to this question? A. The relevant for finite scheduling indicator must be set. B. A checking rule must be assigned to the work centers C. An overall profile must be assigned in the checking control D. The scope of check must be defined in customizing.
A. The relevant for finite scheduling indicator must be set. C. An overall profile must be assigned in the checking control Book 1 pg.193 Fig 46
Question: 19 How can you characterize dependent requirements in material requirements planning? Note: There are 2 correct answers to this question. A. They are created with exact times in Advanced Planning. B. They are created when an independent requirement is created for the finished product. C. They are created on assembly level during the planning run. D. They are only created for multilevel bill of material (BOM) structures
A. They are created with exact times in Advanced Planning. C. They are created on assembly level during the planning run.
Question: 68 What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 Correct answers to this question? A. To determine the work in progress along the production line B. To provide timely updates of inventory management for the staged components C. To reduce the total production lead time for a long production line D. To stage different components for a production line simultaneously
A. To determine the work in progress along the production line B. To provide timely updates of inventory management for the staged components SAP Buddy crossed this q out but has: ○ Defining the relevant work centers in the routing ○ Defining the operations as reporting points using the control key
Question: 69 Generic Parent » Generic 1 pt What is the purpose of collective orders? A. To manage production orders for an entire finished product on multiple levels B. To combine order management of co-products and by-products with the main product C. To post production costs on a cost collector instead of the production order D. To post any component withdrawal as single backflush with order confirmation
A. To manage production orders for an entire finished product on multiple levels
Question: 75 Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP/DS)? A. Use a propagation range. B. Use a resource group C. Use a planning area. D. Use a planning group.
A. Use a propagation range. *needs to be checked
Question: 76 in your Plant, MRP is activated. which options do you have to exclude a material from the MRP run? Note: there are 2 correct answers to this question. A. Use a specific material status B. Use a specific material group C. Use a specific MRP type D. Use a specific MRP list
A. Use a specific material status C. Use a specific MRP type
Question: 27 How can you set up the supply source for the Kanban process in SAP S/4HANA? Note: There are 3 correct answers to this question. A. Use stock transfer reservations for stock transfer. B. Use purchase orders for external procurement. C. Use quotations for internal and external procurement D. Use run schedule quantities for in-house production. E. Use purchasing costs for automated source prioritization.
A. Use stock transfer reservations for stock transfer. B. Use purchase orders for external procurement. D. Use run schedule quantities for in-house production.
Question: 56 Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks? Note: There are 2 correct answers to this question. A. Use the Batch Information Cockpit. B. Use batch derivation. C. Use batch determination D. Use the batch where-used list.
A. Use the Batch Information Cockpit. D. Use the batch where-used list.
Question: 3 Advanced Planning uses master data and transaction data from SAP S/4HANA In which data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question. A. Work Center B. Production Version C. Material D. plant
A. Work Center C. Material
Question: 13 What are the options if the Dispatched operation status is set for a production order operation? Note: There are 2 correct answers to this question. A. You can reschedule the operation using finite scheduling in a planning table. B. You can reschedule the operation in the Manage Production Operations app. C. You can reschedule the operation using infinite scheduling in a planning table D. You can reschedule the operation using midpoint scheduling in a planning table.
A. You can reschedule the operation using finite scheduling in a planning table. B. You can reschedule the operation in the Manage Production Operations app. (manage work center capacity app)
Question: 66 where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 Correct answers to this question. A. in the bill of material (BOM) B. in the work centers C. in the MRP controller D. In the routing E. in the production version
A. in the bill of material (BOM) D. In the routing E. in the production version
Question: 5 Which time elements are relevant for lead time scheduling of a production order? Note: There are 2 correct answers to this question. A. setup time B. Opening Period C. float after production D. Total replenishment lead time
A. setup time C. float after production "floats that are assigned to the material and individual times from the task list: queue times, setup times, labor times, and machine times"
Question: 43 which of the following automation options can you use for production orders? Note: There are 2 Correct answers to this question? A. you can use mass processing to set production orders to technically complete B. you can use the production scheduling profile to automatically set orders to technically complete C. You can use trigger points to automatically create rework orders via confirmation. D. You can use mass processing to read PP master data for production orders
A. you can use mass processing to set production orders to technically complete C. You can use trigger points to automatically create rework orders via confirmation.
Question: 35 What is the work center hierarchy in capacity planning? A. A group of work center in a parallel sequence that is used to split production quantities and work on them in parallel B. A group of alternative work centers providing a cumulative available capacity for production C. A group of work centers in a production line being used in sequence for production D. A group of alternative work centers for production, structured in hierarchy levels by priorities
B. A group of alternative work centers providing a cumulative available capacity for production
Question: 53 How would you define pegging in the context of Advanced Planning? A. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements B. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements C. An evaluation to verify if there are material or capacity shortages in the network after the production planning run D. D. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run
B. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements
Question: 65 Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question. A. Create an object selection variant for priority-category-related alerts. B. Assign the alert profile to the overall profile. C. Create an object selection variant for production-planning-related alerts. D. Assign the overall profile to the authorization profile.
