PD 1096 (PROFESSIONAL PRACTICE QUIZ)

अब Quizwiz के साथ अपने होमवर्क और परीक्षाओं को एस करें!

1977

When was the Presidential Decree No. 1096 signed into law?

IMPERVIOUS SURFACE AREA

ISA

BUILDING BULK

A volume quantity

ALLOWABLE MAXIMUM BUILDING FOOTPRINT

AMBF

Article 1723

Article___________ of the Civil Code that states the liability of an Engineer and Architect who dew up the plans and specifications.

Warehouse

Below are under General Institution, except 1 Education Medical Medical Warehouse

PERCENTAGE OF SITE OCCUPANCY

PSO

3.00m

R-3 Occupancy what is the basic setback frontage requirement?

TGFA

Refers to the total floor space inside the building.

REPAIR

Remedial work done on any damaged or deteriorated portion/s of a building/structure to restore its original condition

3.6mW x 18.00mL

Standard Parking Slot size for Articulated Truck parking

2.15mW x 6:00mL

Standard Parking Slot size for a Car in parallel parking

TOTAL GROSS FLOOR AREA

TGFA

TOTAL LOT AREA

TLA

TOTAL OPEN SPACE WITHIN LOT

TOSL

National Building Code of the Philippines

The Presidential Decree No. 1096 shall be known as?

3.0 storeys or 9.0m

The RROW width also dictates the BHL6-7m RROW: for 6-7m RROW, the allowable BHL is?

Building Officials

The ________ shall be responsible for carrying out the provisions of this Code in the field as well as the enforcement of orders and decisions made pursuant thereto.

FIRE RESISTIVE RATING

The degree to which a material can withstand fire

DEMOLITION

The systematic dismantling or destruction of a building/ structure, in whole or in part

Type III

These buildings shall be of Masonry and wood construction with One hour fire resistive throughout and Incombustible exterior walls.

Type IV

These buildings shall be of Steel, iron, concrete, or masonry construction with Incombustible interiors (ceilings, walls)

Type I

These buildings shall be of wood construction.

300mm thk , with 1000mm below the surface of the ground

What is standard foundation provision for a GROUP A Dwelling?

Minimum width: 750mm

What is the Minimum width for a stairs?

Provides a framework of minimum standards Guide for requirements for all buildings to regulate their location, design, quality of materials, construction, and use

What is the Purpose of the Code?

2.5 storeys or 7.5m

What is the allowable BHL for a RROW of 4- 5m?

150kg/sqm

What is the allowable Second floor Structural live Load for a Group A dwellings

5 sets of plans and specs, signed and sealed by various professionals

What is the number of set of plans and specs required for Permit requirements?

Before constructing, altering, repairing,converting, moving, adding to,demolishing a building.

When is a building permit required?

Construction does not commence within 1 year from date of issuance. Construction does not resume 125 days after suspension of abandonment of work.

When is the building permit expires? under what scenarios.

Building Official

Who undertakes inspection of buildings?

Land

Zones are assigned to______________.

1.50m

minimum dimension in cluster living units with adjacent courts

EASEMENT

situated outside of private property limits

CONVERSION

A change in the use or occupancy of a building/ structure or any portion/s thereof which has different requirements

BUILDING PERMIT

A written authorization granted by the Building Official to an applicant allowing him to proceed with construction after plans, specifications and other pertinent documents have been found to be in conformity with the Code

ALLOWABLE MAXIMUM VOLUME OF BUILDING

AMVB

CONSTRUCTION

All on-site work done from site preparation, excavation, foundation, assembly of all the components and installation of utilities and equipment of buildings/structure

Construction

All on-site work done from site preparation, excavation, foundation, assembly of all the components and installation of utilities and equipment of building is called?

ADDITION

Any new construction which increases the height or area of an existing building/structure

RENOVATION

Any physical change made on a building/ structure to increase its value, utility and/or to improve its aesthetic quality

FIRE ZONE

Areas within which only certain types of construction are allowed, based on their occupancy, type of construction, and resistance to fire

Group I

Assembly with 1000 or more occupant loads are classified under___________.

BUILDING HEIGHT LIMIT

BHL

Group E

Business and Mercantile are identified and classified as _______.

CERTIFIED FLOOR AREA

CFA

ALTERATION

Construction in a building/ structure involving changes in the materials used, partitioning, location/ size of openings, structural parts, existing utilities and equipment but does not increase the overall area thereof.

18

For public universities , what is the parking slot provision for a school bus considering the school has 3,500 students.

GROSS FLOOR AREA

GFA

15 days from payment of fees

How long does it take for the Issuance of permits?

20%

How many percent is the open space for A,B,C D and K occupancies for Inside Lot

15

How many years is the accountability of an engineer or architect upon completion of the building ?

from Grade line to the topmost portion of the building

How to measure the building height? from Grade line to the topmost portion of the building from Grade line to the topmost portion of the building sigange from Grade line to the topmost portion of the building Antenna

C1

Light Commercial with Low-rise buildings (1-3 storeys)

MAXIMUM ALLOWABLE CONSTRUCTION AREA

MACA

750mm

Minimum width of the Stairs:

ROW

No building shall be constructed unless it adjoins or has direct access to a public space, yard, or street on at least one of its sides. ROW Eaves over window park Sidewalk

OUTER FACES OF THE BUILDING

OFB

Buildings

Occupancies are assigned to______________.

