PD 1096

Lakukan tugas rumah & ujian kamu dengan baik sekarang menggunakan Quizwiz!

Chapter 1

General Provisions

Chapter 3

Permits "Per3its"

Exemption of building permit submission

Simple sketch Site location w/ vicinity maps

200 mm

4 hrs fire resistance solid masonry partition

Min standards

Apply to private and public buildings

Ancillary permit

Attachments: electrical, plumbing, mechanical, structural permit, etc.

15 years

Building collapse after completion - AoR or EoR

More than 1/3 of total floor area

Building in multiple fire zones Use more restrictive zone if _____

50% of building permit fee

Construction up to 2 mts (without permit)

5 sets

Plans, specs, signed and sealed of various professionals

Accessory permit

Preliminary activities: excavation, fencing permit

Fee exemptions

Public/ government buildings Traditional family dwellings - native materials, one family, 15,000 pesos total cost

Qualifications of Building officials

Registered and licensed architect or civil engineer Filipino citizen 5 years min member of good standing of IAPO 5 years of experience or recommendation of IAPO Attend and successfully completed a workshop on PD1096 conducted by DPWH

Dangerous building

Repair Vacate Demolishe

3 storey and above

Required soil test/ soil boring test Geological and geotechnical hazard - lot

Occupancy A

Residential - max of 10 occupants

Occupancy B

Residentials, hotels and apartments

Non fire restrictive zones

Rural All types of constructions are allowed

The Secretary

Secretary of DPWH Policy making Memorandum circulars Prescription of fees Appointment of BO Administration and enforcement imposition of penalties

Type 4 construction

Steel, iron concrete or masonry construction Incombustible interior (ceiling and wall)

Occupancy G

Storage and Hazardous

Dangerous building conditions

Structural hazard Fire hazard Unsafe electrical wiring Unsafe mechanical installation Inadequate sanitation and health facilities Architectural deficiencies

Fire restrictive zones

Suburban Type 1 construction not allowed

300 mm thick

Thickness of vault

Permit fees

80% - treasurer 80% - LGU 20% - national government 20% - building officials

Chapter 2

Administration and Enforcement

Building officials

Allowing proceed to construction

Permit requirements

Applicant forms If lot owned: OCT or TCT, tax declaration, current real property tax receipt If not: contract of lease or deed of absolute sale 5 sets of plans specs, signed and sealed of various professionals 3 sets of structural analysis and computation - except one story building and single detached not more than 20 sqm total floor area Soil test - 3 storey and above

Certification of occupancy

Application form Construction logbook - AiC or EiC As built plans and specifications - contractor; arch for review Notarized certificate of completion - issued by AoR Clearance fire safety inspection certificate - BFP

Building official (BO)

Appointed by DPWH Enforcement of the code in his jurisdiction Issues, denies and revokes permits Undertake inspection of building Acts on claims/ collects fees Representative of DPWH Annually inspection Quarterly situation reporting

Technical staff

Assist the secretary in administration and enforcement of the code and IRR

Permit

Before constructing, altering, repairing, converting, moving, adding, demolishing

Occupancy E

Business and mercantile

Certification of change of use

Change in use

RA 386

Civil Code of the Philippines

Chapter 7

Classification and general requirement of all buildings by use of occupancy "Classification and general requirement of all buildings by use of occupanc7s"

100 % of building permit fee

Construction above 2 mts (without permit)

Buildings condemnation

Dangerous, ruinous, nuisance building

25% of building permit fee

Foundation (without permit)

Written authorization

From the client; if architect files the permit

10 years

Grace period of filing a case after building collapse

RA 386, Art 3

Ignorance of the law excuses no one from compliance therewith

Erection

Installation of components or parts

Occupancy D

Institutional

15 days

Issuance of permit from payment of fees

Fire zones

LGU An area within which only certain types of construction are allowed, based on their occupancy, type of construction and resistance to fire

Type 3 construction

Masonry and woods 1 hour resistive Incombustible exterior wall

Building permit exceptions

Minor construction - 6 sqm or less structure; detached, private use; sheds, poultry, greenhouses 20 sqm or less open terrace or patios Window grilles 500 mm max deep garden pools 1.2 mts garden masonry heights Repairs - No structural No load bearing walls No addition and alteration Doors, windows, floors, fences, walls Plumbing fixtures

30 days

Occupancy permit

Non compliance

Order to demolish Work stoppage order

Expiration of permits

Within 1 year - if construction does not commence 120 days - construction does not resume after suspension or abandonments of work

Type 1 construction

Wood construction

Type 2 construction

Wood construction with fire resistant materials 1 hour resistive

Locational clearance

is a written authorization or permit to develop or use or construct in certain areas or any parcel of land based on approved plan use or zoning ordinance; in the absence of a zoning ordinance, the grant of permit shall be based on HLURB planning standard and guidelines.

