using the assembly line balancing procedure which of the following is the theoretical minimum number of workstation if the test times for the six tasks that make up the job are 4, 6, 7, 2, 6, and 5 minutes, and the cycle time is 10 minutes

(4 + 6 + 7 + 2 + 6 + 5)/10=3

which of the following is not considered a major work flow structure

fabrication

according to Littles law which of the following can be used to estimate work-in-process inventory

throughput rate x flow time

You just determined the actual number of workstations that will be used on an assembly line to be 6 using the assembly line balancing procedure. The cycle time of the line is 5 minutes and the sum of all tasks required on the line is 25 minutes. which of the following is the correct value for the resulting lines efficiency

25/6×5=0.833

using the assembly line balancing procedure, which of the following is required cycle time in minutes per unit if the daily production time is 480 minutes and the required daily output is 50 units

480/50 equals 9.6

which of the following is a basic type of process structure

Workcenter

using the assembly line balancing procedure, which of the following is the required cycle time if the production time in minutes per day is 1440 and the required output per day in units is 2000

minutes per day/required output per day 1440/2000=.72

the placement of which of the following is not determined by production process organization decisions

emergency exits

when balancing an assembly line, which of the following is not a way to reduce the longest task time below the required workstations cycle time

speed up the assembly line transfer mechanism


संबंधित स्टडी सेट्स

Graphic Design 2230: Chapter 24- The Digital Revolution- and Beyond

View Set

Chapter 14 Terms - FIN 301: Principles of Finance

View Set

PrepU Chapter 40: Musculoskeletal Care, CH 40, Safety

View Set

Chapter 8: Contraception and Abortion

View Set

Cryptography: Electronic Signatures

View Set

10 - Performance Management and Feedback

View Set

Operating System and File Management

View Set