SAP Activate Methodology

अब Quizwiz के साथ अपने होमवर्क और परीक्षाओं को एस करें!

Which of the following Key Deliverables do you complete in the Solution Design work stream in the Explore phase? There are 3 correct answers to this question. - Baseline Build - Validation Workshops - Solution Scope and Value Determination - Data Migration Approach - Design for the Gaps and Deltas

- Baseline Build - Validation Workshops - Solution Scope and Value Determination - Data Migration Approach - Design for the Gaps and Deltas

Which of the following is not a characteristic that the quality principles are based on? Please choose the correct answer. - Best Practices - Experience of Typical Pitfalls - SAP Quality Award Example winners - International Standard

- Best Practices - Experience of Typical Pitfalls - SAP Quality Award Example winners - International Standard

How can SRCUM teams be organized? Please choose the correct answer. - By work stream - By project governance level - By job title - By project phase

- By work stream - By project governance level - By job title - By project phase

According to the Definition of Done, which activity must be completed for each sprint? Please choose the correct answer. - End user training must be delivered - Solution must be built and configured in the development system (DEV) - Functionality must be tested in the Quality system (QAS) - Functionality must be released to the business

- End user training must be delivered - Solution must be built and configured in the development system (DEV) - Functionality must be tested in the Quality system (QAS) - Functionality must be released to the business

In which SAP Activate methodology phase does the team complete the Integration Validation? Please choose the correct answer. - Explore - Deploy - Realize - Prepare

- Explore - Deploy - Realize - Prepare

In which phase you execute the User Acceptance Test? Please choose the correct answer. - Final Preparation - Deploy - Build and Test - Realize

- Final Preparation - Deploy - Build and Test - Realize

What are the benefits of the SAP best practices? There are 3 correct answers to this question. - Predictable results - Fast time to value - Reduced functional scope - Fixed organizational structure - Simply on-boarding to cloud

- Predictable results - Fast time to value - Reduced functional scope - Fixed organizational structure - Simply on-boarding to cloud

Which content packages are available in the SAP Package Library? There are 2 correct answers to this question. - SAP Best Practices - SAP Activate Methodology - Rapid Deployment Solutions - Solution Builder

- SAP Best Practices - SAP Activate Methodology - Rapid Deployment Solutions - Solution Builder

Which of the following building blocks are part of the SAP S/4HANA platform? There are 2 correct answers to this question. - SAP Fiori UX - SAP HANA in-memory database - SAP Solution Manager - LOB Cloud Solution

- SAP Fiori UX - SAP HANA in-memory database - SAP Solution Manager - LOB Cloud Solution

What is the best target environment for a System Conversion journey is as described in the SAP Activate methodology? Please choose the correct answer. - SAP S/4HANA On-Premise Edition - Hybrid of SAP S/4HANA Cloud Edition and SAP S/4HANA On-Premise Edition - SAP S/4HANA Cloud Edition - SAP Hybris

- SAP S/4HANA On-Premise Edition - Hybrid of SAP S/4HANA Cloud Edition and SAP S/4HANA On-Premise Edition - SAP S/4HANA Cloud Edition - SAP Hybris

What is the objective of a sprint retrospective meeting? Please choose the correct answer. - Provide formal feedback to the project manager - Review and prioritize the backlog - Define the stakeholder management approach - Improve the SCRUM process

- Provide formal feedback to the project manager - Review and prioritize the backlog - Define the stakeholder management approach - Improve the SCRUM process

What structure level do you see when you access the Roadmap Viewer and chose work stream navigation? Please choose the correct answer. - Scope item - Scenario - Task - Deliverable

- Scope item - Scenario - Task - Deliverable

What are deliverables of the Application: Integration work stream in the prepare phase? There are 3 correct answers to this question. - Security Checks - Network Connectivity Checks - Fit/Gap Analysis - Data Cleansing - Adaption Specifications

