CM 1011 Mid Term - Donald Schneider
50 is the average number of employees per construction company in the U.S
false
A bid is the same as an estimate.
false
A construction estimate includes contractor profit.
false
A new construction company should always be an LLC.
false
A pre-construction meeting is not necessary once the contract is signed.
false
A section view is a view outside looking at an outside wall.
false
All of the subcontract bids were in conformance with the specifications.
false
An estimator must be practical, but not creative.
false
Architectural drawings make up the smallest part of a set of drawings
false
BIM stands for Business Industry Manufacturing.
false
BIM stands for Business Information Modeling.
false
Bayou Lacombe Construction mainly builds houses
false
Black text on a white background is very seldom correct
false
Bullet points are for the audience, not the presenter
false
CSI stands for Conditional Specification Ideas.
false
Commercial construction is less sophisticated than residential construction
false
Conceptual estimates must be very accurate.
false
D.R. Horton mostly builds custom houses in the million dollar range.
false
D.R. Horton self performs about 50% of the work it does.
false
D.R. Horton started as a construction company in 1948.
false
Estimators work onsite once a project is under contract
false
Green construction is one that seeks the least expensive way to build something.
false
Green contractors will not need to learn new techniques or materials to be "green."
false
In the traditional project delivery method the contractor is involved in the design
false
Industrial estimating is done the same way as residential estimating
false
Integrated project delivery uses a single entity for design and construction
false
Natural ventilation is an area of focus when considering green outdoor quality.
false
One long writing session works better than lots of short sessions.
false
Our guest presenter, Omer Hebert, has worked for Turner Industries for 40 years.
false
Our guest speaker on communications was Buz Bowden.
false
Our guest speaker on residential construction was Michael Casteneau.
false
Our guest speaker was Marc Bourgeois, President of Brown Eagle Construction Co.
false
Pricing of materials, labor, and equipment comes before quantifying such items.
false
Project close-out is determined during the design phase of a project.
false
Project managers have no direct contract with owners.
false
Quality standards on a construction project are established by the contractor.
false
Quantity takeoff is the first thing an estimator should do when receiving the contract documents.
false
Scheduling addresses "how much" and "what."
false
Site layout is determined after construction has started.
false
Site location does not impact cost.
false
Superintendent is a field position under a field engineer.
false
Superintendent is one of the five career paths at The Lemoine Company.
false
Superintendents have no contact with subcontractors.
false
The Code of Hammurabi dates back to the time of Julius Caesar.
false
The LSU group was awarded the project as low bidder.
false
The Purdue OWL stands for "Online Writing Language.
false
The class chose a profit of eight percent.
false
The cover sheet on a set of drawings contains no useful information.
false
The critical path is the network path with the most floats
false
The minimum amount of profit and overhead to add to an estimate is 10%.
false
The network CPM is ideal for showing the owner the status of the project
false
The network logic stage comes before the sequence stage when producing a schedule.
false
The order of the presentation should be the same as when the material was found
false
The project manager spends all of his or her time in the home office.
false
The proper order for composing a paper or presentation is drafting, pre-writing, and polishing.
false
The punch list corrections must be completed in order to reach substantial completion.
false
The quality of the materials is determined by the contractor.
false
There is little demand for CM graduates at this time.
false
There were seven subcontractors bidding on the overhead doors.
false
Time is relatively unimportant on a construction project.
false
Turner serves government clients in many ways.
false
Value engineering occurs only during the planning phase of a project.
false
You don't need to have money to start your own construction company.
false
80% of college students change majors at least once.
true
A construction estimate is an educated guess.
true
A quantity takeoff is used to develop direct man-hours.
true
A schedule is the adjusted man-hours from the quantity takeoff
true
A site visit is a must before estimating a project.
true
A/E is short for architect/engineer.
true
Access to public transportation is an area of focus when considering green sites
true
Activity on Node (AON) is the most common network diagram used in construction.
true
An estimate is an educated guess.
true
An estimator must be detail oriented.
true
An estimator should have classroom learning, plus experience, plus organizational skills.
true
Bayou Lacombe Construction is a C corporation for tax purposes.
true
Bayou Lacombe Construction is a mechanical general contractor.
true
Being "green" is more than just having solar panels on a roof.
true
Civil drawings have to do with the site.
true
D.R. Horton built 41,000 houses in 2016.
true
D.R. Horton has a mortgage division.
true
D.R. Horton's reputation was built on word-of-mouth.
true
Durations have to do with how long an activity will take.
true
During the Stone Age, construction materials included mud, wood, and stone.
true
Early forms of concrete were invented by the Romans.
true
Estimating is the most important part of construction if you are to make a profit.
true
Estimators price projects based on plans and specifications
true
Final documentation includes as-built drawings
true
Heavy/civil construction is also known as horizontal construction.
true
Housing starts are one of the major economic indicators.
true
In general, the larger a project is, the more it will cost.
true
Increasing scarcity of water is a reason to consider green construction.
true
Interns at D.R. Horton first meet altogether in Fort Worth at the home office.
true
Life cycle costs are an area of focus when considering green impacts.
true
Marc called the summary sheet (shown on the screen) a "top sheet."
true
Mechanical drawings include plumbing and HVAC.
true
Mini-schedules are used for more detail on an item of work.
true
Most definitions have the pre-construction phase starting with the award of the project.
true
Office engineer is an entry level position for a CM graduate.
true
Our guest speaker graduated in CM at LSU.
true
Our guest speaker works for D.R. Horton.
true
Our speaker, Brian Schneider, used to own Bayou Lacombe Construction Company
true
Plan views are as would appear from overhead looking down.
true
Procurement activities are associated with obtaining materials and equipment.
true
Procurement includes getting subcontracts signed.
true
Project managers ensure projects are within budget.
true
Purchasing of materials is part of procurement.
true
Silent Spring had the unintended consequence of millions of deaths in Africa
true
Solar orientation is an area of focus when considering green systems.
true
Superintendents have direct involvement with the onsite construction.
true
Supplemental Conditions amend and add to the General Conditions.
true
The 2004 CSI Master Format is a good way to organize an estimate.
true
The Chicken Coop was so big it required an overhead crane
true
The company must match social security and Medicare withholding.
true
The competing bidders were Bama, Ole Miss, and Auburn.
true
The creation of steel facilitated the construction of skyscrapers.
true
The design/build delivery method allows for fast-tracking.
true
The example bid project was The LSU Chicken Coop.
true
The number "6.2" refers to social security withholding.
true
The plan drawings contain the quantity of the Work.
true
The primary problem with a bar chart is the lack of interconnectivity of the work items
true
The primary tool for planning is the schedule.
true
The project delivery method is determined by the Owner.
true
The three corners of the rhetorical triangle are audience, credibility, and message.
true
Three of the six factors to be controlled on a construction project are cost, time, and quality
true
Turner Industries works in the industrial construction industry.
true
Turner relies more on "direct hire craftsmen" than subcontractors.
true
Turner uses modular construction on many contracts
true
Use of recycled and reusable materials is an area of focus when considering green systems.
true
Your eyes are magical.
true
animate for effect only
true