Construction management
According to the U.S. Green Building Council, what percentage of the world's energy use and greenhouse gas emissions can be attributed to buildings?
30-40%
not a role of contractors?
Produce Contract Documents
What CSI Division contains technical information on Structural Steel?
0.5
Which of the following is not a feature of specifications?
Quantity and Location
Turn key
A contract has been entered into whereby the Contractor agrees to design, build, purchase the land and finance the project. What is this type of contract called?
Master Format developed by the________ is a numbering organization system based on materials and their uses to provide an outline for construction specifications, the written portion of construction documents
CSI
A contract is entered into whereby the Design and Scope are partially undefined, the Owner holds a contract with the A/E, the Owner holds the contracts with each trade and the Owner also holds a contract with a management service company to perform the trade coordination, cost control and scheduling services. What is this type of contract called?
Construction Management
Your specifications reference this construction organization acronym of CSI that publishes numerous Technical Reference Sources. What is the correct name of CSI?
Construction Specifications Institute
Which of the following is not a role of contractors?
Delegate specific tasks to specialty contractors
The Owner wants to Fast-Track a construction project, Which type of contract best supports this process?
Design-Build
Sequential construction is most commonly associated with which of the following project delivery methods:
Design/bid/build
Which of the following is not a trend in the construction industry?
Design/bid/build
_______can be described by followings. Owner develops a conceptual design or program Next, using this conceptual information, a single design/build organization (entity) is selected to complete all remaining aspects of the project
Design/build
The LEED system deals with:
Sustainability in design, construction and Green building
Which of the following is not an example of a legal constraint an architect/engineer might face when designing a building?
The cost of borrowing money or cost reference
15-story hotel is built in China over the course of 6 days which is soundproof, thermal insulated and able to withstand a magnitude 9 earthquake.
True
A contract is entered into whereby the design and scope are undefined and the Owner agrees to pay for all Direct Labor, Materials, Equipment, plus some agreed upon allowance to the Contractor for their services. What is this type of contract called?
cost-plus