ACI Verbal Exam

Pataasin ang iyong marka sa homework at exams ngayon gamit ang Quizwiz!

What is the maximum allowable time between obtaining the first and final portions of the composite sample?

• 15 min

What is the minimum size for a sample when strength test specimens are to be molded?

• 28 L [ 1 cf ]

Start the tests for slump, temperature, and air content within how many minutes after obtaining the final portion of the composite sample?

• 5min

What action is required after the individual concrete samples have been transported to the place where tests are to be performed?

• Combine and remix the samples with a shovel

Start molding specimens for strength tests within how many minutes after fabricating the composite sample?

• 15 min

Describe the procedure for collecting a sample from a paving mixer.

• Discharge the contents of the paving mixer • Obtain samples from at least five different portions of the file

When sampling from a stationary or revolving drum mixer, what is collected and when is it taken during discharge?

• In two or more portions of concrete • At regularly spaced intervals • From the middle of the batch

From what must the concrete sample be protected?

• Sun, wind, and rapid evaporation • Contamination

What should be done if The concrete contains aggregate larger than is appropriate for the size of the molds or equipment being used?

• Wet seiving

What must occur befor a sample of concrete can be taken from a revolving drum mixer?

•All water and admixtures must be added to the mixer.

How are the sample portions obtained from the discharge stream of a stationary or revolving drum mixer?

•Repeatedly pass a receptacle through the entire discharge stream • Completely divert the discharge stream into a sample container


Kaugnay na mga set ng pag-aaral

Some collocation related pitfalls and problems in translation

View Set

Adding and Subtracting Rational Expressions

View Set

Algorithms Exam 2 Review: Dynamic Programming, Greedy Algorithms, & Amortized Analysis

View Set