CMST 1011
An RFI means a ____.
"request for information"
Quality is meeting the acceptance criteria __% of the time.
100%
____ is an area that is affected by ethics.
Bidding
Palmisano uses ____ for estimating.
Bluebeam
The guest lecturer, John Manion, works for ____.
Broadmoor
"BIM" stands for ____ Information Modeling.
Building
____ includes material delivery tickets.
Documentation
____ should be involved in the development of a company safety manual.
Employees
____ controls are at the top of the hierarchy of hazard control.
Engineering
___ has to do with what is right and wrong.
Ethics
___ is what makes a hazard a risk.
Exposure
____ are the number one cause of accidents on a construction site.
Falls
The presenter's first rule regarding changes to the work is "___ ___ ___ ___"
First, do no harm.
____ is a key to implementation of a Target Value Delivery.
Innovation
Palmisano uses a ____ ____ on its construction sites.
Job Box
Our guest lecturer, Rudy Comeaux, works for ____ Company.
Lemoine
The guest lecturers on Software work for ____ Construction.
Palmisano
PPE stands for ___ ___ ___.
Personal Protective Equipment
Palmisano uses ____ __ for its scheduling.
Primavera P6
Palmisano uses ______ for its field management.
ProBuild
____ ___ is part of construction close-out.
Punch list
One of the objectives of __/__ is doing the job correctly the first time.
QA/QC
Selection of subcontractors is part of ____ ____, not ____ ____.
Quality Assurance (not) Quality Control
Building code inspections are part of ____ ____.
Quality Control
Testing of materials is part of _____ _____, not _____ _____.
Quality Control (not) Quality Assurance
____ is the most important thing for a contractor on a project.
Safety
"TQM" stands for ____ Quality Management.
Total
____ ____ is part of Lean.
Value Engineering
A site layout plan _____ employee parking.
addresses
Contract ____ is managing the conditions of the contract.
administration
A stop sign is an example of an ____ control.
administrative
Final payment ___ ____ made before final submittals.
are not
Litigation ___ ____ the preferable solution to disputes.
are not
The preconstruction conference should involve _____.
as many people as possible
A safety officer at a company must have ____ to take corrective actions if a hazard is identified.
authority
Unsafe ____ cause more safety problems than unsafe conditions.
behaviors
The ____ of safety are one of the learning objectives of the first presentation.
benefits
BIM allows "____" a project in a virtual world before actually building it.
building
Everyone in a company needs to "___ ___" to the company ethics.
buy in
Delays in construction are expected and ___ be measured.
can
Behaviors of an employee are one of the things that may be ____ in a robust safety program.
changed
Commissioning is part of construction ___-___.
close-out
BIM is used mostly in ____ construction.
commercial
Palmisano Construction does mostly ____ projects.
commercial
A company's managerial ____ should include safety.
commitment
A construction project should be monitored to assure contract ____.
compliance
Palmisano self-performs ____ work.
concrete
ProCore is a ____ management program.
construction
A Certificate of Substantial Completion should be recorded at the ____.
courthouse
Palmisano is a design-build / ____-____ company.
design-assist
Four workers ___ ___ ___ in the Mississippi oilfield explosion.
did not die
Elimination of a risk may cause ____.
disengagement
Most industrial contractors ___ ____ sub out around 90% of the work.
do not
Superintendent responsibilities ___ ____ include personally processing pay applications.
do not
Cost control requires ____.
documentation
Corrective action ___ ___ wait until the project is completed.
does not
Removing and reworking incorrect work ____ ____ cost approximately twice that of doing it right the first time.
does not
Safety training ____ ____ address the issue of why the need for robust safety plans.
does not
Waiting is one of the ____ types of waste addressed with Lean.
eight
Lean has to do with identifying and ____ waste.
eliminating
A system evaluation does include ____ interviews.
employee
Elimination is an example of ____ controls.
engineering
Hazards may be created by a change of materials or ____.
equipment
Permits are part of the ____ plan.
execution
Scheduling is used in BIM as a ____ dimension.
fourth
BIM is ____ for "what if" situations.
good
BIM is a ____ tool for site planning.
