PRACTICE MANAGEMENT: delivery of services (3)probe
construction manager as constructor (CMc)
2 phases (reconstruction & construction) - CM advises on constructibility, cost estimates, scheduling, negotiations, & early material purchasing - 2 pricing methods (cost of work + fee w/ or w/out a GMP)
C-series contract documents
other agreements
design-build
owner contracts with one person/firm to provide both design & construction services, that entity subcontracts work to others as needed - owner is responsible or developing performance requirements for designers/constructors
B-series contract documents
owner-architect agreements
A-series contract documents
owner-contractor agreements
conceptualization (IPD)
pre-design
criteria design (IPD)
schematic design
project delivery
the entire sequence of events that is needed to provide an owner with a completed building
practice methodologies
the various approaches that an architectural firm may use to complete various aspects of a project, including design, documentation, and coordination
design-bid-build (DBB)
traditional method - architect designs project / prepares CDs, contractors bid, contractor buildings the project while architect provides CA services - separate owner/architect & owner/contractor contracts
bridging
variation of DB approach in which the owner hires an architect or engineer (AE/criteria architect) to be the project manager - relieves owner of responsibility to develop project criteria
IDP - methods to establish contractual relationships between participants
w/ transitional forms, w/ a multi-party agreement, w/ a single purpose entity
multi-party agreements
a single agreement executed by the owner, architect, contractor, and other key project participants for the design, construction, and commissioning of a project - outlines a collaborative working relationship that encourages the parties to meet jointly established cost/performance goals
IPD advantages
better design, shorter project delivery time, lower project cost, quality construction, fewer problems during construction
buyout (IPD)
bidding from participants not included in the integrated team
generalist firm
completes a variety of project types, has principals/staff w/ a broad range of experience - typically uses studio organization
design-based firms
concentrate on developing solutions to problems that are unique and easily identifiable within the firm
IPD phases
conceptualization, criteria design, detailed design, implementation documents, agency review, buyout, construction, closeout
construction (IPD)
construction administration
implementation documents (IPD)
construction documents
fast-tracking
construction process is allowed to begin before the design process is completed using bid package drawings - requires many contracts/coordination but can reduce time/cost
G-series contract documents
contract administration and project management forms
detailed design (IPD)
design development
MacLeamy Curve
diagram that shows how IPD places more design effort earlier in project development when there is a greater ability to affect costs and the functional aspects of the building (traditional delivery method vs IPD method)
E-series contract documents
exhibits
selecting a project delivery method
factors: cost, schedule, project scope, building quality, & risk
single purpose entity (SPE)
independent limited liability company newly create for the sole purpose of planning, designing, and constructing a particular project - provides for a complete sharing of risk/reward in a full integrated collaborative process
specialized firm
may pursue projects on its own or team up w/ another generalist architectural firm that can provide the work force needs for full development of a design concept - typically using studio organization or departmental organization
integrated project delivery (IPD)
method in which all participants collaborate closely from the project's earliest conceptualization to move-in - different from DB in that the owner often has multiple agreements with independent design and construction firms (instead of just one)
design-assist contracting
method in which specialty subcontractors or trades are included early in the design and construction document phases to help with the development of complex or unique portions of the building - owner must develop a clear statement and scope of work, budget, and schedule
fixed priced method
method of establishing construction cost - owner knows final cost before construction begins and isn't responsible for overruns, but doesn't get any cost savings later on
cost-plus-fee method w/out a GMP
method of establishing construction cost - owner pays actual construction cost + agreed upon fee
cost-plus-fee method w/ a guaranteed maximum price (GMP)
method of establishing construction cost - owner pays actual construction cost + agreed upon fee, CM guarantees a max price, client can get cost savings if project is completed for cheaper
D-series contract documents
miscellaneous documents
transitional forms
modeled after CM agreements
construction manager as adviser (CMa)
CM is hired during design phase (no bidding - possible higher costs) - CM advises on constructibility, gives early cost estimates, does project scheduling, assists w/ contract negotiations, manages construction contracts & fast-track construction, makes early material purchases, & sometimes gives a guaranteed price/completion date - three methods for establishing cost