B. Assign the alert profile to the overall profile. C. Create an object selection variant for production-planning-related alerts.
Question: 18 Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA? Note: There are 2 correct answers to this question. A. Order (pool) chart B. Capacity requirements chart C. Work center capacities chart D. Orders (dispatched) chart
B. Capacity requirements chart C. Work center capacities chart
Question: 9 Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question. A. Changing the storage bin in warehouse management B. Changing the procurement type in the product master C. Changing the operation times in the production data structure D. Changing the stock in inventory management E. Changing the purchasing contract in materials management
B. Changing the procurement type in the product master C. Changing the operation times in the production data structure D. Changing the stock in inventory management book 1 fig 221 creation of a sales order Creation of dependent req "MRP relevant changes could be newly created sales orders, dependent req, or stock changes, but might also be changes to the procurement type in the product master or changes to the procurement type in the product master or changes to the operation times in the PDS and so on"
Question: 17 You want to reduce planning efforts for B and C materials. Which planning procedure do you recommend? A. Manual Planning Without Check B. Consumption-Based Planning C. Material Requirements Planning D. Advanced Planning
B. Consumption-Based Planning (if mult. answers also choose MRP --> SAP buddy has) pg. 421 pt 2 pg.125
Question: 77 How can you support a GMP (Good Manufacturing Practice)-compliant production process? Note: There are 3 correct answers to this question. A. Approved resources B. Digital signature C. Batch record D. GMP-compliant flag E. Recipe approval
B. Digital signature C. Batch record E. Recipe approval
Question: 55 What could be the reason for different combinations of components in a multiple bill of material (BOM)? Note: There are 2 correct answers to this question. A. BOM header status B. Manufacturing date C. Lot size D. BOM item status
B. Manufacturing date C. Lot size SAP Buddy has B. Manufacturing date but it has nothing to do with BOM
Question: 25 What do you need to consider when working with material master numbering in SAP S/4HANA? Note: There are 2 correct answers to this question. A. Material numbering is defined cross-client. B. Material numbering is defined at client level. C. The maximum material number length is 18 for external numbers and 18 for internal numbers. D. The maximum material number length is 40 for external numbers and 18 for internal numbers
B. Material numbering is defined at client level. D. The maximum material number length is 40 for external numbers and 18 for internal numbers SAP Buddy has --> The material number interval is directly assigned to material types
Question: 59 You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past? A. Kanban B. Material requirements planning C. Backflushing D. Production order release
B. Material requirements planning
Question: 39 Which time elements can be reduced by a reduction strategy? Note: There are 3 correct answers to this question. A. Goods receipt processing time B. Move time C. Wait time D. Float after production E. Queue time Book 4 pg. 512 fig. 192
B. Move time D. Float after production E. Queue time "You can reduce the:..." -float before production -float after production -queue times -move times
Question: 48 Your project team decided to use a make-to-order planning strategy material in discrete manufacturing. what is the impact of this decision? Note: there are 2 correct answers to this question A. Storage Location MRP areas are required for sales-orders-specific stock. B. Net requirement calculation is carried out for every sales order individually. C. Both the reduction of make-to-order stock and requirements occur on delivery D. Sales orders have to be ATP-confirmed (available-to-promise) to saved. E. Production orders are created with sales order reference.
B. Net requirement calculation is carried out for every sales order individually. C. Both the reduction of make-to-order stock and requirements occur on delivery E. Production orders are created with sales order reference.
Question: 10 What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question. A. Order type B. Planning strategy C. Requirements Class D. Requirements type
B. Planning strategy C. Requirements type
Question: 38 What are some benefits of planning with planned independent requirements? Note: There are 2 correct answers to this question. A. Reduced production times B. Reduced delivery times C. Option to use make-to-order production D. Option to forecast planning for production resources
B. Reduced delivery times D. Option to forecast planning for production resources
Question: 79 Your project uses process orders for the production of liquid chemicals. What can you define to ensure that production flow only happens in suitable and physically connected tanks? Note: There are 2 correct answers to this question. A. Resource matrix B. Resource network C. Resource hierarchy D. Resource selection
B. Resource network D. Resource selection SAP buddy doesn't have this q
Question: 42 Which options do you have to plan both quantities and capacities during line loading in repetitive manufacturing? Note: There are 2 Correct answers to this question? A. Run MRP with quota arrangement B. Run PP/DS heuristic for repetitive manufacturing C. Assign planned orders manually in the planning table D. Assign planned orders manually in the planning table
B. Run PP/DS heuristic for repetitive manufacturing C. Assign planned orders manually in the planning table
Question: 32 Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question. A. Forecast key figures B. Safety Stock C. Maximum stock level D. Purchase orders
B. Safety Stock D. Purchase orders
Question: 64 What will happen in the MRP run if you have created a new MRP-relevant material that supports both in-house production and external procurement? A. The MRP run assumes external procurement. B. The MRP run assumes in-house production. C. The MRP run does NOT consider the material; it has to be planned interactively D. The MRP run plans the material only if a quotation has been maintained.