- Security Checks - Network Connectivity Checks - Fit/Gap Analysis - Data Cleansing - Adaption Specifications

When does the project team receive formal confirmation that the user stories are completed to the satisfaction of the product owner? Please choose the correct answer. - During the sprint review - During the sprint retrospective - During user acceptance testing - During the daily SCRUM meeting

- During the sprint review - During the sprint retrospective - During user acceptance testing - During the daily SCRUM meeting

Which deliverable is specific to on-premise and NOT for the cloud? Please choose the correct answer. - Knowledge Transfer - Technical Design Solution - Adaptation Specification - Learning Needs Analysis

- Knowledge Transfer - Technical Design Solution - Adaptation Specification - Learning Needs Analysis

What is SAP Activate? Please choose the correct answer. - A combination of SAP best practices , methodology, and guided configuration - A bundle of ASAP , SAP Launch , and Rapid Deployment Solutions - A methodology for each of the deployment modes ( cloud , on-premise, hybrid) - A step-by-step instruction on how to remove from SAP best practices to your custom solution

- A combination of SAP best practices , methodology, and guided configuration - A bundle of ASAP , SAP Launch , and Rapid Deployment Solutions - A methodology for each of the deployment modes ( cloud , on-premise, hybrid) - A step-by-step instruction on how to remove from SAP best practices to your custom solution

When do you perform User Acceptance Testing during the Agile Build? Please choose the correct answer. - After each Sprint - After Integration Testing - During each Firm-up Sprint - Before Integration Testing

- After each Sprint - After Integration Testing - During each Firm-up Sprint - Before Integration Testing

What must you do when you implement SAP Business Suite On-Premise with SAP Best Practices? Please choose the correct answer. - Assemble and apply SAP Best Practices to the system - Activate and apply SAP Best Practices content with the self-service configuration UI - Apply SAP Best Practices with the Configure your Solution application - Activate and apply SAP Best Practices with SAP Solution Manager

- Assemble and apply SAP Best Practices to the system - Activate and apply SAP Best Practices content with the self-service configuration UI - Apply SAP Best Practices with the Configure your Solution application - Activate and apply SAP Best Practices with SAP Solution Manager

What is the focus of a SCRUM of SCRUMS in an Agile context? Please choose the correct answer. - Backlog management - Best Practice adoption - Integration topics - Communication to the Project Management Office

- Backlog management - Best Practice adoption - Integration topics - Communication to the Project Management Office

SAP now offers the ability to deploy and manage solutions in which of the following environments? Please choose the correct answer. - Cloud - Cloud and On-premise - On-premise - Cloud, On-premise and Hybrid

- Cloud - Cloud and On-premise - On-premise - Cloud, On-premise and Hybrid

Which collaboration features can SAP Activate Jam users access? There are 2 correct answers to this question. - Comment on documents - Ask questions - Tweet questions - Update Key Deliverable Wikis

- Comment on documents - Ask questions - Tweet questions - Update Key Deliverable Wikis

Which key deliverable includes the development of RICEFW objects? Please choose the correct answer. - Custom Extensions Management - Development Build - Sprint Execution - Enhancement Delivery

- Custom Extensions Management - Development Build - Sprint Execution - Enhancement Delivery

What does SAP Activate recommend to keep team members informed and aligned? Please choose the correct answer. - Daily progress review meeting with sponsor - Daily e-mail status updates to project manager - Daily status meeting with project manager - Daily team stand-up meeting

- Daily progress review meeting with sponsor - Daily e-mail status updates to project manager - Daily status meeting with project manager - Daily team stand-up meeting

Identify the two landscape transformation specific tasks in the explore phase. There are 2 correct answers to this question. - Define the Data Migration Architecture - Perform Client Transfer - Setup Landscape Transformation Software - Run a Landscape Transformation Assessment

- Define the Data Migration Architecture - Perform Client Transfer - Setup Landscape Transformation Software - Run a Landscape Transformation Assessment

