BUS 135 Ch 9
____________ uses computers to help design products.
CAD
__________ involves computers directly in the production process.
CAM
__________ is the specialized area of management that converts or transforms resources into goods and services.
Operations management.
__________ is the creation of goods and services using land, labor, capital, entrepreneurship, and knowledge.
Production
A(n) __________ _________ puts together components to make a product.
assembly process
A production process characterized by long production runs to turn out finished goods over time is known as a(n):
continuous process.
The six sigma approach to quality control:
detects potential problems early to prevent their occurrence.
Firms often use a(n) _____________ when working on a major project involving the production of a large item such as an airplane, ship, or bridge.
fixed-position layout
SitRite Furniture Company uses labor and machinery to transform wood, plastic, metal and cloth into comfortable chairs, sofas, and love seats. This process creates:
form utility.
A production process characterized by a short production run and frequent adjustments to machines so that different products can be produced is known as a(n):
intermittent process.
With the __________ inventory control system, producers hold only the right amount of materials and parts that they need for a short period of time - sometimes just a few hours.
just-in-time (JIT)
In the past, the idea behind mass production was to:
make large quantities of products at lower cost and achieve economies of scale.
MRP is a technique that helps managers:
make sure that the right parts and materials are available at the right time.
In ___________ _________, materials are physically or chemically changed to produce a product.
process manufacturing
The goal of lean manufacturing is to:
produce goods and services with less of everything that goes into the process.
In manufacturing, one way to compete with cheap labor is to:
use robots.
The ___________ National Quality Award is given to firms that achieve an outstanding level of overall quality based on performance in seven key areas.
Malcolm Baldrige
A firm that is certified as meeting both ISO 9000 and ISO 14000 standards has demonstrated:
world-class management of both quality and environmental standards.
One strategy U.S. manufacturers have employed in order to become more competitive is:
relying on advanced technology and the Internet to integrate all the partners and suppliers.
In today's quality control programs, emphasis is placed on:
achieving customer satisfaction by providing defect-free products.
A big advantage of computer integrated manufacturing software is that it:
makes it possible to custom-design products to meet the needs of small markets with very little increase in cost.
___________ is a computer application that enables a firm to combine computerized functions of all divisions and subsidiaries of the firm into a single, integrated software program that uses a single database.
Enterprise resource planning (ERP)
__________ is the physical arrangement of resources in the production process.
Facility layout
__________ is the process of selecting a geographic location for a company's operations.
Facility location
___________ utility is the value added by the creation of finished goods and services using raw materials, components, and other inputs.
Form
A bar graph that shows what projects or tasks are in process and how much of each is completed is called a(n):
Gantt chart.
___________ is a set of international standards for quality management and quality assurance.
ISO 9000
____________ examines statistical samples of product components at each stage of the production process and plots the results on a graph in order to spot and correct any variances from desired quality levels.
Statistical process control
In a PERT network, the sequence of tasks that takes the longest to complete is called the:
critical path.
The purpose of a PERT network is:
to monitor the progress of a multi-step project during its development to ensure on time completion.