15 mm - average cover to reinforcements 100 mm- overall depth

1 hr fire resistance floor construction Solid RC slab

150 mm

1 hr fire resistance hollow unit masonry partition

25 mm

1 hr fire resistance protection for metal structural members - concrete

38 mm

1 hr fire resistance protection for metal structural members - masonry

12 mm

1 hr fire resistance protection for metal structural members - metal latch with vernacular or petite gypsum board

125 mm

1 hr fire resistance solid concrete partition

125 mm

1 hr fire resistance solid masonry partition

25 mm - average cover to tendons 100 mm- overall depth

1 hr fire resistance solid pre stressed concrete slab

Grave violations

10,000 pesos Unauthorized change in plans Less fire resistive construction Non compliance abatement of construction Change of use Unattended open excavation- 120 days

20 mm - average cover to reinforcements 125 mm- overall depth

2 hrs fire resistance floor construction Solid RC slab

200 mm

2 hrs fire resistance hollow unit masonry partition

38 mm

2 hrs fire resistance protection for metal structural members - concrete

55 mm

2 hrs fire resistance protection for metal structural members - masonry

20 mm

2 hrs fire resistance protection for metal structural members - metal latch with vernacular or petite gypsum board

150 mm

2 hrs fire resistance solid concrete partition

150 mm

2 hrs fire resistance solid masonry partition

40 mm - average cover to tendons 125 mm- overall depth

2 hrs fire resistance solid pre stressed concrete slab

25 mm - average cover to reinforcements 150 mm- overall depth

3 hrs fire resistance floor construction Solid RC slab

250 mm

3 hrs fire resistance hollow unit masonry partition

50 mm

3 hrs fire resistance protection for metal structural members - concrete

75 mm

3 hrs fire resistance protection for metal structural members - masonry

38 mm

3 hrs fire resistance protection for metal structural members - metal latch with vernacular or petite gypsum board

175 mm

3 hrs fire resistance solid concrete partition

175 mm

3 hrs fire resistance solid masonry partition

50 mm - average cover to tendons 150 mm- overall depth

3 hrs fire resistance solid pre stressed concrete slab

Type 5 construction

4 hours although out Structural elements - steel, iron, concrete and masonry construction

25 mm - average cover to reinforcements 150 mm- overall depth

4 hrs fire resistance floor construction Solid RC slab

300 mm

4 hrs fire resistance hollow unit masonry partition

75 mm

4 hrs fire resistance protection for metal structural members - concrete

100 mm

4 hrs fire resistance protection for metal structural members - masonry

50 mm

4 hrs fire resistance protection for metal structural members - metal latch with vernacular or petite gypsum board

175 mm

4 hrs fire resistance solid concrete partition

65 mm - average cover to tendons 150 mm- overall depth

4 hrs fire resistance solid pre stressed concrete slab

Light violations

5,000 pesos Failure to post buildings permit or certificate of occupancy Failure to provide safety measures

Less grave violations

8,000 pesos Non compliance with work stoppage Use of building without occupancy permit

Occupancy F

Industrial

Fire resistance rating

Duration of material to withstand with fire Per hour

Occupancy C

Educational and recreation

Non issuance, suspension, revocation of permits

Errors in plans and specs Incorrect or inaccurate data declared Non compliace with the building code

10% of building permit fee

Excavations (without permit)

Chapter 6

Fire resistive requirements "Fire re6tive requirements"

Chapter 5

Fire zones "Five zones"

Exceptions in PD 1096

Traditional dwellings BP220 projects

Basis of computation of building permit

Type of occupancy or use Cost of construction (per sqm based on classification) - computed by OBO Floor area Height of the building Number of units

Chapter 4

Types of Construction Types "4" construction

Highly fire restrictive zones

Urban Type 1, 2, 3 are not allowed


Set pelajaran terkait

Chapter 15: Assessing Head and Neck

View Set

NUR336 Evolve: Chronic Inflammatory Bowel Disorder

View Set

Python Coding: Problem Solving & Understanding

View Set

Daftar kata 13: Binatang peliharaan dan binatang kesayangan - Pets & favourite animals

View Set

The nursing assistant in long-term care

View Set