ADM 111 MSSC Lockout/Tagout
When can another employees lockout lock be removed?
- When you have confirmed that the employee is not at the facility - When you have made al the reasonable efforts to inform the employee that his/her lock has been removed - When you have confirmed that the employee is aware of the locks removal before he/she resumes work
What does the acronym ECP mean?
Energy Control Program
A requirement of a lockout device is that to be removed, it must be substantial enough to withstand which of the following?
Excessive force
Which of the following is not one of the major factors of uncontrolled hazardous energy fatalities recorded by the FACFE program from 1982-1997?
Failure to verify that the energy source was completely energized before beginning work
True or False: LOTO devices may be reused for any other purpose.
False
The procedure by which each person places his/her own lock and tag on a piece of equipment before performing work on it is called ________.
Lockout/tag-out
Who may remove a LOTO device after maintenance or repairs are complete?
The person who secured the device
If an operator does not test equipment after it is locked out ________.
They should be retrained
Companies have the flexibility to develop the ECP and appropriate procedures that meet the needs of the workplace as long as the program and its procedures meet the OSHA standard.
True
True or False: The best way to prevent injury is to disengage or power off all energy sources to the machine or equipment by using an approved LOTO procedure.
True
All electrical circuits should be de-energized before maintenance by ________ to prevent accidents.
Using lockout procedures