Org and Admin MS
what has to be within or near fitness rooms; should be located within a 1.5-min walk of incident site and ADA requires be at wheelchair height
First aid kit and AED
what is the desirable ceiling height ranges
12-14 ft
what is recommended ceiling height for a fitness facility
12-14 ft ceilings
what height does mirrors have to be off the floor in fitness centers
20 inches
what is the minimum height for windows above the floor
20 inches
the ADA requires that each piece of equipment have an adjacent clear floor space of at least ______ by _____ inches
30 by 48 inches
for free weights with racks and dumbbells should be lined up along a wall with enough room to walk between the wall and weights at least ______________ between ends of racked bars
36 in
According to the American with Disabilities Act (ADA) passageways width must be at least how many inches to accommodate wheelchairs
36 inches
designated walkways in circuit training area should be between how many feet
4 and 7 feet
stretching and warm-up area should have at least _______________ of open space
49 square feet
what is a non-negotiable for a fitness facility
accessible to those with disabilities (wheelchair ramp or lift, ramps should run 12 inches)
a design committee should consist of what professionals
administrators, facility management personnel, architect, contractor, lawyer, personal trainer, representative
third steps in modifying and existing facility
arrange equipment, create employee duties/schedule and hire/keep staff
what should a design facility make sure to maintain a background noise levels 70-90 decibels according as fitness facility guidelines
background music and noise
what is the least expensive type of flooring
carpet
what should be under lock and kept in a storage cabinet
cleaning supplies
what in fitness facility guidelines display information on upcoming events, announcements and educational materials
communication boards
what should the design phase take into account
equipment and facility spacing; local health, safety and legal codes
before any of the phases, a __________ ____________ ________________ should be formed
facility design committee
when design a facility what 4 main things should be considered
facility location and access, structural and functional considerations, environmental factors and safety/supervision
location of resistance training room, space for supervisors, staff-to-member ratios, ceiling height, windows, doors, lighting, storage area, mirrors, walls and floor are all part of what
resistance training room guidelines
what is the most common option for flooring
rubber and antifungal carpet
____________ and _______________ are top priorities when one is deciding on placement of equipment
safety; function
what is installed to clearly display operational policies, facility rules, safety guidelines, entrances, exits, rest rooms, etc
signage
equipment placement should be split into what 5 groups
stretching/warm-up, agility/plyometrics, free weights, aerobic area and machines
nonfunctional equipment should be labeled
"out of order"
what is the optimal humidity level of a fitness area
50% or less [no higher than 60%]
According the ADA hallways and circulation passages need to be at least how many inches in width
60 inches
what is the recommended temperature range for a fitness facility
72-78
what phase may take several months, final result is a blueprint, work closely with an architect, facility management/design and health professionals
Design phase
traffic flow is heavily influenced by
Equipment placement
name if analysis of strengths, weaknesses, opportunities and threats [often conducted as a part of a feasible study]
SWOT analysis
what are the ideals for supervisor loaction
a central location with clear lines of sight
what phase takes the most time
construction phase
what is determine by the committee as part of a feasible study
cost, facility location, program needs and projected usage of the facility
check tiles for any __________ or ________________
cracks; potential glue
second step in modifying an existing facility
create operational plan, remodels/or upgrade and finalize design and decoration
what is important to knowing the age of athlete or organization [high school, college and professional]
demographic
the 3 main phases of selecting exercise equipment are what
developing functional criteria, evaluating the specifications and the effectiveness of the equipment, and evaluating the manufacturers business practices
what should have both 110- and 220-volt outlets in the fitness facility guidelines
electrical requirements
design phase includes
final committee and create blueprint
3 main things to make sure to clean in a floor
floors, walls, and ceiling
stretching and warm-up area should include
foam rollers, bands, PVC pipes, tennis balls, golf balls, softballs, jump ropes; (should be at least 49 square feet for open space)
construction phase includes
follow master plan, arrange equipment and check construction progress
first step in modifying an existing facility
form committee, feasibility study, needs analysis
check cables for signs of
fraying and tears
what are ideals for facility location to be on
ground floor, or flooring load bearing at least 100lbs per square foot
pre-operation phase includes
hire staff, assign duties, create cleaning schedule and create plan for operation
placing free weights along the wall helps with what
improve the flow, prevents congestions and maximize space
what flooring is the most suitable for plyometrics
indoor turf
what flooring is more durable than carpet
interlocking rubber mats
According to the ADA the floor should remain ____________ through entrances; and if the threshold exceeds 0.5 inches the facility must have a __________ or ___________ with a slope of 1 foot for every inch of elevation
level; ramp or lift
If the results of the needs analysis and feasible study are positive, the committee develops a _________________ ____________
master plan
nonabsorbent floors should be regularly ...
mopped to remove dust and grime
What tends to increase motivation when a person is exercising in the fitness facility guidelines
natural lighting and windows
predesign phase includes
needs analysis, feasibility study, master plan and hire architect
what is important for traffic flow, impact the square footage requirements
number of athletes
the 6 main questions that need to addressed in an athletic program
number of athletes training goals demographic training experience athlete schedule equipment repairs
who should be involved in all three phases of the exercise equipment selection process: developing functional criteria, evaluating specifications and effectiveness and business practices
personal trainers
what number pase develops criteria that meet users' functional needs for equipment
phase 1: develop functional criteria for the equipments
what phase number looks into the cost, maintenances, selling points, age groups and fitness levels
phase 2: evaluate specifications and effectiveness of the equipment
what phase number is the review (companies business records, customer service, reputation) keeping expenses low is a priority
phase 3: evaluate manufacturers business practices
what flooring is the most expensive
poured rubber
what phase asks the questions of how staff will be trained, scheduled, interview process, job positions, etc.
pre-operation
what phase has staffing and staff development for a facility are the focus
pre-operation phase
what phase is it when a committee conducts a needs analysis and a feasible study [selecting an architect and outlines possible future expansion and alternative uses]
predesign phase
the four main phases of designing and planning a facility
predesign, design, construction and preoperation
what saves money in fitness facilities
proper maintenance
what is desirable to locate adjacent to or near a fitness room when large, heavy equipment needs to be transferred to the shop in the fitness facility guidelines
repair and maintenance shop
what machines should be placed along walls to allow for visibility
taller machines
what in a fitness facility located in the supervisors office for emergency purposes and the front entrance be mounted at max height of 4ft
telephones
when the committee finds out a needs exist what is the next step
to conduct a feasible study
what should also be cleaned at least once every week or two
walls and ceilins
what is installed close to the entrance of the main fitness rooms or other convenient locations for easy access; the ADA requires to be installed at a wheelchair accessible height
water fountain
What is needed to be known in the needs analysis in the predesign phase
who the clients, max number of users, location, programs and services needed and budget
what flooring is the best for olympic platforms
wood floor
what weightlifting platforms should be checked for splintering and cracking
wood floors
training protocols should be practiced and modified __________ so that all new and current staff are familiar with the plan
yearly