ACI Verbal Exam
What is the maximum allowable time between obtaining the first and final portions of the composite sample?
• 15 min
What is the minimum size for a sample when strength test specimens are to be molded?
• 28 L [ 1 cf ]
Start the tests for slump, temperature, and air content within how many minutes after obtaining the final portion of the composite sample?
• 5min
What action is required after the individual concrete samples have been transported to the place where tests are to be performed?
• Combine and remix the samples with a shovel
Start molding specimens for strength tests within how many minutes after fabricating the composite sample?
• 15 min
Describe the procedure for collecting a sample from a paving mixer.
• Discharge the contents of the paving mixer • Obtain samples from at least five different portions of the file
When sampling from a stationary or revolving drum mixer, what is collected and when is it taken during discharge?
• In two or more portions of concrete • At regularly spaced intervals • From the middle of the batch
From what must the concrete sample be protected?
• Sun, wind, and rapid evaporation • Contamination
What should be done if The concrete contains aggregate larger than is appropriate for the size of the molds or equipment being used?
• Wet seiving
What must occur befor a sample of concrete can be taken from a revolving drum mixer?
•All water and admixtures must be added to the mixer.
How are the sample portions obtained from the discharge stream of a stationary or revolving drum mixer?
•Repeatedly pass a receptacle through the entire discharge stream • Completely divert the discharge stream into a sample container