B. The MRP run assumes in-house production.
Question: 30 You want to insert an operation at a certain time on a work center in the graphical planning table. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched, how does the insertion take place? A. The new operation is inserted at the desired time; the previous dispatched operation is moved forward. B. The new operation is inserted at the desired time; the previously dispatched operation is moved backward C. The previously dispatched operation stays as is; the new operation is inserted after the dispatched operation. D. The previously dispatched operation stays as is; the new operation is inserted before the dispatched operation.
B. The new operation is inserted at the desired time; the previously dispatched operation is moved backward
Question: 1 Why would you use phantom assemblies? Note: There are 3 correct answers to this question. A. To increase the number of planning levels B. To simplify the structure of bills of material C. To reduce the number of material masters D. To make the assignment of components easier E. To reduce the number of changes required in bills of material
B. To simplify the structure of bills of material D. To make the assignment of components easier E. To reduce the number of changes required in bills of material
Question: 63 What can you use heuristics in Advanced Planning (PP/DS) for? A. To optimize costs and times in production plans B. To solve planning problems for defined objects C. To automate material movements in material staging D. To set default values in production master data
B. To solve planning problems for defined objects
Question: 51 Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question A. Work item B. Variable-size item C. Non-stock item D. WBS item
B. Variable-size item C. Non-stock item
Question: 16 What does the material type influence? Note: There are 2 correct answers to this question. A. Which document types and class categories are allowed B. Which material master screens appear and in which sequence C. Whether the material is produced in-house, procured externally, or both D. Which plant-specific and plant-independent statuses are allowed
B. Which material master screens appear and in which sequence C. Whether the material is produced in-house, procured externally, or both
Question: 31 How can a material availability check be triggered automatically for a production order? Note: There are 2 correct answers to this question. A. By capacity planning B. By mass processing C. By order release D. By order creation
C. By order release D. By order creation (confirmation)
Question: 36 Which materials have a negative quantity in a bill of material or in a recipe? Note: There are 3 correct answers to this question A. Continuous flow materials B. Bulk materials C. By-products D. Co-products E. Waste products
C. By-products D. Co-products E. Waste products
Question: 50 Which master data object governs the relationship between supply source and demand source in the Kanban process? A. Replenishment strategy B. Production supply area C. Control cycle D. Rate routing
C. Control cycle
Question: 22 You want to create a production order. What methods can you use? Note: There are 2 correct answers to this question. A. Create by order release B. Convert a purchase requisition C. Create in Kanban process D. Create without material
C. Create in Kanban process D. Create without material
Question: 29 Which business processes are affected by settings in the order-type-dependent parameters? Note: There are 2 correct answers to this question. A. Check material availability. B. Schedule production orders. C. Define integration with cost accounting. D. Select master data.
C. Define integration with cost accounting. D. Select master data.
Question: 11 If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement? A. Fill up to the maximum stock level. B. Fill up to the safety stock level. C. Fill up based on the lot size procedure. D. Fill up to the reorder stock level.
C. Fill up based on the lot size procedure.
Question: 60 In documentation for MRP in Advanced Planning, you read that new orders are created through infinite planning. What does this mean for the capacity requirements of a new order? A. MRP assigns the capacity requirements automatically to work centers with the earliest available capacity. B. MRP assigns the capacity requirements automatically after the last scheduled order on a work center. C. MRP creates the capacity requirements without checking the work center capacities. D. MRP creates the capacity requirements only if the work center has sufficient capacity.
C. MRP creates the capacity requirements without checking the work center capacities./ SAP Buddy is same it says: w/o considering the existing work load on the work centers
Question: 44 Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? Note: There are 2 correct answers to this question A. Total replenishment lead time B. Operation duration C. Planned delivery time D. In-house production time
C. Planned delivery time D. In-house production time
Question: 7 You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material? A. Planning with final assembly (40) B. Production by lot size (30) 7 C. Planning at assembly level (70) D. Make-to-order production (20)
C. Planning at assembly level (70)
Question: 37 Where do you maintain the work center that represents the production line for repetitive manufacturing? Note: There are 2 correct answers to this question A. Production cost collector B. Repetitive manufacturing profile C. Routing D. Production version
C. Routing D. Production Version Book 2 Fig 56
Question: 26 In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question. A. Finiteness level B. Fixed pegging C. Scheduling control D. Planning mode E. Direction
C. Scheduling control D. Planning mode E. Direction
Question: 72 What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing? A. The planned order is converted to a production order. B. The planned order's component availability is checked. C. The planned order generates capacity requirements D. The planned order's components are copied to the picking list.