Department of Public Works and Highways

Who are the General administrator and enforcer of the building code?

DPWH Secretary

Who is responsible for collecting fees?

PROMENADE

a place specifically intended for walking

true

an abutment up to 3.20m high is OK for carports provided that above 1.50m, the abutment shall be constructed of perforated concrete blocks. True False

ESPLANADE

any open, level space, especially one serving for public walks or drives.

R3

belongs to High-density residential zone. Characterized low-rise or medium-rise buildings for use as multiple family dwellings Includes low-rise or medium-rise condominium buildings

4.50m x 2.00m x 2.00m

for R-1 occupancy what is the minimum setback?

USA + ISA

in computing the TOSL what is the formula?

PLANTING STRIP

is meant to separate the curb from the sidewalk, and must always be placed near the curb line.

ARCADES

may be constructed on sidewalks of streets whenever allowed or required by existing building and zoning regulations.

Corner Lot

10% open space required for A, B,C ,D and J Occupancies?

End lot

30-50% open space required for A, B,C D,E and H occupancy

C3

.Large to very large shopping malls , with very high intensity trade, normally 3-5 storey height.

2.5mW x 5.00mL

.Standard Parking Slot size for a Car in perpendicular parking

FIREWALL

A fireproof barrier used to prevent the spread of fire between or through buildings

Firewall

A fireproof barrier used to prevent the spread of fire between or through buildings

16

A proposed Public Hospital in Misamis Oriental can accommodate 400 patients both inpatient and outpatient. As a designer how many car slot should be provided or considered?

ANCILLARY BUILDING STRUCTURE

A secondary building/ structure located within the same premises, the use of which is incidental to that of the main building/structure

Policy making and Memorandum circulars Prescribe fees Appoint building officials in all municipalities

Duties of Secretary of the DPWH includes:

Interior Lot

E,F,G,H and I occupancies required 20%

ROOFTOP

ESTABLISHING THE TOP OF BUILDING : If roof is flat, top =

Group C

Education and Recreation are identified and classified as _______.

FLOOR AND LOT AREA RATIO

FLAR

Fire Zone 3

Fire Zones- under what zone where Type 1-3 of Construction is not allowed

2 sides, Maximum 85% of each side, Total should not exceed 50% of lot perimeter

Firewall for R4 which of the following statements below is true. 2 sides, Maximum 85% of each side, Total should not exceed 50% of lot perimeter 2 sides, Maximum 75% of each side, Total should not exceed 50% of lot perimeter 2 sides, Maximum 50% of each side, Total should not exceed 50% of lot perimete

for every 50 sqm of congregation area: 1 car slot and 1 jeepney slotslot

For Churches the parking requirement is.

1 slot for every 3 rooms

For Hotels in a highly urbanized area, the parking requirement is.

50%

For a R4 Zone firewall provision, what is the maximum allowable percentage for lot perimeter?

75%

For a R5 Zone under 2 side option firewall provision, what is the maximum allowable percentage for each side?

R4

Townhouse is classified as _________.

UNPAVED SURFACE AREA

USA

Maximum 80% of lot perimeter

Under Commercial, institutional, and industrial, firewalls allowed on the ff conditions below except 1. Provide sprinkler system Maximum 80% of lot perimeter Install fire-retardant or fire-suppression devices RROW setbacks are complied with

9 storey

Under R5 firewall configuration, below are the no. of storey allowed , except for 1. 8 Storey 3 Storey 2 storey 9 storey

Minor Constructions , repair works , Minor structure of 6sqm or less detached from other building , for private use only.

Under Rule 3 of PD 1096, When is the building permit is exempted?

R2

Under allowable firewalls, refers to one side only wiht a maximum 80% of the length of side property line. R2 R3 R4 R5

True

Under mixed occupancies, it is exempted If the minor occupancy does not exceed 10% of the building, in which case it is ignored True False

Industrial- workshops using incombustible and non-explosive materials, and storage and sales rooms for incombustible and non-explosive materials.

What are the occupancies under Group F?

Interior Lot, Inside Lot, Through Lot, Corner Through Lot, Corner Through Lot abutting 3 or more streets, alleys, rivers etc. , End Lot

What are the seven lot types

YARD

the required open space left between the outermost face of the building and the property lines

SETBACK

the width of the yard


संबंधित स्टडी सेट्स

Linear Algebra: Week 11 - 15 Week

View Set

MKTG 3600 Midterm Exam 1- ch 1-7

View Set

Water in the Atmosphere Ch20 EarthScience

View Set

PMBOK Chapter 7 5th (Project Cost Management)

View Set

Structure of the Atmosphere and Solar Effects

View Set

1.09 Unit Test: Narrative Techniques and Structure - Part 1

View Set