In which phase do you verify that the SAP Best Practice solution scenarios meet the business needs of the customer? Please choose the correct answer. - Deploy - Prepare - Realize - Explore

- Deploy - Prepare - Realize - Explore

In which phase of the SAP Activate methodology does the team complete the Transformation Planning? Please choose the correct answer. - Deploy - Prepare - Realize - Explore

- Deploy - Prepare - Realize - Explore

In Which phase does the Transition to Operations work stream start? Please choose the correct answer. - Deploy - Realize - Prepare - Explore

- Deploy - Realize - Prepare - Explore

What is a difference between the SAP Activate methodology for a new implementation of SAP S/4HANA cloud edition and a new implementation of SAP S/4HANA on-premise? Please choose the correct answer. - For on-premise, there are additional deliverables for the system setup - For the cloud edition, there is an additional work stream for integration with on-premise systems - For the cloud edition, there is an additional Q-Gate for integration with on-premise systems - For on-premise, there is an additional Q-Gate for system installation

- For on-premise, there are additional deliverables for the system setup - For the cloud edition, there is an additional work stream for integration with on-premise systems - For the cloud edition, there is an additional Q-Gate for integration with on-premise systems - For on-premise, there is an additional Q-Gate for system installation

What is the key characteristic of Agile project delivery? Please choose the correct answer. - Frequent and detailed project scheduling - Formal and detailed documentation - Frequent Quality Gates - Iterative build with frequent inspections

- Frequent and detailed project scheduling - Formal and detailed documentation - Frequent Quality Gates - Iterative build with frequent inspections

Which of the following are the benefits of SAP JAM? There are 2 correct answers to this question. - Highly available - User collaboration - Reduced Recovery Time - Easy to use

- Highly available - User collaboration - Reduced Recovery Time - Easy to use

Which of the following statements about Scrum is correct? Please choose the correct answer. - In Scrum, the team is Self-organized, define all task necessary for all project life cycle. - The three ceremonies are sprint planning, daily scrum, sprint review (retrospective). - In Scrum, as best practices, we have three main roles, and three artifacts or three ceremonies. - Scrum Master defines and prioritizes features and gathers requirements.

- In Scrum, the team is Self-organized, define all task necessary for all project life cycle. - The three ceremonies are sprint planning, daily scrum, sprint review (retrospective). - In Scrum, as best practices, we have three main roles, and three artifacts or three ceremonies. - Scrum Master defines and prioritizes features and gathers requirements.

Which of the following is true about a cloud implementation project? There are 2 correct answers to this question. - In the prepare phase of a cloud implementation project the project team provide the customer with materials to review as self enablement. - Starter Systems are not required to be in place for the 'Fit to Standard' workshops. - The entire transport system is kept intact and up and running. - The Starter System is specific to SAP S/4HANA Cloud.

- In the prepare phase of a cloud implementation project the project team provide the customer with materials to review as self enablement. - Starter Systems are not required to be in place for the 'Fit to Standard' workshops. - The entire transport system is kept intact and up and running. - The Starter System is specific to SAP S/4HANA Cloud.

Which new project roles are introduced with the SAP Activate Agile methodology? There are 2 correct answers to this question. - Integration Lead - Design Thinking Coach - Product Owner - SCRUM Master

- Integration Lead - Design Thinking Coach - Product Owner - SCRUM Master

What is a benefit of using Guided Configuration instead of the Implementation Guide? Please choose the correct answer. - It eliminates the need to generate transport requests for configuration settings - It ensures SAP updates do NOT conflict with customer configurations - It ensures configuration is done using SAP Solution Manager - It eliminates the need for Content Lifecycle Management

- It eliminates the need to generate transport requests for configuration settings - It ensures SAP updates do NOT conflict with customer configurations - It ensures configuration is done using SAP Solution Manager - It eliminates the need for Content Lifecycle Management

