Chapter 6
activity attributes
Predecessors, successors, logical relationships, leads and lags, resource requirements, constraints, imposed dates, and assumptions are all examples of ________
SMART criteria
Specific Measurable Assignable Realistic Time-framed
planning schedule management
This process involves determining the policies, procedures, and documentation that will be used for planning, executing, and controlling the project schedule
defining activities
process that involves identifying specific activities that the project team members and stakeholders must perform to produce the project deliverables. The main outputs of this process are milestone list, project management plan
controlling the schedule
process that involves the controlling and managing changes to the project schedule
external dependencies
relationship between project and non-project activities. The installation of a new information system depends on the hardware being delivered
discretionary
As the project manager for a software development project, you are hoping to develop the project schedule. you decide that writing code for a system should not start until users sign off on the analysis work. What type of dependency is this?
finish-to-finish
In this type of relationship, one task cannot finish before another finishes.
red
MS Project highlights the critical path in ____ on a network diagram.
total slack
The amount of time an activity can be delayed from its early start without delaying the planned project finish date is referred to as ________.
free slack
The amount of time an activity can be delayed without delaying the early start date of any immediately following activities is referred to as ________.
longest; shortest
The critical path is the ____ path through a network diagram, and it represents the ____ time it takes to complete a project.
work breakdown structure
The deliverable-oriented listing (depicted as the rows in MS Project) of the work involved in a project that defines the total scope of the project is called the:
defining activities
The main outputs of this process are an activity list, activity attributes, and milestone list.
critical path
The series of activities that determines the earliest time by which the project can be completed is called the project's ___________.
PERT
This method/tool uses probabilistic time estimates — duration estimates based on using optimistic, most likely, and pessimistic estimates of activity duration — to assist project managers in creating specific duration estimates to enter into a Project plan.
white diamond
What symbol on a Gantt chart represents a slipped milestone
tracking gantt chart
What type of diagram shows planned and actual project schedule information?
mandatory
____ dependencies are inherent in the nature of the work being performed on a project.
fast tracking
____ involves scheduling activities in parallel that would normally be completed sequentially.
bursts
____ occur when two or more activities follow a single node.
critical path scheduling
_________ is a method of scheduling that considers limited resources when creating a project schedule and includes buffers to protect the project completion date
dummy activities
____________________ have no duration and no resources but are occasionally needed on AOA network diagrams to show logical relationships between activities.
discretionary dependencies
defined by the project team. A team might follow good practice and and not start the detailed design of a new information system until the user signs off on it
duration
includes the actual amount of time worked on an activity plus elapsed time
three point estimate
optimistic, most likely, and pessimistic
developing the schedule
process that involves analyzing all previous documentation to produce a project schedule
estimating activity resources
process that involves estimating how many resources a project team should use to preform project activities. Outputs are activity resource requirements, resource breakdown structure
crashing
technique for making cost and schedule trade-offs to obtain the greatest amount of schedule compression for the least incremental cost
Slack or float
the amount of time an activity might be delayed without delaying a succeeding activity or the project finish date
effort
the number of workdays or work hours required to complete a task
finish-to-start
you cannot start editing a technical report until someone else completes the first draft. What type of dependency does this represent?
network diagram
A ____________________ is a schematic (pictorial) display of the logical relationships among, or sequencing of, project activities.
milestone
A significant event shown as a row in a WBS that normally has no duration or resources associated with it is called a _______.
mandatory dependencies
A task must be completed before another can be started. You cannot test code before it is written
estimating activity durations
process that involves estimation the number of work periods that are needed to complete an individual activity
sequencing activities
process that involves identifying and documenting the relationships between project activities. The main outputs of this process are the schedule network diagram and project document updates