CMST 1011

Ace your homework & exams now with Quizwiz!

An RFI means a ____.

"request for information"

Quality is meeting the acceptance criteria __% of the time.

100%

____ is an area that is affected by ethics.

Bidding

Palmisano uses ____ for estimating.

Bluebeam

The guest lecturer, John Manion, works for ____.

Broadmoor

"BIM" stands for ____ Information Modeling.

Building

____ includes material delivery tickets.

Documentation

____ should be involved in the development of a company safety manual.

Employees

____ controls are at the top of the hierarchy of hazard control.

Engineering

___ has to do with what is right and wrong.

Ethics

___ is what makes a hazard a risk.

Exposure

____ are the number one cause of accidents on a construction site.

Falls

The presenter's first rule regarding changes to the work is "___ ___ ___ ___"

First, do no harm.

____ is a key to implementation of a Target Value Delivery.

Innovation

Palmisano uses a ____ ____ on its construction sites.

Job Box

Our guest lecturer, Rudy Comeaux, works for ____ Company.

Lemoine

The guest lecturers on Software work for ____ Construction.

Palmisano

PPE stands for ___ ___ ___.

Personal Protective Equipment

Palmisano uses ____ __ for its scheduling.

Primavera P6

Palmisano uses ______ for its field management.

ProBuild

____ ___ is part of construction close-out.

Punch list

One of the objectives of __/__ is doing the job correctly the first time.

QA/QC

Selection of subcontractors is part of ____ ____, not ____ ____.

Quality Assurance (not) Quality Control

Building code inspections are part of ____ ____.

Quality Control

Testing of materials is part of _____ _____, not _____ _____.

Quality Control (not) Quality Assurance

____ is the most important thing for a contractor on a project.

Safety

"TQM" stands for ____ Quality Management.

Total

____ ____ is part of Lean.

Value Engineering

A site layout plan _____ employee parking.

addresses

Contract ____ is managing the conditions of the contract.

administration

A stop sign is an example of an ____ control.

administrative

Final payment ___ ____ made before final submittals.

are not

Litigation ___ ____ the preferable solution to disputes.

are not

The preconstruction conference should involve _____.

as many people as possible

A safety officer at a company must have ____ to take corrective actions if a hazard is identified.

authority

Unsafe ____ cause more safety problems than unsafe conditions.

behaviors

The ____ of safety are one of the learning objectives of the first presentation.

benefits

BIM allows "____" a project in a virtual world before actually building it.

building

Everyone in a company needs to "___ ___" to the company ethics.

buy in

Delays in construction are expected and ___ be measured.

can

Behaviors of an employee are one of the things that may be ____ in a robust safety program.

changed

Commissioning is part of construction ___-___.

close-out

BIM is used mostly in ____ construction.

commercial

Palmisano Construction does mostly ____ projects.

commercial

A company's managerial ____ should include safety.

commitment

A construction project should be monitored to assure contract ____.

compliance

Palmisano self-performs ____ work.

concrete

ProCore is a ____ management program.

construction

A Certificate of Substantial Completion should be recorded at the ____.

courthouse

Palmisano is a design-build / ____-____ company.

design-assist

Four workers ___ ___ ___ in the Mississippi oilfield explosion.

did not die

Elimination of a risk may cause ____.

disengagement

Most industrial contractors ___ ____ sub out around 90% of the work.

do not

Superintendent responsibilities ___ ____ include personally processing pay applications.

do not

Cost control requires ____.

documentation

Corrective action ___ ___ wait until the project is completed.

does not

Removing and reworking incorrect work ____ ____ cost approximately twice that of doing it right the first time.

does not

Safety training ____ ____ address the issue of why the need for robust safety plans.

does not

Waiting is one of the ____ types of waste addressed with Lean.

eight

Lean has to do with identifying and ____ waste.

eliminating

A system evaluation does include ____ interviews.

employee

Elimination is an example of ____ controls.

engineering

Hazards may be created by a change of materials or ____.

equipment

Permits are part of the ____ plan.

execution

Scheduling is used in BIM as a ____ dimension.

fourth

BIM is ____ for "what if" situations.

good

BIM is a ____ tool for site planning.

good

Knowing the contract will ____ you when it comes to a change order.

help

Field observations are ____ for tracking quality.

helpful

Hiring is ____ regarding company ethics.

important

Subcontractor performance is ____ in evaluating project performance.