good
Knowing the contract will ____ you when it comes to a change order.
help
Field observations are ____ for tracking quality.
helpful
Hiring is ____ regarding company ethics.
important
Subcontractor performance is ____ in evaluating project performance.
important
The status of productivity is ____ in management of a project.
important
There are ____ costs that may be saved by having a safety program.
indirect
Changes are ____.
inevitable
Ethics is taught; it cannot be ____.
innate
It ___ a good idea to have diversity in abilities on a construction team.
is
Quality ____ "meeting or exceeding the requirements established in the design documents."
is
A detriment of Lean ___ ____ decreased productivity.
is not
An SOV (schedule of values) ____ __ the contractor's budget.
is not
Drafting the contract documents ___ ___ one of the contractor pre-construction tasks.
is not
Estimating ___ ___ used in BIM as a sixth dimension.
is not
It ___ ____ best to calculate productivity from the RSMeans book.
is not
Retainage ___ ___ a penalty amount kept by the owner.
is not
Small room mindset ___ ___ a component of a Lean Operating System.
is not
Substantial completion ___ ____ when the project is completely paid.
is not
Construction impact ____ may include dust control.
issues
Unforeseen conditions ____ a change order.
justify
With conventional project delivery methods over half of the projects are delivered ____.
late
There are ____ _____ to consider when doing a change order.
legal implications
Operation and ____ manuals are part of contract close-out.
maintenance
Completion date forecasts are part of ____ reports.
management
Ethical violations should be addressed by ____.
management
Hazard identification can be classified by ____ used.
materials
Safety should be a part of a company's ____ ____.
mission statement
Hazard ____ is a primary component of a job hazard analysis.
mitigation
BIM is ____ dimensional.
multi
Ethics decisions are ___ either black or white.
not
Goals for the construction team should ___ be set by the superintendent alone.
not
Change ___ are an area where ethical violations can occur.
orders
Safety culture should be a part of the ____ value system of a company.
organizational
With conventional project delivery methods over half of the projects are ____ budget.
over
BIM is a good tool for communicating with the ____.
owner
Quality is determined by the ____ expectations.
owner's
Final ___ is part of contract close-out.
payment
The ____ procedures should be discussed at the preconstruction conference.
payment
Key performance indicators measure ____ against the goals.
performance
The quality of the work force impacts ____.
performance
BIM is a good tool for ____.
presentations
Time is one of the scopes to consider when ____ a change order.
pricing
Fiscal considerations should enter into the reason for a safety ____.
program
Inspection is needed when determining ____.
quality
When the plan doesn't work, stop and ____.
re-plan
Change orders may arise from ____ compliance.
regulatory
One of the goals of Lean Design & Construction is to achieve ____ workflow.
reliable
Team activities include identifying who has what ____.
responsibilities
The three primary ethical directives are loyalty, honesty, and ____.
responsibility
One of Palmisano's core markets is ____.
restorations
One of the results of a robust safety program is that workers believe they have a ___ to a safe workplace.
right
A change order means accepting more ____.
risk
Legal obligations are one reason for a ____ safety program.
robust
A clean site equals a ____ site.
safe
A clear expression of employee concern should be a policy component of a ____ manual.
safety
Proper tools and equipment is a ____ consideration.
safety
Submittals include ____ drawings.
shop
Changes orders __ ___ be seen as an opportunity to make a large profit.
should not
Documentation ______ ____ include opinions of the person preparing it.
should not
Establishment of ____ ____ is one of the purposes of the preconstruction conference
site rules
Superintendent responsibilities include ____ coordination.
subcontractor
Deliveries and inspection of materials are ____ responsibilities.
superintendent
A job hazard analysis focuses on jobs and _____.
tasks
There are ____ project close-out reports.
three
Ethics starts at the ___.
top
It is the will to prepare to win that separates success from failure.
true
Palmisano ____ Post-It stickies on its construction projects.
uses
Generation of ____ is one of the six tenets of Lean.
value
The gas that was absent in the Mississippi oilfield explosion ___ ___ nitrogen.
was not
Meetings with subcontractors should be at least ____.
weekly