Markstrat research quiz

अब Quizwiz के साथ अपने होमवर्क और परीक्षाओं को एस करें!

methods for deciding actual cost

1) feasibility study specifying the lowest possible base cost (very accurate but takes time) 2) a on-line R&D query option (overstated but immediate).

formula to calculate "ideal attribute" (C)

C = CMin + (CMax - CMin) x (I-1)/(7-1)

feasibility study

Study costs $100,000 The project will not be completed After one year, R&D will tell you: (1) the budget needed to develop the project; (2) what the project Minimum Base Cost is More accurate than an online query Quite useful to investigate various options for the new Vodite market

how do you decide on the base cost?

ask R&D to develop project at lowest possible price -> the project will be more expensive to develop choose one yourself

cost reduction projects

should be weighed against experience curve effects

online query

R&D will immediately tell you the budget needed to develop the project R&D will also provide you with the project Minimum Base Cost You do not have to allocate the entire budget in 1 year: you may complete the project in 1, 2 or even 3 years Beware: budgets given by online queries are usually overestimated

experience effect

The manufacturing cost of the products tend to decrease as a result of productivity improvements gained through experience production doubles => unit transfer cost from production to mkting dept decreases 15%

how to translate consumer needs into physical characteristics?

copy the leader interpolate (semantic scales study graphs to analyze relationships)

why use R&D

develop/launch a brand in a new market or segment reposition/modify a brand reduce manufacturing unit cost

brand modification consequences

obsolete inventory -> sold to trading company or purchased from production dept and paid for -> a loss of transfer cost is taken on obsolete inventory

determine how much budget is needed to develop the project

run an online query run a feasibility study

the base cost of a new project might be lower than

the base cost for the first 100,000 units of the current product, but higher than the current transfer cost achieved by experience effect


संबंधित स्टडी सेट्स

AP Literature Mrs. Baer Mid-term Exam

View Set

Developmental Stages: Infancy to Adolescents

View Set

Chapter 38: Caring for Clients with Cerebrovascular Disorders

View Set

Adventurous Alice SAT Word List 76-100

View Set

PSYC 4100: Chapter 6 What is test reliability/precision?

View Set

Microbiology Lab Final Exam Study Guide

View Set