C. The planned order generates capacity requirements SAP Buddy doesn't have this q
Question: 49 Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question. A. The same batch management level is used B. The same base unit of measure is used. C. The quantity and value updates are the same D. The same account category is used
C. The quantity and value updates are the same D. The same account category is used
Question: 78 Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HAN A. When can you use mode selection? A. When multiple production versions are maintained for one product B. When multiple operations are maintained for one product C. When alternative resources are used within one operation D. When multiple planned orders exist on one resource
C. When alternative resources are used within one operation
Question: 71 When can consumption of planned independent requirements take place for planning strategy 40 (Planning with final assembly? A. When MRP creates a dependent requirement B. When MRP creates a planned order C. When you create a sales order D. When MRP creates a planned order
C. When you create a sales order SAP Buddy doesn't have this q
Question: 73 During production order creation, several valid production versions are found. How does the system choose the production version? A. Lot size or material cost B. Validity period or sales order C. Planned order or material number D. Alphanumeric or quota arrangement
D. Alphanumeric or quota arrangement
Question: 62 Your company manufactures materials whose specifications differ for each manufacturing process. Which application do you have to use in SAP S/4HANA to be able to track and use this information in all areas of logistics? A. Engineering change management B. Quality management C. Process order management D. Batch management
D. Batch management
Question: 70 You want to schedule an operation finitely, without removing other operations. Which scheduling strategy do you select? A. Insert operation B. Squeeze in C. Schedule in working time only D. Find Slot
D. Find Slot SAP Buddy doesn't have this q
Question: 33 What is the difference between co-products and by-products? A. Only co-products are identified by a special item category in the bill of material (BOM) B. Only co-products can be manufactured in isolation from the main product C. Only co-products have a zero inventory valuation D. Only co-products appear in the process or production order settlement rule
D. Only co-products appear in the process or production order settlement rule SAP Buddy also has: "Only Co-products have moment type 101" Co-product have a NON-zero inventory valuation"
Question: 67 You use planning strategy Finite Scheduling with Reverse and want to allow scheduling the past. How can you parameterize this in the strategy profile? A. Specify a negative planning horizon. B. Specify a positive planning horizon. C. Specify a positive offset time. D. Specify a negative offset time.
D. Specify a negative offset time.
Why do you use Engineering Change Management? To monitor and document table changes To enable integration into a sales order To monitor and document object changes To save multiple changes for an object
To monitor and document object changes To save multiple changes for an object
You Need to model goods receipt processing time in detailed scheduling. Which modeling options do you have? ○ Define a goods receipt time in the material master ○ Define a transportation lane and carrier selection in the location master ○ Define a handling resource in the location master ○ Define a suitable process in the production data structure ○ Define a separate inbound resource in the product master
○ Define a goods receipt time in the material master ○ Define a handling resource in the location master ○ Define a suitable process in the production data structure (421 part 2 page 424)
What are the prerequisites for a reporting point confirmation in repetitive manufacturing? ○ Activating the reporting point backlash in the work centers ○ Defining the relevant work centers in the routing ○ Defining the operations as reporting points using the control key
○ Defining the relevant work centers in the routing ○ Defining the operations as reporting points using the control key (422 part 2 pg 146)
What options does a planner have in the planning table for repetitive manufacturing? ○ Reschedule and deallocate operations ○ Change the assignments of production quantities ○ Create new production quantities ○ Dispatch operations to work centers (422 part 2 page 443)
○ Reschedule and deallocate operations ○ Dispatch operations to work centers (422 part 2 pg. 443)
What are the key features of using a low-level code? ○ To determine the sequence in which materials are planned in MRP ○ To determine how costs are rolled up by product costing (421 part 1 page 132) ○ To determine the use of subitems inside material BOM (bill of material) ○ To determine the priority of alternative components inside ATP
○ To determine the sequence in which materials are planned in MRP ○ To determine how costs are rolled up by product costing (421 part 1 pg. 132)
What are the advantages of collective orders? ○ To perform availability checks across the entire collective order ○ To post confirmation for the entire collective order ○ To coordinate orders in the planning board for a collective order ○ To show the flow of batches across the entire collective order
○To perform availability checks across the entire collective order (Book 1: pg. 496 fig 93) ○ To post confirmation for the entire collective order