CM 1011 Mid Term - Donald Schneider

अब Quizwiz के साथ अपने होमवर्क और परीक्षाओं को एस करें!

50 is the average number of employees per construction company in the U.S

false

A bid is the same as an estimate.

false

A construction estimate includes contractor profit.

false

A new construction company should always be an LLC.

false

A pre-construction meeting is not necessary once the contract is signed.

false

A section view is a view outside looking at an outside wall.

false

All of the subcontract bids were in conformance with the specifications.

false

An estimator must be practical, but not creative.

false

Architectural drawings make up the smallest part of a set of drawings

false

BIM stands for Business Industry Manufacturing.

false

BIM stands for Business Information Modeling.

false

Bayou Lacombe Construction mainly builds houses

false

Black text on a white background is very seldom correct

false

Bullet points are for the audience, not the presenter

false

CSI stands for Conditional Specification Ideas.

false

Commercial construction is less sophisticated than residential construction

false

Conceptual estimates must be very accurate.

false

D.R. Horton mostly builds custom houses in the million dollar range.

false

D.R. Horton self performs about 50% of the work it does.

false

D.R. Horton started as a construction company in 1948.

false

Estimators work onsite once a project is under contract

false

Green construction is one that seeks the least expensive way to build something.

false

Green contractors will not need to learn new techniques or materials to be "green."

false

In the traditional project delivery method the contractor is involved in the design

false

Industrial estimating is done the same way as residential estimating

false

Integrated project delivery uses a single entity for design and construction

false

Natural ventilation is an area of focus when considering green outdoor quality.

false

One long writing session works better than lots of short sessions.

false

Our guest presenter, Omer Hebert, has worked for Turner Industries for 40 years.

false

Our guest speaker on communications was Buz Bowden.

false

Our guest speaker on residential construction was Michael Casteneau.

false

Our guest speaker was Marc Bourgeois, President of Brown Eagle Construction Co.

false

Pricing of materials, labor, and equipment comes before quantifying such items.

false

Project close-out is determined during the design phase of a project.

false

Project managers have no direct contract with owners.

false

Quality standards on a construction project are established by the contractor.

false

Quantity takeoff is the first thing an estimator should do when receiving the contract documents.

false

Scheduling addresses "how much" and "what."

false

Site layout is determined after construction has started.

false

Site location does not impact cost.

false

Superintendent is a field position under a field engineer.

false

Superintendent is one of the five career paths at The Lemoine Company.

false

Superintendents have no contact with subcontractors.

false

The Code of Hammurabi dates back to the time of Julius Caesar.

false

The LSU group was awarded the project as low bidder.

false

The Purdue OWL stands for "Online Writing Language.

false

The class chose a profit of eight percent.

false

The cover sheet on a set of drawings contains no useful information.

false

The critical path is the network path with the most floats

false

The minimum amount of profit and overhead to add to an estimate is 10%.

false

The network CPM is ideal for showing the owner the status of the project

false

The network logic stage comes before the sequence stage when producing a schedule.

false

The order of the presentation should be the same as when the material was found

false

The project manager spends all of his or her time in the home office.

false

The proper order for composing a paper or presentation is drafting, pre-writing, and polishing.

false

The punch list corrections must be completed in order to reach substantial completion.

false

The quality of the materials is determined by the contractor.

false

There is little demand for CM graduates at this time.

false

There were seven subcontractors bidding on the overhead doors.

false

Time is relatively unimportant on a construction project.

false

Turner serves government clients in many ways.

false

Value engineering occurs only during the planning phase of a project.

false

You don't need to have money to start your own construction company.

false

80% of college students change majors at least once.

true

A construction estimate is an educated guess.

true

A quantity takeoff is used to develop direct man-hours.

true

A schedule is the adjusted man-hours from the quantity takeoff

true

A site visit is a must before estimating a project.

true

A/E is short for architect/engineer.

true

Access to public transportation is an area of focus when considering green sites

true

Activity on Node (AON) is the most common network diagram used in construction.

true

An estimate is an educated guess.

true

An estimator must be detail oriented.

true

An estimator should have classroom learning, plus experience, plus organizational skills.

true

Bayou Lacombe Construction is a C corporation for tax purposes.

true

Bayou Lacombe Construction is a mechanical general contractor.

true

Being "green" is more than just having solar panels on a roof.

true

Civil drawings have to do with the site.

true

D.R. Horton built 41,000 houses in 2016.

true

D.R. Horton has a mortgage division.

true

D.R. Horton's reputation was built on word-of-mouth.

true

Durations have to do with how long an activity will take.

true

During the Stone Age, construction materials included mud, wood, and stone.

true

Early forms of concrete were invented by the Romans.

true

Estimating is the most important part of construction if you are to make a profit.

true

Estimators price projects based on plans and specifications

true

Final documentation includes as-built drawings

true

Heavy/civil construction is also known as horizontal construction.

true

Housing starts are one of the major economic indicators.

true

In general, the larger a project is, the more it will cost.

true

Increasing scarcity of water is a reason to consider green construction.

true

Interns at D.R. Horton first meet altogether in Fort Worth at the home office.

true

Life cycle costs are an area of focus when considering green impacts.

true

Marc called the summary sheet (shown on the screen) a "top sheet."

true

Mechanical drawings include plumbing and HVAC.

true

Mini-schedules are used for more detail on an item of work.

true

Most definitions have the pre-construction phase starting with the award of the project.

true

Office engineer is an entry level position for a CM graduate.

true

Our guest speaker graduated in CM at LSU.

true

Our guest speaker works for D.R. Horton.

true

Our speaker, Brian Schneider, used to own Bayou Lacombe Construction Company

true

Plan views are as would appear from overhead looking down.

true

Procurement activities are associated with obtaining materials and equipment.

true

Procurement includes getting subcontracts signed.

true

Project managers ensure projects are within budget.

true

Purchasing of materials is part of procurement.

true

Silent Spring had the unintended consequence of millions of deaths in Africa

true

Solar orientation is an area of focus when considering green systems.

true

Superintendents have direct involvement with the onsite construction.

true

Supplemental Conditions amend and add to the General Conditions.

true

The 2004 CSI Master Format is a good way to organize an estimate.

true

The Chicken Coop was so big it required an overhead crane

true

The company must match social security and Medicare withholding.

true

The competing bidders were Bama, Ole Miss, and Auburn.

true

The creation of steel facilitated the construction of skyscrapers.

true

The design/build delivery method allows for fast-tracking.

true

The example bid project was The LSU Chicken Coop.

true

The number "6.2" refers to social security withholding.

true

The plan drawings contain the quantity of the Work.

true

The primary problem with a bar chart is the lack of interconnectivity of the work items

true

The primary tool for planning is the schedule.

true

The project delivery method is determined by the Owner.

true

The three corners of the rhetorical triangle are audience, credibility, and message.

true

Three of the six factors to be controlled on a construction project are cost, time, and quality

true

Turner Industries works in the industrial construction industry.

true

Turner relies more on "direct hire craftsmen" than subcontractors.

true

Turner uses modular construction on many contracts

true

Use of recycled and reusable materials is an area of focus when considering green systems.

true

Your eyes are magical.

true

animate for effect only

true


संबंधित स्टडी सेट्स

servsafe ch 5 test questions i got wrong

View Set

PSYC 255-Exam Two chapter five ULL

View Set

Med Surg test 3 (CH 47, 48, 49, 55, 56, 57)

View Set

Photoshop Brain Buffet Lesson's Review

View Set

STC Series 7 Progress Exam 4A Part II

View Set