Cerner training

अब Quizwiz के साथ अपने होमवर्क और परीक्षाओं को एस करें!

Power plan icon meaning?

Part of power plan.

Can remove be used on a Power Plan?

Yes

What is " +Add to Phase" ?

An icon found on the "Plan" toolbar.

Delete or Cancel/DC

An option used to delete or cancel an active Individual Order

Revert

An option used to restore a PowerPlan to its original state during a Void action.

Reset

An option used to restore an order to its original state during a Delete or Cancel/DC action.

Void

An option used to void an active PowerPlan

Which command may be used to delete an order if the Delete option is not available (aka gray/not active/dithered out)?

Cancel/DC

What does the checkmark icon represent?

Checkmark represents an active order.

What does the blue circle with a slash icon mean?

Discontinue

What does the icon with 2 lightbulbs represent?

Displays Excluded Components of a Plan

T or F Orders checked in the subphase powerplan show in the parent plan.

False

Which command may be used to delete an order if the Delete option is not available (aka gray/not active/dithered out)?

False

There are two ways to add an outside order to a PowerPlan: +Add or +Add to Phase

False. +Add will add an additional order, but +Add does not include that order in the PowerPlan.

What does the single light bulb icon represent?

Identifies Initiated Pending Plan Order

What does the double power plan icon mean?

Identifies Subphase Plan

What is the icon for excluded components for a power plan look like?

Like 2 light bulbs

Scroll icon meaning?

Med from home MD

What does merge view do?

MergeView is an button icon that can be turned ON and OFF Your Answer MergeView can be used when reviewing orders and help identify possible duplicates, errors, or omissions. Your Answer MergeView identfies non-PowerPlan orders with a dark blue band. Your Answer MergeView is only available from within a PowerPlan.

Orange circle + white Star icon meaning?

Not yet reconciled.

Hospital icon meaning?

Ordered in hospital

When should you use the Delete option to delete an order?

Ordered the wrong test. Your Answer Ordered a test on the wrong patient. Your Answer Ordered on the wrong encounter (admission visit).

What does the blue circle with a white X icon mean?

The order is missing required details.

Remove" command is only available for use before an order is signed.

True

Using the "Remove" command does not require you to "Sign"?

True

You cannot add a PowerPlan within a PowerPlan. T or F

True

What is " +Add to Phase" ?

Your Answer A method used to add an "outside" order to a Powerplan. Your Answer An icon found on the "Plan" toolbar.

Which icon below identifies the order as a subphase to a powerplan?

Your Answer one that shows 2 smaller multicolor tiles touching each other.


संबंधित स्टडी सेट्स

EMT Chapter 8 Lifting and Carrying

View Set

Cell Structure and Function Final Review

View Set

Real estate chapter 7 unit quizzes & practice quiz

View Set

Live Virtual Machine Lab 3.3: Module 03 NTP Server Management

View Set

Epithelial, Connective, Muscle and Nervous Tissue Analysis Questions

View Set

List and describe the major social criticisms of marketing, pages 498 - 505. In your opinion, which one is the most valid and why?

View Set