How can the project manager help to keep momentum in the project and help to keep the customer involved? There are 2 correct answers to this question. - Leverage agile cycles to build and test the solution - Walk through the solution processes with stakeholders - Increase the number of Q-Gates - Add customer resources to the project to reduce the need for formal training

- Leverage agile cycles to build and test the solution - Walk through the solution processes with stakeholders - Increase the number of Q-Gates - Add customer resources to the project to reduce the need for formal training

In what respect is SAP Activate Methodology different from the ASAP Methodology? Please choose the correct answer. - Leverages iterative incremental build - Includes Fit/Gap analysis instead of Blueprint - Supports only new implementations - Supports cloud deployments

- Leverages iterative incremental build - Includes Fit/Gap analysis instead of Blueprint - Supports only new implementations - Supports cloud deployments

Which navigation option do you use in the Roadmap Viewer to access the SAP Activate Methodology content? Please choose the correct answer. - Navigate by work stream - Navigate by assigned Delivery Mode - Navigate by Project Team Member Role - Navigate by RACI matrix accountability

- Navigate by work stream - Navigate by assigned Delivery Mode - Navigate by Project Team Member Role - Navigate by RACI matrix accountability

How many deliverables are a part of the Key Deliverable 'Project Initiation'? Please choose the correct answer. - One - Two - Three - Four

- One - Two - Three - Four

Which content is made available after you activate SAP Best Practices for a new financial implementation? There are 2 correct answers to this question. - Online help - Standard chart of accounts - Implementation Guide - Pre-configured business processes

- Online help - Standard chart of accounts - Implementation Guide - Pre-configured business processes

What are the responsibilities of the Project Team on level 4 in the picture below? Level 1 Executive Board Sponsorship Level 2 Steering Committee Level 3 PMO Level 4 Project Team There are 2 correct answers to this question. - Perform status reporting and communication - Set Project policy, standards and oversight - Identify and resolve issues and risks - Set business priorities, goals and objectives

- Perform status reporting and communication - Set Project policy, standards and oversight - Identify and resolve issues and risks - Set business priorities, goals and objectives

Which activity helps the project team to add the user stories to the product backlog? Please choose the correct answer. - Planning the User Acceptance Test - Assessing Project Risks - Preparing a Project Schedule - Conducting the Solution Validation

- Planning the User Acceptance Test - Assessing Project Risks - Preparing a Project Schedule - Conducting the Solution Validation

In which phase of the SAP Activate Methodology doe the team complete the System Assessment? Please choose the correct answer. - Prepare - Explore - Realize - Deploy

- Prepare - Explore - Realize - Deploy

In which phase do you create a prioritized list of user requirements? Please choose the correct answer. - Prepare - Realize - Deploy - Explore

- Prepare - Realize - Deploy - Explore

Which of the following are not phases of the SAP Activate methodology? There are 2 correct answers to this question. - Prepare - Realize - Go-Live & Support - Preparation

- Prepare - Realize - Go-Live & Support - Preparation

Which estimation technique can be used in Agile project delivery to size the user stories during sprint planning? Please choose the correct answer. - Product Owner's relative estimate of the effort that will be needed to implement the user story - Detailed bottom-up effort estimate the breaks each user story up into hours or shorter tasks - Relative estimate in ideal person days that reflects the best estimate provided by the project team - Detailed bottom-up effort estimate by the SCRUM Master in story points based on the user story complexity

- Product Owner's relative estimate of the effort that will be needed to implement the user story - Detailed bottom-up effort estimate the breaks each user story up into hours or shorter tasks - Relative estimate in ideal person days that reflects the best estimate provided by the project team - Detailed bottom-up effort estimate by the SCRUM Master in story points based on the user story complexity

What is a deliverable of the Application. Customer Team Enablement work stream in the Prepare phase of SAP Activate? Please choose the correct answer. - Project Charter - Project Documentation - Learning plan - Knowledge transfer to end users