important

The status of productivity is ____ in management of a project.

important

There are ____ costs that may be saved by having a safety program.

indirect

Changes are ____.

inevitable

Ethics is taught; it cannot be ____.

innate

It ___ a good idea to have diversity in abilities on a construction team.

is

Quality ____ "meeting or exceeding the requirements established in the design documents."

is

A detriment of Lean ___ ____ decreased productivity.

is not

An SOV (schedule of values) ____ __ the contractor's budget.

is not

Drafting the contract documents ___ ___ one of the contractor pre-construction tasks.

is not

Estimating ___ ___ used in BIM as a sixth dimension.

is not

It ___ ____ best to calculate productivity from the RSMeans book.

is not

Retainage ___ ___ a penalty amount kept by the owner.

is not

Small room mindset ___ ___ a component of a Lean Operating System.

is not

Substantial completion ___ ____ when the project is completely paid.

is not

Construction impact ____ may include dust control.

issues

Unforeseen conditions ____ a change order.

justify

With conventional project delivery methods over half of the projects are delivered ____.

late

There are ____ _____ to consider when doing a change order.

legal implications

Operation and ____ manuals are part of contract close-out.

maintenance

Completion date forecasts are part of ____ reports.

management

Ethical violations should be addressed by ____.

management

Hazard identification can be classified by ____ used.

materials

Safety should be a part of a company's ____ ____.

mission statement

Hazard ____ is a primary component of a job hazard analysis.

mitigation

BIM is ____ dimensional.

multi

Ethics decisions are ___ either black or white.

not

Goals for the construction team should ___ be set by the superintendent alone.

not

Change ___ are an area where ethical violations can occur.

orders

Safety culture should be a part of the ____ value system of a company.

organizational

With conventional project delivery methods over half of the projects are ____ budget.

over

BIM is a good tool for communicating with the ____.

owner

Quality is determined by the ____ expectations.

owner's

Final ___ is part of contract close-out.

payment

The ____ procedures should be discussed at the preconstruction conference.

payment

Key performance indicators measure ____ against the goals.

performance

The quality of the work force impacts ____.

performance

BIM is a good tool for ____.

presentations

Time is one of the scopes to consider when ____ a change order.

pricing

Fiscal considerations should enter into the reason for a safety ____.

program

Inspection is needed when determining ____.

quality

When the plan doesn't work, stop and ____.

re-plan

Change orders may arise from ____ compliance.

regulatory

One of the goals of Lean Design & Construction is to achieve ____ workflow.

reliable

Team activities include identifying who has what ____.

responsibilities

The three primary ethical directives are loyalty, honesty, and ____.

responsibility

One of Palmisano's core markets is ____.

restorations

One of the results of a robust safety program is that workers believe they have a ___ to a safe workplace.

right

A change order means accepting more ____.

risk

Legal obligations are one reason for a ____ safety program.

robust

A clean site equals a ____ site.

safe

A clear expression of employee concern should be a policy component of a ____ manual.

safety

Proper tools and equipment is a ____ consideration.

safety

Submittals include ____ drawings.

shop

Changes orders __ ___ be seen as an opportunity to make a large profit.

should not

Documentation ______ ____ include opinions of the person preparing it.

should not

Establishment of ____ ____ is one of the purposes of the preconstruction conference

site rules

Superintendent responsibilities include ____ coordination.

subcontractor

Deliveries and inspection of materials are ____ responsibilities.

superintendent

A job hazard analysis focuses on jobs and _____.

tasks

There are ____ project close-out reports.

three

Ethics starts at the ___.

top

It is the will to prepare to win that separates success from failure.

true

Palmisano ____ Post-It stickies on its construction projects.

uses

Generation of ____ is one of the six tenets of Lean.

value

The gas that was absent in the Mississippi oilfield explosion ___ ___ nitrogen.

was not

Meetings with subcontractors should be at least ____.

weekly


Related study sets

Critical Thinking Homework & Quizzes

View Set

NCEA Level 3 Biology - Plant and Animal Responses

View Set

Med-Surg: Chapter 50 Disorders of the Endocrine System Prep-U Q&A Level 8

View Set

BIOL 2083 Tophat questions Quiz 1

View Set

Lecture Exam 4 Ch 17, 18, 22, 23, 24

View Set

PSYCHOLOGY UNIT 4 CLASSICAL CONDITIONING

View Set