MIS352 Chapter 13
A native mobile app is: one that can only operate on selected devices. a mobile website. a responsive mobile app. a mobile web app. a standalone application that does not use a browser.
a standalone application that does not use a browser
Which of the following is more powerful than rationalization of procedures? Automation Business process redesign TQM Systems analysis and design Six sigma
business process redesign
A(n) ________ is an organizational change that involves rethinking the nature of the business and the nature of the organization itself. systems analysis paradigm shift rationalization program business process redesign program automation program
paradigm shift
An upscale organic foods grocery chain is implementing an information system that will enable it to add same-day home delivery of groceries to its customers. This is an example of: organizational change. rationalization of procedures. business process redesign. paradigm shift. automation.
paradigm shift
Which conversion process introduces the system first to a limited portion of the organization? Phased approach strategy Pilot study strategy Limited cutover strategy Parallel approach strategy Parallel strategy
pilot study strategy
In what stage of systems development are design specifications created? Testing Systems analysis Conversion Systems design Implementation
systems design
A(n) ________ is the model or blueprint for an information system solution and consists of all the specifications that will deliver the functions identified during systems analysis. systems design document information requirements document request for proposal data flow diagram feasibility study
systems design document
The oldest method for building information systems is: computer-aided software engineering. the systems life cycle. component-based development. prototyping. object-oriented development.
systems life cycle
Unit testing: tests each program separately. provides the final certification that the system is ready to be used in a production setting. involves testing the entire system with real-world data. includes all the preparations for the series of tests to be performed on the system. tests the functioning of the system as a whole in order to determine if discrete modules will function together as planned.
tests each program separately
What is the primary driving factor for firms in selecting domestic outsourcing firms to build system solutions? To avoid change management issues To reduce the cost of hardware To save labor costs To avoid offshore outsourcing To take advantage of technical skills the firm does not have
to take advantage of technical skills the firm does not have
CASE tools facilitate the creation of clear documentation and the coordination of team development efforts. True False
true
The entire system-building effort is driven by: documentation. available information technology. six sigma. feasibility studies. user information requirements.
user information requirements
Which of the following statements about mobile web apps is true? A mobile web app requires the user to sign onto a web page. Users access mobile web apps through their mobile device's web browser. A mobile web app only works on certain mobile platforms. A mobile web app resides on the user's device. A mobile web app requires the user to login to a web service.
users access mobile web apps through their mobile device's web browser
DevOps stands for "development opportunities." True False
false
Which process develops a detailed description of the functions that a new information system must perform? Requirements analysis Systems design Test plan development Management plan Feasibility study
requirements analysis
Which of the following statements about CASE is not true? CASE provides hardware and software tools. CASE tools facilitate the creation of clear documentation. CASE tools can improve communication between users and technical specialists. CASE tools support iterative design. To be used effectively, CASE tools require organizational discipline.
CASE provides hardware and software tools
Which type of systems development is characterized by significantly speeding up the design phase and the generation of information requirements and involving users at an intense level? RAD JAD End-user development Traditional Prototyping
JAD
The four kinds of structural organizational change enabled by IT, in order from least to most risky, are: rationalization, automation, reengineering, and redesigning. automation, rationalization, redesigning, and paradigm shift. rationalization, automation, reengineering, and paradigm shift. automation, redesigning, restructuring, and paradigm shift. paradigm shift, reengineering, rationalization, and automation.
automation, rationalization, redesigning, and paradigm shift
BPM software provides tools that help business do all of the following except: identify and document processes requiring improvement. capture and enforce business rules for performing processes. integrate existing systems to support new or redesigned processes. capture and identify information system requirements for a new system. create models of improved processes.
capture and identify information system requirements for a new system
Transferring data from a legacy system to the new system would be defined by which category of system design specifications? Input Conversion Manual procedures Implementation Database
conversion
The primary tool for representing a system's component processes and the flow of data between them is the: structure chart. object-oriented chart. data dictionary. data flow diagram. process specifications diagram.
data flow diagram
A "responsive design" for mobile applications is a design that responds to a user's: gestures. needs. voice commands. location. digital device and screen size.
digital device and screen size
In automation: business processes are added. the nature of the business is rethought. more manual steps are required. employees are enabled to perform their tasks more efficiently. business processes are reorganized to cut waste and eliminate repetitive, paper-intensive tasks.
employees are enabled to perform their tasks more efficiently
Companies using DevOps, like Netflix, can update its production systems with new software in a matter of months. True False
false
Documentation reveals how well a system works from both a technical standpoint, but not an end-user standpoint. True False
false
Information systems can only have one possible design. True False
false
Objects are grouped into hierarchies, and hierarchies into classes. True False
false
Rationalization of procedures describes a radical rethinking of the business models. True False
false
Systems development activities always take place in sequential order. True False
false
Traditional structured development is more incremental than object-oriented development. True False
false
An entire information system is broken down into its subsystems by using: logical design diagrams. high-level data flow diagrams. structured diagrams. process specifications. low-level data flow diagrams.