- Project Charter - Project Documentation - Learning plan - Knowledge transfer to end users

Who determines the priority of user stories in the backlog of an Agile project? Please choose the correct answer. - Project Team - SCRUM Master - Project Manager - Product Owner

- Project Team - SCRUM Master - Project Manager - Product Owner

Which of the following tasks are part of the Production support after the Go Live key deliverable? There are 2 correct answers to this question. - Provide further training to customer end users - Set up the Operations Control Center - Perform a Technical systems test - Resolve issues identified during the Hyper Care period

- Provide further training to customer end users - Set up the Operations Control Center - Perform a Technical systems test - Resolve issues identified during the Hyper Care period

Which accelerations can you use during the Scope Validation/Fit-Gap Analysis activity in the Explore Phase? There are 2 correct answers to this question. - RICEF Specification Template - Sprint Backlog Template - Solution Validation Workshop - Quality Gate Checklist

- RICEF Specification Template - Sprint Backlog Template - Solution Validation Workshop - Quality Gate Checklist

In which SAP Activate methodology phase does the team identify and design functional quick wins in scope of the conversion project? Please choose the correct answer. - Realize - Deploy - Prepare - Explore

- Realize - Deploy - Prepare - Explore

In which phase of the SAP Activate methodology does the team complete the Cut-over Rehearsal? Please choose the correct answer. - Realize - Deploy - Prepare - Explore

- Realize - Deploy - Prepare - Explore

In which of the following project phases is it important to plan and schedule data loads followed by load validation activities? Please choose the correct answer. - Realize - Explore - Prepare - Deploy

- Realize - Explore - Prepare - Deploy

Which of the following is a Key Deliverable of the Prepare phase? Please choose the correct answer. - Release and Sprint Plan - Change Impact Analysis and Communication Plan - Baseline Build - Solution Scope and Value Determination

- Release and Sprint Plan - Change Impact Analysis and Communication Plan - Baseline Build - Solution Scope and Value Determination

Arrange the following in the correct sequence of steps followed for a 'Fit to Standard' workshop. Please choose the correct answer. - Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Discuss how the process fit with customer requirements, Identify gaps, Identify required configuration, Enable customer on execution of scenarios - Discuss how the process fit with customer requirements, Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Identify required configuration, Enable customer on execution of scenarios, Identify gaps - Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Identify required configuration, Discuss how the process fit with customer requirements, Enable customer on execution of scenarios, Identify gaps - Demonstrate Business Scenarios and Concepts, Review Best Practice Process Flow, Identify required configuration, Discuss how the process fit with customer requirements, Enable customer on execution of scenarios, Identify gaps

- Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Discuss how the process fit with customer requirements, Identify gaps, Identify required configuration, Enable customer on execution of scenarios - Discuss how the process fit with customer requirements, Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Identify required configuration, Enable customer on execution of scenarios, Identify gaps - Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Identify required configuration, Discuss how the process fit with customer requirements, Enable customer on execution of scenarios, Identify gaps - Demonstrate Business Scenarios and Concepts, Review Best Practice Process Flow, Identify required configuration, Discuss how the process fit with customer requirements, Enable customer on execution of scenarios, Identify gaps

Which component of SAP Activate offers customers a reference solution in the cloud for a quick start? Please choose the correct answer. - SAP Implementation Assistant - SAP Best Practices - SAP Activate Methodology - Guided Configuration

- SAP Implementation Assistant - SAP Best Practices - SAP Activate Methodology - Guided Configuration

What tool do you use to configure an SAP Business Suite on-premise solution? Please choose the correct answer. - SAP Implementation Guide - Expert Configuration - Configuration Composer - ABAP Workbech

- SAP Implementation Guide - Expert Configuration - Configuration Composer - ABAP Workbech

In which tools can the project team across the SAP Activate Methodology content including accelerators? There are 2 correct answers to this question. - SAP Jam - Roadmap Viewer - SAP Service Marketplace - SAP Community Network