high-level data flow diagrams
A systems building approach in which the system is developed as successive versions, each version reflecting requirements more accurately, is described to be: end-user oriented. object-oriented. prototyped. iterative. agile.
iterative
Changes in hardware, software, documentation, or production to a production system to correct errors, meet new requirements, or improve processing efficiencies are termed: production. acceptance. maintenance. post-implementation. implementation.
maintenance
Object-oriented development could potentially reduce the time and cost of writing software because: a single user interface object can be used for the entire application. it's not necessary to use a formal methodology to design a system. iterative prototyping is not required. object-oriented programming requires less training. objects are reusable.
objects are reusable
In object-oriented development: data and processes are separated. processing logic resides within objects. the class is used as the basic unit of systems analysis and design. a strict, step-by-step development process is essential. an object is a collection of data that is acted on by external processes.
processing logic resides within objects
You are an IT project manager for an advertising firm. The firm wishes to create an online tool that will be used to survey focus group reactions to products in development. The most important consideration for the firm is being able to offer the tool as soon as possible as a new corporate service. However, you know that many of the senior managers that are business owners of this project have difficulty in understanding technical or software development issues, and are likely to change their requirements during the course of development. What development method would be most successful for this project? JAD End-user development Traditional RAD Prototyping
prototyping
In the direct cutover conversion strategy, the new system: and the old are run together. is tested by an outsourced company. is introduced in stages. the old and new systems are run in parallel. replaces the old one at on an appointed day.
replaces the old one at on an appointed day
A software package evaluation process is often based on a series of questions sent to vendors, called a(n): logical design document. request for proposal. information systems management plan. strategic planning document. systems design document.
request for proposal
A software package evaluation process is often based on a series of questions sent to vendors, called a(n): request for proposal. logical design document. systems design document. information systems management plan. strategic planning document.
request for proposal
Systems design: identifies which users need what information, where, when and how. is concerned with the logical view of the system solution. shows how the new system will fulfill the information requirements. determines whether a solution is feasible from a financial and organizational standpoint. translates system specifications into software program code.
shows how the new system will fulfill the information requirements
To show each level of a system's design, its relationship to other levels, and its place in the overall design structure, structured methodologies use: process specifications. structure charts. Gantt and PERT charts. user documentation. data flow diagrams.
structure charts
Which of the following may occur when systems are created rapidly, without a formal development methodology? Hardware, software, and quality standards are less important. The organization quickly outgrows the new system. Testing and documentation may be inadequate. IT specialists dominate the design of the system. End users can take over the work of IT specialists.
testing and documentation may be inadequate
Possible functions of BPM tools include all of the following except: identifying and document business processes. testing the security of business processes. designing new processes. integrating existing systems to support business processes' improvements. automating business processes.
testing the security of business processes
System testing: tests the functioning of the system as a whole in order to determine if discrete modules will function together as planned. includes all the preparations for the series of tests to be performed on the system. tests the information requirements of a system. provides the final certification that the system is ready to be used in a production setting. tests each program separately.
tests the functioning of the system as a whole in order to determine if discrete modules will function together as planned
System testing: provides the final certification that the system is ready to be used in a production setting. tests the information requirements of a system. includes all the preparations for the series of tests to be performed on the system. tests each program separately. tests the functioning of the system as a whole in order to determine if discrete modules will function together as planned.
tests the functioning of the system as a whole in order to determine if discrete modules will function together as planned.
In which type of systems building are the development stages organized so that tasks in one stage are completed before the tasks in the next stage begin? Traditional Prototyping RAD Object oriented development JAD
traditional
A data flow diagram offers a logical and graphical model of information flow, partitioning a system into modules that show manageable levels of detail. True False
true
End-user-developed systems can be completed more rapidly than those developed through the conventional systems lifecycle. True False
true
Prototyping is more iterative than the conventional lifecycle. True False
true
Responsive web design enables websites to change layouts according to the user's screen size. True False
true
The idea that the achievement of quality control is an end in itself describes a main concept of: six sigma. systems analysis and design. BPR. BPM. TQM.
TQM
To understand and define the contents of data flows and data stores, system builders use: a data dictionary. process specifications diagrams. systems analysis. user documentation. data flow diagrams.
a data dictionary
End user development: increases the time and steps required to produce a finished application when compared to professional development. allows end users to create highly complex information systems. allows ends users to develop simple information systems. requires more time to develop systems. requires formal assistance from technical specialists.
allows end users to develop simple information systems
In a parallel conversion strategy, the new system: is introduced only to a limited area first. is slowly converted from the old system. replaces the old one on an appointed day. and the old are run together for a time. is tested by an outsourced company.
and the old are run together for a time
In the traditional systems life cycle, end users: are important and ongoing members of the team from the original analysis phase through maintenance. are important only in the testing phases. have no input. control the development of the system. are limited to providing information requirements and reviewing the technical staff's work.
are limited to providing information requirements and reviewing the technical staff's work