- SAP Jam - Roadmap Viewer - SAP Service Marketplace - SAP Community Network

Which tools does SAP Activate provide to support Guided Configuration? There are 3 correct answers to this question. - SAP Solution Composer - Expert Configuration - Model Company - Self Service Configuration - Solution Builder

- SAP Solution Composer - Expert Configuration - Model Company - Self Service Configuration - Solution Builder

What are the three pillars of SAP Activate? There are 3 correct answers to this question. - SAP Solution Manager - SAP S/4HANA in-memory database - SAP Best Practices - Guided Configuration - SAP Activate Methodology

- SAP Solution Manager - SAP S/4HANA in-memory database - SAP Best Practices - Guided Configuration - SAP Activate Methodology

Which of the following tools are used for rapid database migration? There are 2 correct answers to this question. - SAP Solution Manager - SWPM (software provisioning manager) - Software Update Manage (SUM) - Database Migration Option (DMO)

- SAP Solution Manager - SWPM (software provisioning manager) - Software Update Manage (SUM) - Database Migration Option (DMO)

Who determines the tasks that are required to complete the committed backlog items in a sprint? Please choose the correct answer. - SCRUM Master - Project Team - Product Owner - Project Manager

- SCRUM Master - Project Team - Product Owner - Project Manager

What is the hierarchy level under Phase in the SAP lam space for SAP Activate on-premise? Please choose the correct answer. - Scenario - Task - Work Stream - Key Deliverable

- Scenario - Task - Work Stream - Key Deliverable

In the System conversion to SAP S/4 HANA Deploy phase, which of the following tasks are included? Please choose the correct answer. - Scheduling project plan - Hyper care support - Interface setup - Final Testing

- Scheduling project plan - Hyper care support - Interface setup - Final Testing

How do you gain access to the SAP Activate Methodology Jam site? Please choose the correct answer. - Send e-mail to SAP contact address - Submit e-mail address via on-line form - Register on SAP Service Marketplace - Join SAP S/4HANA group on SAP Community Network

- Send e-mail to SAP contact address - Submit e-mail address via on-line form - Register on SAP Service Marketplace - Join SAP S/4HANA group on SAP Community Network

Which accelerator can help you document the detailed design of solution extensions? Please choose the correct answer. - Sprint Backlog Template - Product Backlog Template - RICEF Specification Template - Change Request Template

- Sprint Backlog Template - Product Backlog Template - RICEF Specification Template - Change Request Template

What is a key characteristic of SAP Activate for new implementations of S/4HANA cloud edition? Please choose the correct answer. - Start with executable content - Design-based - Limited involvement of business stakeholders - Waterfall approach

- Start with executable content - Design-based - Limited involvement of business stakeholders - Waterfall approach

The tasks associated with Landscape transportation are in which workstream? Please choose the correct answer. - System & Data Migration - Application Solution Adoption - Technical Architecture and Infrastructure - Transition to Operations

- System & Data Migration - Application Solution Adoption - Technical Architecture and Infrastructure - Transition to Operations

Which of the following SAP S/4HANA Landscape Transformation options are enabled? There are 3 correct answers to this question. - System Consolidation - Migration of Business Units - Security Migration - Migration of Selected Applications - System Upgrade

- System Consolidation - Migration of Business Units - Security Migration - Migration of Selected Applications - System Upgrade

What is the most granular level of the methodology you can view in the Roadmap Viewer? Please choose the correct answer. - Task - Scenario - Phase - Deliverables

- Task - Scenario - Phase - Deliverables

What is the purpose of the Solution Validation activity in the Explore phase? There are 3 correct answers to this question. - To challenge changes to standard - To log additional scope items - To verify technical installation - To identify gaps - To educate project participants

- To challenge changes to standard - To log additional scope items - To verify technical installation - To identify gaps - To educate project participants

What is the purpose of the scrumboard? Please choose the correct answer. - To manage the resource load - To document the results of integration testing - To show the functional breakdown of the solution scope - To visualize team progress

- To manage the resource load - To document the results of integration testing - To show the functional breakdown of the solution scope - To visualize team progress

What is the purpose of a firm-up sprint? Please choose the correct answer. - To perform sprint testing - To run end-to-end integration test - To revise a release plan and sprint plan - To demonstrate functionality from previous sprint

- To perform sprint testing - To run end-to-end integration test - To revise a release plan and sprint plan - To demonstrate functionality from previous sprint

What is the purpose of the Solution Builder tool in the SAP Activate Guided Configuration? Please choose the correct answer. - To personalize activated ready-to-run business processes - To activate the Best Practices content - To create customer-specific scope items - To create data building blocks for complementary content

- To personalize activated ready-to-run business processes - To activate the Best Practices content - To create customer-specific scope items - To create data building blocks for complementary content

What is the purpose of the SAP Activate Methodology? Please choose the correct answer. - To provide end-to-end integrated application lifecycle management - To accelerate the initial implementation of SAP S/4HANA - To enable access to the SAP ecosystem - To manage project and solution documentation

- To provide end-to-end integrated application lifecycle management - To accelerate the initial implementation of SAP S/4HANA - To enable access to the SAP ecosystem - To manage project and solution documentation

Which of the following tasks are required in the Prepare Phase? There are 3 correct answers to this question. - Train the project team - Identify relevant SAP Best Practices - Set up the infrastructure to support the project - Define the communication plan - Approve the test strategy

- Train the project team - Identify relevant SAP Best Practices - Set up the infrastructure to support the project - Define the communication plan - Approve the test strategy

What can users do in the Roadmap Viewer tool? Please choose the correct answer. - Upload SAP Activate WBS into SAP Solution Manager 7.1 - Display and navigate detailed SAP Activate methodology WBS - Create a customer-specific version of SAP Activate Methodology -Download full SAP Activate Methodology content for use offline

- Upload SAP Activate WBS into SAP Solution Manager 7.1 - Display and navigate detailed SAP Activate methodology WBS - Create a customer-specific version of SAP Activate Methodology -Download full SAP Activate Methodology content for use offline

What technique helps agile project teams to prioritize a large, flat backlog? Please choose the correct answer. - User Story Mapping - Fit/GAP Analysis - Retrospective - Planning Poker

- User Story Mapping - Fit/GAP Analysis - Retrospective - Planning Poker

Which activities are part of the Application: Solution Adaption work stream of SAP Activate for new implementations? There are 3 correct answers to this question. - Value Audits - Change Management Plan - Production Support Plan - Scope Validation - Value Determination

- Value Audits - Change Management Plan - Production Support Plan - Scope Validation - Value Determination

Your project is performing some high-level planning for a System Conversion journey from SAP Business Suite to SAP S/4HANA on-premise edition. What is the correct sequence of selected key deliverables across the project phases? A. Production Readiness Check B. Detailed system Assessment C. Code Adjustment D. Validation of Migration

B. Detailed system Assessment C. Code Adjustment D. Validation of Migration A. Production Readiness Check

Your project is preparing for the Fit/Gap analysis workshops. If you use the Agile approach, what sequence of activities do you perform in the Explore Phase? A. Conduct Solution Validation workshops B. Set reference value C. Prioritize initial backlog D. Conduct Delta Design workshops

B. Set reference value A. Conduct Solution Validation workshops C. Prioritize initial backlog D. Conduct Delta Design workshops


संबंधित स्टडी सेट्स

Ch. 29 Growth and Development of the Adolescents

View Set

Pharmacology Ch. 13, Central Nervous System Stimulants and Related Drugs

View Set

MGT 18 Class 2: Groups and Teams

View Set

HIS 101 - Western Civilization to 1689 - Final Exam Study Questions

View Set